A swim spa of this size sits at the boundary between a pool, a spa and a piece of site infrastructure. Once it enters a villa garden, a resort terrace or a residential compound, the quotation stops being a product question and becomes a coordination question: what has to be true on site before the shell arrives, and which decisions have to be made before production starts. The checklist below follows the order we actually work in when a buyer sends us an enquiry about Outdoor Swim Spa WS-S12.
Start With the Envelope, Not the Model Number
The catalogue entry for this model gives overall dimensions of 11740 × 2200 × 1470 mm. Treat those figures as the shell, and then measure three separate things on your own drawings, because each one can fail independently.
- Clear opening on the delivery route. A shell of roughly eleven and three-quarter metres rarely travels through a finished doorway or a narrow side gate. Confirm the path from the truck to the foundation — gate width, corner clearances, overhead cables, tree canopy, and whether any fencing or glazing has to come down and be refitted.
- Foundation footprint with margin. The slab needs to carry the shell when full, so the bearing area should extend beyond the shell outline rather than match it exactly. Send us the finished level as well as the plan dimensions; that single number decides whether steps are recessed, raised or built separately.
- Service access after installation. Pumps, filtration and the control system sit inside the cabinet line. Leave an access side that stays reachable once paving, planting and perimeter screening are laid. This is the item most often lost in landscape drawings.
A useful habit is to send a marked-up plan rather than a verbal description: shell outline, access zone, finished floor levels, and the position of the nearest power feed and water supply. If you are also specifying Outdoor Swim Spa WS-S12-T, which is the same envelope with a swim training system added, one set of measurements covers both options and lets you compare them on price and use rather than on space.
Configuration Choices That Change What We Manufacture
The specification shown on our catalogue page for WS-S12 lists one control system, two water pumps, one filter pump, 73 jets in total, LED lighting together with a set of small underwater LEDs, and a power figure of 7.65 kW. Water jets, LED lighting and ozone are the features shown for this model. Treat those as the reference configuration we start from, not as a fixed order — the equipment list is agreed with you before production, and the signed order documents are what govern the delivered unit.
| Input we need from you | Why it changes the build |
|---|---|
| Intended use: lap swimming, hydrotherapy, children's play, guest amenity | Drives jet layout, seating depth and whether a swim training system belongs in the specification at all. |
| Climatic exposure of the site | Determines insulation level and how the shell is detailed for cold nights or strong sun. |
| Year-round use or seasonal use | Affects heating approach, including whether a heat pump is part of the package. |
| Water treatment preference | Ozone is shown on this model; UV sterilisation and sand filtration are catalogued options that have to be agreed before the plant bay is sized. |
| Accessories: steps, control system, pumps | Each accessory occupies space in the plant area and changes the assembly sequence on site. |
Availability and compatibility of options vary by model, so we confirm the complete configuration with you before production rather than substituting equipment later. Optional accessories catalogued for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps.
Electrical And Utility Information
The power figure in a catalogue is an aggregate; it is not what your electrician needs. For a swim spa of this class we ask the buyer's engineer to confirm supply voltage and phase, the available circuit capacity, the distance from the distribution board to the unit, and how the isolator and protective devices will be arranged. Local wiring rules and inspection requirements are handled by your local contractor — that is not our scope, and we would rather hear about it during design than at handover.
On the water side: where the fill supply comes from, whether there is a drain or an approved route for periodic drainage, and where backwash from filtration may be discharged. If your project has a rainwater tank or a bore supply, tell us at the enquiry stage, because water quality affects filtration choices.
Project Inputs That Affect Price and Delivery
Send these with the measurement pack and we can move straight to a meaningful quotation instead of a third round of questions:
- Quantity, and whether the units are identical or differ by villa, block or phase.
- Delivery address and site access conditions — port, last-mile constraints, crane or forklift availability on arrival.
- Your preferred Incoterms and who is handling customs clearance at destination.
- The programme date you are working to, including the point at which the foundation must be poured.
- Any finish preferences around the shell — coping, decking interface, perimeter screening — so we detail them together.
We handle freight forwarding, packing and container loading plans on our side, and you should still have your own import agent confirm duties and clearance requirements for your country. For multi-unit residential or hospitality schemes, batching the units into staged containers is usually cheaper than one large shipment, and we plan that around your construction sequence.
Where a Swim Spa Sits in a Wider Package
Most of these units are not bought alone. They arrive as part of an outdoor scheme that also includes poolside lounging, shading and hard landscaping. Coordinating the swim spa with the rest of the range is simpler when it is specified together: see our Swimming Pools and Swim Spas category for the wider configurator-style options in this family, including a customizable shape outdoor spa for sites where square, round, oval or curved footprints fit better than a straight shell.
If the same project also needs poolside furniture, pergolas and cabana daybeds, or the interior fixtures for the villas behind them, consolidating those scopes with one supplier reduces interface disputes between trades. That is the practical reason our turnkey solutions exist — one production schedule, one packing list set, one point of accountability.
How Custom & OEM Service Applies Here
Standard catalogue dimensions do not always match a completed landscape design. Where the envelope has to change, our Custom & OEM service covers bespoke sizing and material or finish choices, with prototyping and 3D modelling before tooling. Buyers specifying several units across phases often use it to lock one repeated detail — step arrangement, cabinet access side, coping interface — so that phase two matches phase one without renegotiation.
If you are specifying Outdoor Swim Spa WS-S12 or WS-S12-T for a villa, resort or residential compound, send us the site plan, the finished levels, the access route and your intended use. We will come back with a configuration proposal, an itemised quotation and a production schedule you can build around — contact us to start.