Integrated lighting is the part of a joinery package most often priced as an afterthought, and it is also the part that causes the most rework on site. A driver, a profile, a diffuser and a cable route have to agree with each other and with the cabinet they sit in. If your quote for Santerson Integrated Cabinet Lighting reads as one line item, it is not yet a comparable quote. Below is the line-by-line review we suggest before you sign anything.
1. Scope: which fixtures, in which units, at what length
Our integrated cabinet lighting is made to measure, so the quote should list every lit element separately rather than a single "lighting allowance". Read the schedule and check that it names:
- the cabinet or wall unit each light belongs to, by drawing reference or elevation number;
- the run length in millimetres for each linear fitting, not rounded to a generic "per metre" figure;
- quantity of pucks, vertical strips or shelf fittings where lighting is not continuous;
- where switching, dimming and the driver housing sit, since these are usually quoted separately.
A quote that only says "LED lighting to cabinets" cannot be compared against a competitor's, because you do not know what either of them includes. Ask for the schedule to be reissued per unit before you place the order.
2. What is actually included in the price
Once the scope is clear, confirm which components sit inside the quoted rate and which are extras. The items below routinely appear as additions after award:
| Item | Why it matters at quote stage |
|---|---|
| Extruded profile and diffuser | Determines how the light line reads once installed: a clear diffuser shows individual points of light, an opal one reads as a continuous line. |
| Driver / transformer | Wattage must cover the whole run with headroom. An undersized driver fails early and is expensive to reach after installation. |
| Switch, dimmer or sensor | Door-triggered, motion-activated and manual switching are priced differently and need different wiring. |
| Cable runs and connection points | Concealed routing has to be built into the carcass; surface cabling is a site workaround. |
| Spare parts pack | Drivers and strips fail. Ordering spares with the batch costs far less than a later single-piece replacement order. |
| Control gear compatibility | If your project already has a dimming system specified, say so before the driver is selected. |
3. Electrical and technical details to see in writing
We supply this range as configurable product, and the electrical side is where we need your input rather than the other way round. Do not accept a quote that leaves these blank or states only "standard":
- input voltage and whether the fitting runs low-voltage DC or mains, and where the conversion happens;
- power draw per metre or per fitting, so you can check the driver sizing yourself;
- the required IP rating for any fitting in a wet zone; bathroom lighting sits close to showers and basins, and the rating is decided by zone, not by taste;
- dimming method, if dimming is wanted, and whether the quoted driver supports it;
- cable tail length and connector type, which decides how much on-site termination your electrician does.
For bathroom joinery specifically, cross-check the lighting line against the mirror and vanity items on the same package. The LED mirror cabinet and vanity lighting pages are configured the same way — finish, layout and dimensions to your space — so ask for their electrical data in the same format and compare all three together.
4. Finish, colour temperature and consistency across the package
Two fittings of the same "warm white" can look noticeably different once they are side by side on a dark panel. Colour temperature is not decided from a brochure name, so ask for:
- a stated colour temperature in kelvin for every fitting on the project, rather than a descriptive word alone;
- the profile finish where the extrusion is visible from the room;
- a sample or first-article fitting before full production, especially where lighting appears in kitchens, wardrobes and shelving from one order.
The same logic applies to lit display joinery elsewhere in the building. Where glass display cabinets carry built-in LED strips, the profile finish and colour temperature have to match the grey modern kitchen cabinets with LED glass wine cabinet in the same room — that package pairs flat panel doors with an LED-lit glass display cabinet — or the two lit areas read as unrelated.
5. Commercial terms that change the real cost
- Unit price versus package price. Lighting priced per fitting and lighting bundled into a joinery package are not the same comparison; strip both back to component level before judging value.
- Minimum order quantity. We work with flexible MOQs on custom and OEM work, but confirm the figure for lighting separately from cabinetry.
- Lead time. Ask whether lighting is produced with the cabinets or shipped separately; a split delivery means two container costs and two installation windows.
- Freight and Incoterms. Confirm what the quoted price covers up to your site, and which documents come with the shipment — commercial invoice, packing list and certificate of origin.
- Warranty and spares. Check what the quoted warranty covers on lighting and whether it runs on the same terms as the cabinetry, since drivers are usually the first component to need replacing.
6. A short pre-award checklist
Before signing: every lit unit named on the schedule; run lengths in millimetres; profile, diffuser, driver and control listed separately; voltage, wattage and IP rating stated; colour temperature fixed in kelvin; first-article sample approved; lead time and delivery split confirmed; spares priced. Anything missing from that list is a variation order later.
If you are assembling several packages for one project, it is worth putting the lighting, joinery and finishes onto a single purchase order so that one supplier carries the coordination. Our custom and OEM service covers bespoke dimensions, finishes and branding across furniture and interior fixtures, and our logistics and door-to-door delivery handles freight, customs paperwork and container loading for the combined shipment. Send us your drawings and the lighting schedule and we will return a quote you can compare line for line.