Partition sliding panels look simple on a drawing: two or three panels, a track, a wall opening. In production they are one of the least forgiving items in a joinery package, because every dimension is fixed by the building and every finish has to match cabinetry that was ordered months earlier. If you are specifying Santerson Partition Sliding Systems for a villa, apartment or hospitality fit-out, the quality of your first enquiry decides how many revision rounds follow. Here is what to have ready before you write to us.
1. The opening dimensions, measured the way the site will finish
Made-to-measure sliding systems are built around finished opening sizes, not structural ones. Send us the width and height of each opening as they will be once plasterboard, render, flooring and skirting are complete, and tell us which reference line each measurement is taken from.
- Floor to ceiling height at the highest and lowest point of the opening, so we can plan for slab level variation rather than assume a flat plane.
- Clear opening width at three positions along the run, since wall lengths rarely match setting-out drawings exactly.
- Available depth behind and beside the opening, which determines how panels stack when open and whether pocket detailing is needed.
- The finished floor build-up, including screed, adhesive and the flooring you intend to lay.
If the openings are still framed and unfinished, say so in your enquiry. We will treat the figures as provisional and flag what has to be re-measured after plastering.
2. How the panels must work, not just how they look
Tell us the function first, then the appearance. A panel that separates a dining room from a living area has different requirements from one that hides a study alcove or closes off a walk-in wardrobe.
- Number of panels per opening and the direction they stack when open.
- Whether the partition needs to close fully flat, overlap for visual privacy, or stay partially open as a decorative screen.
- Frequency of daily use, and whether children or guests will operate it.
- Whether acoustic separation matters. Where it does, review Santerson Acoustic Sliding Panels instead, and state the noise you are trying to reduce.
- Whether hardware should be visible or concealed, and whether handles, integrated pulls or a push mechanism are preferred.
This is also where you tell us if the same wall system appears elsewhere in the project. Sliding panels ordered as part of a wider wall-system package can share finishes and detailing with Integrated Door & Paneling, which keeps the joinery reading as one design.
3. Finish, substrate and the samples you need
Sliding panel faces are large, flat and viewed from an angle, so grain direction, sheen and edge detailing show up quickly. Choose finishes against the surfaces they will sit beside, not from a screen.
- Send finish references by code or physical sample, and name the adjacent cabinetry, door and wall finishes you are matching.
- State your preference for veneer, lacquer, matte or high-gloss surfaces, and note any requirement for a wipe-clean or commercial-grade surface in shared areas.
- Confirm whether panel faces may be reversible with different finishes on each side.
- Tell us if you want a pre-production sample of the finish and edge detail before full manufacturing.
Material and finish options are project-specific on these configurable listings, so treat our catalogue images as design direction rather than a fixed specification. We will confirm the exact substrate, surface and hardware combination for your opening at quotation stage.
4. Site conditions that change the build
Sliding systems fail far more often from site conditions than from panel quality. Include these details in your enquiry so we design for them rather than discover them on installation day.
| Condition to report | Why it changes the build |
|---|---|
| Ceiling construction and structure above the track | Determines fixing method, load path and whether additional support or a header is required. |
| Floor type in the opening | Timber, screed, tile and raised floors take different bottom guides and clearance allowances. |
| Level variation across the run | Large variation needs packing or a designed shadow gap instead of a nominally level head track. |
| Nearby services | Light fittings, sprinklers, ducting and trunking can block an overhead track or pocket. |
| Skirting, architrave and reveal depths | These decide how the frame meets the wall and whether panels clear existing trims. |
Photographs of each opening help more than a clean architectural elevation. A phone photo from both ends of the run, plus one square-on shot, usually answers half our questions.
5. Your programme, delivery address and who installs
Sliding panels are made-to-measure and arrive late in the sequence, so they need dates that match your site reality rather than an ideal schedule.
- The date your openings will be closed up and finished, not the date you want the panels shipped.
- Whether you are ordering a single opening or a batch across several units, and whether the batch can ship in stages.
- Delivery address, port of discharge and your preferred delivery terms. We arrange freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery, so we need the actual delivery point to quote properly.
- Who is installing: your own joiner or builder, our installation team, or a local contractor you appoint. Tell us which, because fixing details, tolerances and site guidance are prepared accordingly.
- Any on-site constraints such as lift access, restricted delivery hours or storage conditions.
If the panels form part of a wider package, send your full fixture schedule in one enquiry. Coordinating sliding systems with cabinetry, doors and wall panelling under one turnkey interior project solution removes the handover gaps between separate suppliers.
6. Drawings and documents to attach
- Plans and elevations showing every opening, in PDF, with dimensions legible at print size.
- A simple schedule listing each opening by room, width, height, panel count and finish code.
- Sections through the head and sill where a detail has already been designed.
- Finish samples or supplier reference codes for surfaces to be matched.
- Photographs of the actual openings if the work is on an existing building.
- Your project location and the contact who can confirm dimensions on site.
What you get back from a well-prepared enquiry
With dimensions, function, finishes and programme in one message, we can come straight back with a configuration proposal: panel layout, track and hardware choice, material and finish specification, itemised pricing and a realistic production slot. Where the openings are still provisional, we will mark which figures must be verified on site before manufacturing is released, so nothing is committed too early.
Send your opening schedule to us with the details above and we will confirm the specification for each partition. If you are also specifying closets or wardrobes in the same build, Santerson Closet Sliding Panels can be ordered to the same finish schedule, which keeps one finish standard across the whole project.