An oak solid wood wardrobe quote looks complete at first glance: a product name, a total price, a delivery window. The problem is that joinery is made to measure, so two quotes for the "same" wardrobe can differ by a wide margin in what is actually supplied and installed. Before you sign, here is what a serious quotation should state, item by item.
1. The specification block, not the product title
A catalogue name such as Oak Solid Wood Wardrobes tells you the collection, not what will arrive on site. Ask for the specification behind the title: which components are solid timber and which are engineered board with a wood veneer or laminate face; the door construction (flat panel, hinged, sliding, shaker-style); carcass thickness; edge banding; and the brand and type of hinges, slides and handles. Suppliers who work to project drawings will have no difficulty issuing this detail alongside the price.
Where a quotation is built from a custom furniture and interior products manufacturer's workshop drawings rather than a catalogue page, expect to see dimensions called out per unit. Make-to-measure sizing, layout and finish options should appear as line items you can check against your own room dimensions.
2. How the price is built up
A single lump sum hides the trade-offs. A usable quotation breaks the figure into unit rates and quantities, with allowances for site conditions:
- Rate basis. Is the wardrobe priced per linear metre of run or per finished unit? State which, so alternative layouts can be compared on the same footing.
- Cut and fit tolerance. Older and refurbished properties rarely have square walls. Ask whether the price includes scribing, filler panels and trimming to out-of-level floors and ceilings.
- Interior configuration. Hanging rails, shelves, drawers, soft-close fittings and lighting are often quoted at base level with upgrades as extras. Confirm what your number covers.
- Finish schedule. Stain or paint colour, sheen level, number of coats and the sample that governs approval. Record the approved sample reference in the order.
3. Site preparation and interfaces
Joinery fails at the edges, where it meets other trades. A complete quotation says who is responsible for what: floor levelling where the carcass sits, packing and fixing to walls that will not carry a load, skirting removal and reinstatement, architraves, and any cut-outs around services. It should also state the sequence — whether flooring goes in before the wardrobe, and who protects the finished units while other work continues.
4. Moisture and movement
Solid timber moves with humidity. Ask how the design accommodates that: expansion gaps, acclimatised stock, and the moisture content recorded for delivered components. Where a wardrobe backs onto an external wall or sits near a bathroom, request the supplier's recommendation on ventilation and vapour control, and get it in writing. For bedroom runs in apartments and villas, this is usually a design detail rather than a cost item — which is exactly why it should be documented.
5. Delivery, packaging and what happens if a panel is damaged
For imported joinery the logistics line matters as much as the unit rate. Check whether the quotation covers export packing, container loading, freight to your port or site, customs documentation and delivery lead time from confirmed drawings. Then read the damage clause: how replacement panels are re-manufactured and shipped, who pays for them, and how quickly. A supplier offering logistics and door-to-door delivery with named coordinators is easier to hold to a schedule than a broker quoting a freight allowance.
6. Installation, snagging and after-sales
Clarify who installs: your local joiner following shop drawings, or the supplier's own team. Get the fixing method, the snag list process and the warranty scope in writing — what is covered, for how long, and what is excluded, such as site damage or misuse. For multi-unit work such as a villa or serviced apartment project, ask how defects across several bedrooms are handled, since one bad fitting set repeated across units becomes a programme risk.
7. What to expect from a one-stop supplier
When wardrobes, kitchen cabinetry, doors, wall panelling and flooring come from several vendors, each quotation covers only its own scope and the gaps land on the contractor. A one-stop furniture and building materials supplier should issue a single coordinated set of drawings and rates across those trades, with matching timber tones and profiles between wardrobes, doors and joinery. That coordination is worth more than the few percent you might save by splitting packages.
Before you sign: the checklist
- Specification sheet naming materials, door construction and hardware
- Shop drawings per unit, signed off against site dimensions
- Rate basis stated (per linear metre or per unit) with allowances for uneven surfaces
- Approved finish sample reference recorded on the order
- Interfaces defined: flooring, skirting, architraves, services, wall packing
- Delivery terms, documents and lead time from drawing approval
- Replacement-panel procedure and warranty scope with exclusions
- Installation responsibility and snagging process
A quick way to test a quotation: send the supplier your room dimensions and ask them to return shop drawings plus an itemised price within the same cycle. Suppliers who manufacture to measure will do it. Those who reply with a catalogue image and a total are quoting a product, not your wardrobe.
SANTERSON has manufactured furniture and building materials in China since 2008 and supplies project customers internationally, including villa projects in Sydney, Melbourne, Perth, Willoughby and North Turramurra. Enquiries about made-to-measure oak wardrobes and coordinated joinery packages can be sent to the project team through the contact page.