A two tone lacquer wardrobe is a made-to-measure item. The price follows the drawing, not the brochure, so a supplier can only return a usable number once the specification is complete. Below is the information we ask for on every enquiry, and why each line changes the quotation.

What "Two Tone" Means in a Lacquer Wardrobe

In our two tone lacquer wardrobes, two colours or two sheen levels are combined on the same run of joinery - typically a lighter field panel with a darker frame, or a high gloss door paired with a matte carcass. The contrast is what makes the piece read as a design feature rather than storage furniture, and it is also what adds cost: more lacquer systems, more masking between colour breaks, and more careful sequencing in the spray line.

Our Lacquer Wardrobes collection is specified per project. Finish, layout and dimensions are set to suit the room, so an enquiry that only says "3.6 m wardrobe, white and grey" cannot be priced accurately. Everything in the checklist below exists because it changes either the material list or the production route.

The Seven Items We Need Before Quoting

1. Room dimensions and the constraints around them

Send overall width, height and depth at several points along each wall, not one measurement taken in the middle. Floors and ceilings in renovation work are rarely level, and a wardrobe ordered to ceiling height has to be scribed or built with a pelmet. Also flag skirting boards, architraves, radiators, downlights, air-conditioning grilles, doors that swing into the run, and any pillar or beam in the way. If you have CAD drawings or a set-out plan, share them; if not, a dimensioned sketch with photographs of each wall is enough to start.

2. Door type and opening geometry

Hinged, sliding, or a combination of the two. This is one of the largest cost variables, because sliding doors need track systems, overlap clearances and a different carcass depth, while hinged runs need consistent reveal lines for the two tone effect to look intentional. Tell us which sections are corners - an L-shaped corner wardrobe needs blind-corner carcases, rotating accessories or angled shelving, and each of those decisions is priced separately.

3. Colour and sheen for each surface

For a two tone job we need the split defined surface by surface: door face, door edge, frame, carcass exterior, open shelving and interior. Give us RAL or Pantone references where you have them, or send a physical sample and we will match to it. State the sheen for each colour as well - matte and high gloss in the same run means two lacquer systems, and gloss panels need more preparation and handling than matte lacquer wardrobes. If you are still deciding, tell us the room's other finishes (flooring, wall colour, ironmongery) and we will propose combinations from the Lacquer Wardrobes range.

4. Internal layout, itemised by section

Long hanging, short hanging, shelves, drawers, pull-out trays, trouser racks, shoe shelving, lighting in the interior, and a safe or valet rod if required. Give us the section widths you want and where each function sits, because the internal fittings are quoted per unit and the carcass is built around them. A rough list of what actually has to live in the wardrobe - suits, dresses, folded knitwear, bags, luggage - tells us more than a generic layout copied from another project.

5. Substrate and edge treatment

The board behind the lacquer affects both price and performance in a bedroom environment: standard MDF for dry internal runs, moisture-resistant board where the wardrobe sits against an external wall or shares a wall with an ensuite, and plywood construction where heavy loads or long spans are involved. Tell us your preference if you have one; otherwise we specify it against the drawings and confirm it on the shop drawing before production. Edge banding versus lacquered edges also matters on visible returns.

6. Hardware, handles and the handleless question

Handleless profiles, integrated finger pulls and conventional ironmongery each carry different costs and different tolerances on the two tone line. Send the hinge and slide brand you normally use, or accept ours as an alternative. If a mirror, glass or glass and lacquer combination door appears in the design, note it early - glazed panels change door weight, hinge specification and packaging.

7. Quantity, site address and delivery terms

One wardrobe or forty changes both the unit price and the production schedule, so state the quantity per room type. Then give us the site address, floor level, lift dimensions or stair access, and your preferred Incoterms. Built-in joinery is shipped flat-packed in crates sized to the longest panel; if the panels will not fit a lift or a stair turn, we split the carcass and detail the joint on the drawing instead of discovering it on site.

Quick Reference: What Each Item Changes

Information suppliedWhat it determines in the quotation
Dimensioned drawings, level checksCarcass sizes, scribing and pelmet work, scribe panels
Door type per sectionTrack or hinge hardware, carcass depth, panel count
Colour and sheen scheduleNumber of lacquer systems, masking labour, finishing passes
Internal layout listDrawers, inserts, rods, interior lighting, accessories
Substrate choiceBoard specification, load capacity, moisture resistance
Handle and ironmongery choiceProfile cost, door tolerances, visible joint lines
Quantity, site access, IncotermsUnit price, crate design, freight method, on-site handling

How the Enquiry Moves Into Production

Once we have the items above, you receive an itemised quotation with the assumptions listed. After you confirm it, we produce shop drawings for sign-off - elevations, section details, the colour break lines and the internal layout - before any panel is cut. That drawing stage is where two tone schemes are usually corrected: a colour split that reads well on a mood board can land at an awkward height on a 2.7 m door, and it is far cheaper to move the line on paper than in a spray booth.

As part of our custom and OEM service, we can also produce prototype units, match finishes from a sample you provide, and apply your own branding or packaging where the project calls for it. Because wardrobes travel with the rest of the joinery package, many clients group them with built-in furniture such as vanities, media units and panelling under one production and shipping schedule, which reduces both freight cost and the number of site handovers.

Send us what you already have. A dimensioned sketch, three photographs of the room and a note of the colours you are considering is enough for a first quotation with stated assumptions. Drawings refine it; they do not have to exist before you ask.

A Short Checklist You Can Copy Into Your Enquiry

  • Room: overall width, height, depth at multiple points; floor and ceiling level notes
  • Obstructions: skirting, beams, pillars, grilles, downlights, door swings
  • Doors: hinged or sliding per section; corner sections identified
  • Colours: RAL or Pantone per surface, plus sheen (matte, satin, high gloss)
  • Internals: hanging lengths, drawer counts, shelf runs, lighting, accessories
  • Substrate preference and any moisture exposure
  • Handles: handleless profile, integrated pull or ironmongery
  • Quantity per room type, site address, access constraints, Incoterms
  • Programme: required delivery month and any site phases

Two tone lacquer work rewards a detailed enquiry. The more of the list above you can send on day one, the closer the first number is to the final invoice - and the fewer surprises at the drawing stage.

SANTERSON manufactures lacquer wardrobes, cabinetry and built-in joinery as part of a one-stop furniture and building materials package for villa, hotel and office projects. Send your drawings, sketches or finish samples and we will return an itemised quotation with the assumptions stated.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com

Enquire about your wardrobe package