A two tone high gloss kitchen almost never comes back as one clean number. The glossy panels catch light, so every change in size, edge detail or lighting line shows up on the finished surface — and it shows up in the price sheet too. If your enquiry arrives with only a mood board and a room name, the supplier can only guess. This guide sets out exactly what to send so the quotation for two tone high gloss cabinets is close the first time, and stays close during production.
Start With the Drawings You Actually Have
You do not need a finished set of construction drawings before you ask for a price. What you do need is something measurable. In order of usefulness:
- A dimensioned layout — overall run lengths, wall-to-wall distances, ceiling height, and the position of windows, doors, ducts and downlights.
- An elevation of each wall the cabinetry touches, with floor levels marked. Gloss fronts are read by eye as continuous planes, so we need to see where a run starts and stops.
- Appliance schedules for anything built in: oven, cooktop, extractor, refrigerator, dishwasher, wine column. Model numbers matter more than descriptions.
- Wet-area information — sink position, tapware reach, waste and water inlet locations, splashback extent.
A hand-marked plan photographed on site is enough to begin with. A rough sketch with real numbers beats a beautiful render with none. Where drawings are still in progress, our design team can work from space planning and produce layout proposals and 3D visual renderings before anything goes into production — see interior design services.
The Four Decisions That Move the Price
Once the geometry is fixed, four choices decide most of the cost difference between two quotations that look similar on paper.
1. Which Two Tones, and Where They Split
"Two tone" only means something once you say where the split falls. Common splits are tall cabinets in one colour with wall units in another, base run in a deep tone with wall run in light, or island in one finish with the rest of the kitchen in another. Tell us the split line, and whether the same pairing repeats in wardrobes, media walls or pantry units elsewhere in the project — repeating a pairing across rooms is where batch consistency starts to matter.
Send a colour reference rather than a colour name. A paint chip name, a RAL number, a laminate sample code, or a physical swatch posted to the factory all work. Names such as "greige" or "warm white" mean different things to different manufacturers.
2. Surface System Behind the Gloss
High gloss is a finish family, not one product. Within our range it covers acrylic, lacquer, melamine and PVC surfaces, plus wood veneer in a gloss build-up. They differ in depth of reflection, edge treatment, resistance to handling, and cost per square metre. If you have a preference, name the surface system; if you do not, tell us the application — a private villa kitchen and a serviced-apartment kitchen where hundreds of people will use the same doors are specified differently.
Related finishes in the same collection include black high gloss cabinets, white high gloss cabinets and handleless high gloss cabinets, which is often the quickest way to show the direction you want.
3. Door Profile and Opening Hardware
Flat slab, handleless, shaker and aluminium-framed doors all take gloss differently, and they carry different tooling and edge-banding costs. Specify the profile, then the opening method: integrated handle channel, push-to-open, or visible handles with a finish. Also list internal hardware you expect — soft-close hinges and runners, pull-out corner carousels, lazy Susans, drawer banks, tall-unit pantry fittings. Hardware is usually quoted per item, so an omission here reads as "not included" rather than "assumed".
4. Lighting and Glass Elements
Gloss fronts and glass cabinets are a lighting decision as much as a storage decision. If the design includes glass-front units with LED strips, tell us where the strips sit, whether the driver is accessible, and who supplies the transformer and low-voltage cable. Mirror and smoked glass inserts, frosted panels and lit display shelving all need to be on the enquiry from the start.
What a Complete Enquiry Looks Like
This is the checklist we work from. Everything on it you can answer shortens the first round of questions considerably.
- Project type and quantity — one kitchen, or a repeat unit type across an apartment or villa group. Quantity changes both price and how samples are handled.
- Room dimensions and elevations, with ceiling heights and floor finish levels.
- Colour references for both tones, plus the split line between them.
- Surface system (acrylic, lacquer, melamine, PVC or veneer gloss) or the intended use if you want us to recommend.
- Door profile and opening method, with a reference image or product link.
- Appliance schedule with model numbers and dimensions.
- Worktop and splashback — material, thickness, edge detail, and whether you are supplying them or asking us to.
- Internal fitout — drawer configurations, pantry fittings, corner solutions.
- Lighting and glass — positions, driver access, who supplies electrical components.
- Delivery address and delivery terms, including site access constraints and lift or stair limits.
- Target programme — the date the cabinetry must arrive on site, not the date you want to place the order.
Details That Quietly Change the Number
| Item you send | Why it affects the quotation |
|---|---|
| Floor finish levels and ceiling height | Determines scribing, plinth height, filler panels and whether tall units can reach the ceiling. Missing these produces a price that changes at site measure. |
| Wall squareness notes or survey | Gloss runs read as one plane. Out-of-plumb walls mean site-adjustable carcasses and extra fillers, not a simple size swap. |
| Panel grain direction | Wood-effect gloss and veneer have a directional grain. Vertical on one elevation and horizontal on another must be drawn, or the finished room will look mismatched. |
| Batch and shade requirements | Where the same pairing repeats across units or phases, keeping colour and gloss level consistent across production batches needs to be planned into the order. |
| Packaging and handling notes | Gloss fronts are protected individually on site. Crating, panel thickness protection and container loading plan all sit in the delivered price. |
| Who installs | If we install, we need site access, trades coordination and programme dates. If your builder installs, we produce assembly drawings and fixing details instead. |
How the Order Runs After You Send It
For cabinetry made to measure, our process follows the sequence on our service pages: brief and design proposal, then quotation with detail confirmation, then production, shipment and follow-up. In practice that means a first quotation from your drawings, a round of specification questions, confirmed shop drawings for sign-off, and only then cutting. Because every unit is made to the project's dimensions, layout and finish rather than taken from a fixed catalogue size, sign-off on the drawings is the point where the price locks.
For projects that need more than cabinetry — joinery, wardrobes, wall panelling, vanities, loose furniture and finishes from the same source — custom and OEM service covers bespoke material, finish and texture choices alongside manufacturing to your specification. Grouping these into one order is how batch consistency across a whole floor or villa is managed rather than reconciled between several factories.
Freight and site delivery are quoted on the same enquiry when you give us the address and terms: sea, air or rail forwarding, customs documentation, container loading and door-to-door delivery. Tell us the last leg — apartment tower with a lift, gated villa, regional site — because that determines crating and handling as much as it determines freight cost. Logistics and door-to-door delivery covers the paperwork side; installation, snagging and after-sales support are arranged separately once the programme is set.
Frequently Asked Questions
Can you quote from a render alone?
We can give an indicative range from a render plus room dimensions, clearly marked as indicative. A firm price needs elevations with heights and the appliance schedule, because gloss cabinetry is cut to those dimensions.
Do you supply only the fronts or the whole cabinet?
Both carcass and fronts are made for each project, together with internal fitout. If your local joiner builds the carcasses and you want only the gloss fronts from us, say so on the enquiry — it changes the drawings we produce and the tolerances we work to.
How do I check the colour before production?
Send a physical reference where possible. Where a posted sample is not practical, confirm the colour code in writing and review the produced sample against it before sign-off. Gloss changes how a colour reads under light, so judge samples in the same lighting the kitchen will have.
Can one enquiry cover several apartments or villas?
Yes. Send one typical unit with its elevations plus a schedule of unit types and counts. Repeat units are quoted as a type, with variations listed separately.
Send us your drawings and colour references
Share your layout, elevations, appliance list and the two tones you have in mind. We will come back with a quotation and shop drawings for sign-off before production begins.
Contact PHILLIP — Phone / WhatsApp +86-13928214007 — Email santerson@qq.com