A swim spa of this size is a long-term asset, so the purchase decision should not stop at the model name. The checklist below covers everything a buyer or project specifier needs to settle before an Outdoor Swim Spa WS-PC08U is confirmed for production: footprint and access, the equipment actually included, the utilities it connects to, water treatment, delivery terms and after-sales arrangements.

1. Site, Footprint and Access

Start with the physical envelope. The catalogue lists the WS-PC08U at 8000 x 3000 x 1500 mm, so the shell alone occupies an eight-metre run. Before signing off on a location, confirm:

  • The clear internal length, width and depth you need for swimming, standing and seating, measured against the 8000 x 3000 x 1500 mm shell.
  • A working clearance around the cabinet for the control system, filter pump and any future service access, not just the outline of the shell.
  • Bearing capacity of the slab, deck or terrace. A filled shell of this size is a heavy point load; ask your structural engineer to confirm the supporting surface before delivery.
  • Whether the unit sits above ground on a prepared base, or is recessed into a surround, and who prepares that base.
  • The route from the delivery vehicle to the final position: gate widths, turning space, overhead lines and crane or forklift access if required.

2. Equipment Included in the Specified Configuration

The published specification for this model lists a control system of 1 set, 4 water pumps, 1 filter pump, a total of 33 jets, 1 LED light and a total power figure of 11.85 kW, with water jets, LED lighting and ozone shown as features. Treat that list as the catalogue baseline for the model, not as your final configuration: options change what arrives on the pallet. Ask the supplier to issue a written schedule of every item included in your order, matched line by line against the specification sheet.

It is also worth comparing sibling models in the same range before you commit. The Outdoor Swim Spa WS-PC08T shares the 8000 x 3000 x 1500 mm catalogue dimensions but lists a swim training system, 1 water pump, 28 jets, 3 LED lights and 10.85 kW total power. The Outdoor Swim Spa WS-PC08ST is narrower at 8000 x 2400 x 1470 mm with 6 jets, 4 LED lights and 6.55 kW, and the Outdoor Swim Spa WS-PC08ST-L extends that shell to 8490 x 2400 x 1470 mm. If lap swimming matters more than jet count, the model with a listed swim training system is usually the better fit; if massage seating drives the design, a higher jet total makes more sense.

3. Optional Accessories You May Still Need

Catalogue-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Decide now which of these belong in your order, because retrofitting later costs more than specifying them at production. A practical way to decide:

  • Heat pump if the spa will be used outside the warm months, since water heating dominates running cost.
  • Insulation for cooler or windy sites, which reduces heat loss from the cabinet and helps hold the set temperature.
  • Sand filtration as an alternative to the standard filter arrangement where water clarity under heavy use is a priority.
  • UV sterilization alongside ozone to lower the chemical load in the water.
  • Steps for safe entry, particularly where the shell deck sits well above the surrounding surface.

Availability and compatibility of these options vary by model, so confirm each one against your selected configuration rather than assuming it fits.

4. Power, Plumbing and Drainage

The catalogue shows 11.85 kW total power for the WS-PC08U as listed. Hand that figure to a local electrician early and confirm the supply, protection and cabling your site can actually deliver, together with the electrical requirements of the selected configuration. The same applies on the water side: fill source, drain arrangement, pump room or plant location, and where backwash or drainage water disposes. These are the items most often discovered late on site.

5. Water Treatment and Daily Upkeep

Ozone is shown as a feature on this model, which supports lower chemical dosing but does not remove routine maintenance. Agree in writing what the water treatment sequence is, what spare filters and consumables you should order with the unit, and what the recommended cleaning interval is for the jets, filter pump and shell surface.

6. Customisation and Project Supply

Where a standard shell does not suit the site, the range also includes spa products built to customised shapes such as square, round, oval and curved designs for gardens, terraces and leisure areas, and extended swim spas that pair a long swimming channel with a separate hydrotherapy area. For villa and resort schemes, a swim spa is easier to coordinate when it is procured with the rest of the outdoor package. SANTERSON works as a one-stop furniture and building materials supplier, so poolside loungers, dining sets, pergolas and the spa itself can be produced, shipped and tracked under one order rather than several. See the outdoor furniture collections and the wider swimming pools and swim spas range.

7. Delivery, Installation and After-sales Terms

Cross-border purchases turn on the paperwork and the responsibilities each party carries. Confirm with furniture logistics and door-to-door delivery what is quoted: sea, air or rail freight, packaging and container loading, customs documents such as commercial invoices, packing lists and certificates of origin, and where the supplier's responsibility ends. Then confirm who handles on-site installation and commissioning, inspection of snags at handover, and what installation and after-sales support covers for pumps, jets, controls and the shell. Import terms, duties and delivery scope should be settled case by case in writing.

8. Documentation to Keep on File

  • A signed specification sheet listing model, dimensions, pumps, jets, lighting, power and every option included.
  • Wiring and plumbing diagrams, plus the control system operating instructions.
  • Packing list, shipping documents and photographs of the crates at delivery, before unpacking.
  • A snag list agreed at handover, with responsibility and dates recorded.
  • Contact details for spare parts on water pumps, filter pump, jets, LED lights and the control system.

Figures quoted above are transcribed from the catalogue page for each model. Included equipment and electrical requirements vary with the selected configuration, so confirm the specification of your own order before production begins.

Send us the site photos, your required dimensions and the options you want, and we will return a configuration sheet for the WS-PC08U or the closer-matching model in the range, with freight arranged to your site. Contact SANTERSON to start the specification.