A metallic lacquer kitchen looks expensive on a mood board and can look disappointing on site. The difference is rarely the paint itself. It is whether the designer who drew the elevation and the buyer who signed the purchase order agreed, in writing, on the same finish, the same panel geometry and the same verification step before production started.
SANTERSON manufactures metallic lacquer cabinets as part of a lacquer kitchen cabinet collection, and every run is made to measure: finish, layout and dimensions are specified per project. That flexibility is exactly why the handover between design and procurement has to be tight. Below is the alignment checklist we work through with designers and buyers on residential kitchen packages, so that the cabinets arriving on site match the drawing they were priced from.
1. Agree what "metallic" means before anyone draws a cabinet
The single most common source of rework is a finish word that both sides read differently. "Metallic", "high gloss", "pearl" and "silver" get used interchangeably in briefs, and they describe different things: a metallic flake content in the lacquer, a level of reflectivity, or simply a colour family.
Within our lacquer kitchen range these are separate product lines with different visual behaviour under kitchen lighting:
| Finish direction | What it reads like on site | Where designers usually place it |
|---|---|---|
| Metallic lacquer | Colour with depth and a soft reflective sheen; shifts slightly with the light | Feature runs, island fronts, handleless slab fronts |
| High gloss lacquer | Sharp mirror-like reflection; amplifies light and shows fingerprints and panel edges | Compact, well-lit kitchens where light bounce matters |
| Matte lacquer | Low-sheen, flat surface; softer and more forgiving on large uninterrupted fronts | Open-plan kitchens, tall bank of cabinets, dark tones |
| Two tone lacquer | Two finishes combined in one scheme to separate zones visually | Kitchens with a working wall and a display wall |
| Shaker lacquer | Framed panel profile with a lacquered surface; traditional proportion, modern colour | Transitional and classic schemes |
| Textured lacquer | Surface relief that catches light instead of mirroring it | Feature panels where a flat front would look plain |
The practical step: the designer names one product line, not a colour adjective, and the buyer quotes against that same name. If a project drawing is titled "silver metallic gloss", it should be resolved to one of these lines before any price is approved.
2. Lock the sheen and the flake in a physical sample, not on screen
Metallic lacquer is the least reproducible finish on a monitor. Screen rendering flattens the metallic particles, so a client approving from a render almost always expects something brighter than what arrives.
- Request a sprayed sample panel in the actual selected finish, not a colour chip or a catalogue scan.
- Look at that panel in the site's own lighting — under the ceiling fittings and under any integrated cabinet lighting — before signing off.
- Check it next to the worktop, splashback and flooring samples. Metallic fronts pick up neighbouring colours far more than matte ones do.
- Keep the signed sample. It becomes the reference for the delivered cabinets and for any later matching units in the same property.
Buyers should make the signed sample a condition of order confirmation, and designers should note its reference on the elevation drawings. That one line on the drawing removes most arguments at handover.
3. Match the front geometry to the finish, not the other way round
A metallic surface reveals the shape of the door. Two decisions follow from that and they need to be made together:
Handleless or handled
A handleless slab front gives the uninterrupted reflective plane that metallic lacquer is usually specified for, but it depends on profile detail — recessed pulls, pocket stays, motorised opens. A visible handle breaks the reflection and changes how the metallic effect reads across a run. Designers who specify a handleless look should say so in the schedule; buyers who price handles separately should confirm which is included.
Panel size and grain direction
Lacquer has no grain, but metallic effect does have a directional appearance, so tall doors and adjacent panels must be sprayed in a consistent direction. On a run of full-height cabinets this is worth stating on the drawing. Where a project also uses lacquer wall panels or lacquered wardrobe fronts in adjoining rooms, the same finish reference should be carried across so the joinery reads as one package rather than several purchases.
4. Put dimensions, tolerances and interfaces on one drawing set
Made-to-measure cabinetry only works when the measurement source is agreed. What we need from the design side, and what a buyer should expect to see before issuing a purchase order:
- Final room dimensions taken on site after plaster, screed and flooring are complete — not from architectural floor plans alone.
- Elevations with overall cabinet heights, plinth and carcass depths, and the reveal between runs.
- Appliance schedule with model references, so tall housings, oven towers and integrated fridge panels are cut to the right openings.
- Worktop and splashback interface: which edge detail sits on the cabinets, and whether the worktop is ordered by us or locally.
- Services positions for sinks, extractors and internal power, confirmed before the carcass layout is fixed.
The alignment test: if the designer's elevation and the buyer's purchase schedule show different overall heights for the same tall unit, production has not been authorised to start. This is where most metallic lacquer projects lose weeks.
5. Decide who verifies what, and when
For a project outside China, the sequence we normally run with turnkey project customers is:
| Stage | Designer signs off | Buyer confirms |
|---|---|---|
| Specification | Finish line, sheen, front profile, colour reference | Product name matches the quotation; quantities per elevation |
| Sample | Sprayed sample panel approved under site lighting | Sample reference recorded on the order |
| Shop drawings | Layout, reveals, appliance housings, handleless detail | Site-measured dimensions, delivery address, import terms |
| Production check | Photographs of sprayed fronts against the approved sample | Packing list, carton marks aligned with room schedule |
| Delivery and installation | Snag list against the approved drawing | Condition on arrival, spare parts held for the property |
Our custom and OEM service covers bespoke finishes and materials at project level, and logistics with door-to-door delivery handles freight, customs paperwork and container loading. What neither replaces is the two sign-offs above: a designer approving how it looks, a buyer approving what was ordered.
6. Specify the same way you would inspect it
A useful habit is to write the inspection point into the specification at the moment the finish is chosen. For metallic lacquer fronts, that means naming the viewing condition — "no visible orange peel or uneven metallic distribution when viewed at 600 mm under the installed lighting" — rather than a vague "flawless finish". A buyer can enforce that; a designer can defend it.
It also protects the client. When the specification states the approved sample reference, the front profile and the viewing condition, an on-site dispute becomes a comparison against documents instead of a matter of taste.
Send us the elevation and the finish name. If you are specifying metallic lacquer cabinetry for a residential kitchen or a villa package, share your drawings and the finish line you intend to use. We will confirm feasibility, made-to-measure sizing and the sample route before production is scheduled — through our contact page or via our interior fixtures range.
Frequently asked questions
Is metallic lacquer harder to keep looking new than matte?
Metallic sits between the two extremes. It shows fingerprints and surface marks far less than a high gloss front, but its reflective sheen makes any unevenness in spraying visible, which is why the sample approval and production photographs matter more than they would for a flat matte door.
Can we order metallic fronts now and matte fronts for a later phase?
Yes, but keep the signed sample. Lacquer batches sprayed months apart can differ subtly, and with a metallic effect that difference is visible where two runs meet. The approved sample reference is what we match a later batch against.
What information speeds up a quotation most?
A marked-up elevation with overall heights and run lengths, the selected product line rather than a colour word, and the appliance schedule. With those three, we can return a made-to-measure proposal instead of a list of questions.
Do designers and buyers usually send different documents?
Almost always. The designer sends elevations and finish references; the buyer sends a purchase schedule with quantities and site-measured dimensions. Problems start when nobody reconciles them. Reading both against one another before production is authorised is the cheapest control in the whole process.