A solid colour melamine wardrobe looks simple on a drawing. Flat panel, single hue, no moulding. That simplicity is exactly why small gaps in the specification turn into expensive rework once production has started. Before we cut a single board for a Solid Color Melamine Wardrobe, our workshop needs the following items confirmed in writing. If you are sourcing built-in joinery for a villa or apartment project, treat this as a checklist you can send back to your designer or site team.
1. The dimensions that actually control the build
Wardrobe height is never one number. Our made-to-measure sizing starts from a site survey, and we need four figures separated out:
- Floor-to-ceiling height at three points along the run — slab levels vary, and a 10 mm fall across a 3 m wall shows up as a visible gap under the top panel.
- The finished floor level. If tiling or flooring has not been laid yet, tell us the build-up so we set the plinth height accordingly.
- Skirting, architrave and door-opening reveals that the carcass must scribe around.
- Any ceiling service — sprinkler head, downlight, air-conditioning grille or curtain box — that the top of the wardrobe has to clear.
For a walk-in or L-shaped run, we also need the corner dimension measured to the finished wall face, not the plasterboard face. Confirm which measurement is which on the drawing.
2. The exact colour, and how it will be judged
"Grey", "white" and "beige" are not specifications. Before production we lock the colour down in one of three ways, in order of reliability:
- A signed physical board sample from our finish library, kept on file as the reference for the whole batch.
- A supplier laminate or board code with batch and surface texture stated.
- A RAL colour reference — used only as a starting point, never as the final sign-off, because melamine reproduces some hues differently from paint.
Then confirm where the colour has to match something else: an adjacent Matte Finish Melamine Wardrobe, a kitchen door of the same hue, or a powder-coated aluminium frame. Different materials in the same colour read differently under site lighting, so matching items should be sampled together and approved as one set. Our Custom & OEM Service covers bespoke finishes and textures, but a new colour has to be developed before the production slot, not during it.
3. Substrate, edge and panel construction
The face finish is only one layer. Confirm with us:
| Item to confirm | Why it matters at production |
|---|---|
| Core board type and thickness | Sets screw-holding, hinge fixings and the maximum unsupported door width. |
| Edge treatment — matching ABS edge banding or a wrapped/moulded edge | Determines how visible the joint line is on a solid colour, especially on light hues. |
| Door construction — flat panel or framed | A large single flat door needs a stabilising solution; we advise the maximum practical width once the height is known. |
| Back panel thickness and fixing method | Affects how the carcass squares up on an uneven wall. |
4. Interior layout and hardware
Layout is tailored to each project, so we need it fixed before cutting rather than adjusted on site. Send us the hanging space heights, drawer stack positions, shelf spans, and any items that set those dimensions — an ironing board, a safe, a vacuum cleaner, a long-garment zone. Hardware choices follow from that layout:
- Hinges with or without soft close, and the opening angle where the wardrobe sits close to a bed or wall.
- Sliding or hinged doors. Sliding runs need the track recess confirmed at survey stage; hinged runs need clearance for the door swing.
- Drawer runners and load rating, plus handleless routed groove or profile handle if the design is handle-free.
- Integrated lighting: sensor type, cable route, transformer location and who supplies the mains feed.
5. Delivery split and site sequence
Built-in joinery fails more often from site sequencing than from manufacturing. Confirm before production: which trade lays the finished floor, when the wall paint is complete, and whether the wardrobe goes in as one assembly or in sections that pass through the door openings and lifts on site. Our Logistics & Door-to-Door Delivery service handles container loading, customs paperwork and freight by sea, air or rail, so we plan the packaging and pack list around the split you confirm. For multi-unit projects, agree the room-by-room release order at the same time, so nothing sits in a corridor waiting for a wet trade.
6. Who signs off what
Name one person per project who approves drawings, colour samples and any change after approval. A verbal change on site — a drawer moved, a shelf added — is only useful to us if it reaches the factory as a revised drawing before the panel is cut. Our Installation & After-sales Support covers on-site installation and inspection, but changes after production starts are re-manufacture, not adjustment.