Why This Approval Stage Matters

A swim spa is one of the few landscape elements on a villa or resort programme that cannot be corrected after the slab is poured. By the time the Outdoor Swim Spa WS-130BⅤ-U reaches site, the civil and electrical teams already need the pit dimensions, the power supply and the lifting route coordinated. The questions below are the ones we ask project teams to close out before a purchase order is released, so that specification risk is settled on paper rather than discovered during construction.

Confirm the Specification Line by Line

The catalogue publishes fixed figures for this model, but the option list decides what actually ships. Before sign-off, ask us to restate every line of the schedule in writing and mark it as standard, optional or excluded:

Specification lineCatalogue entryWhat to verify for your project
Shell dimensions9950 × 3000 × 1430 mmPit clearance, drainage fall and access width around the shell
Total power11.85 kWAvailable supply capacity, protection device and dedicated circuit at the switchboard
Water pump4 pcsHow the pumps are allocated across jet zones, and whether any duty/standby arrangement is required
Filter pump1 pcFiltration run hours and a plant position that leaves service access clear
Jet total23 pcsJet positions set against the seating layout you have approved
LED lights5Fixture positions, colour scheme and low-voltage supply
Control system1 setController location, user interface and whether staff need a separate access level
Swim training systemNot listed for this modelWhether the brief requires counter-current swim flow; if it does, review the variant noted below
Features shownWater jets, LED lighting, OzoneHow sanitisation is shared between ozone and any additional treatment

Model suffixes change the equipment. The catalogue also lists Outdoor Swim Spa WS-130BⅤ in the same 9950 × 3000 × 1430 mm envelope, and its published specification includes a swim training system with a different pump, jet and lighting arrangement. The two codes sit close together on paper and perform differently in use, so check that the same code appears on the quotation, the drawings and the shipping documents.

Decide What Goes Into the Optional Package

Catalogue-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so read that list as a starting point rather than a fixed bundle. Each choice carries a downstream consequence:

  • Heat pump. Sets an additional running load and where outdoor plant can be sited; check it against the total power figure your electrical engineer has already approved.
  • Insulation. Affects heat retention in cooler months and the build-up detail around the shell in the pit.
  • Sand filtration. Changes the plant footprint and the maintenance access you must leave clear.
  • UV sterilization alongside ozone. Confirm which treatment is included, so the water-quality brief does not assume equipment that was never quoted.
  • Steps. Fix the entry position early; it interacts with paving levels, handrail design and accessible routes.

Check Site Conditions Before Production Starts

The unit arrives ready to install, which means site readiness belongs to the approval stage, not the delivery week:

  • Structural support. Have your structural engineer confirm the pit base, perimeter support and load path against the delivered dimensions.
  • Electrical rough-in. Total power, cable routes, isolation point and bonding should appear on the electrical drawings before production is scheduled.
  • Drainage and overflow. Agree the drainage connection and any overflow route with the mechanical team.
  • Lifting and access. Verify the delivery vehicle route, crane or forklift access, and the working hours your site permits.
  • Finishes interface. Deck level, tile set-out and skirting detail around the shell belong on one coordinated drawing rather than three separate ones.

Read It as Part of a Wider Outdoor Package

On most villa and hospitality projects we furnish, the swim spa sits alongside pergolas, loungers and outdoor dining sets. Ordering them through one supplier keeps finishes, delivery windows and site supervision aligned. Our Turnkey Interior Project Solutions cover design coordination, production, Furniture Logistics and Door-to-door Delivery and Furniture Installation for Interior Projects, so the swim spa runs against the same programme as the rest of the outdoor areas instead of becoming a separate trade.

If your brief requires swim training in this footprint, raise it at approval stage. We will confirm which model in the range carries that system and reissue the specification, rather than leaving an assumption to surface during commissioning.

Approval Checklist

  • Model code on the quotation matches the code on drawings and shipping documents
  • Every specification line confirmed as standard, optional or excluded
  • Total power signed off against the supply actually available at the switchboard
  • Pit base, support detail and drainage agreed with the civil and mechanical teams
  • Optional package priced, scheduled and reflected in the drawings
  • Lifting route, delivery window and site access confirmed with the principal contractor
  • Commissioning responsibilities and handover documentation named in the contract

Questions We Are Asked at This Stage

Can the specification change after production has started?

Pumps, jet count and filtration are built into a pre-assembled plant set, so we review any post-production revision case by case. Closing the option list before the order is released keeps the programme intact.

Can the swim spa be supplied with the surrounding outdoor furniture?

Yes. As a One-stop Furniture and Building Materials Supplier, we produce pergolas, loungers, dining and lounge sets alongside the swim spa range, and consolidate them into coordinated consignments.

Who carries out installation and commissioning?

Our service scope covers on-site installation, inspection and handover. The electrical connection is made by your licensed contractor, and we provide the technical documentation they need to do it correctly.

Before You Release the Order

Send us the model code, your current site drawings and the options you want priced. We will return a confirmed specification with the electrical and civil requirements flagged for sign-off, which is usually what settles the approval conversation in one round instead of several.