Why the Same Model Can Receive Different Quotations

An outdoor swim spa is not a single fixed item. The model code identifies the shell, the layout and the baseline equipment set, but pumps, sanitisation, heating, insulation and access items are selected separately. Two buyers who both ask for Outdoor Swim Spa WS-S06CT-L can receive very different prices if one wants a heat pump and sand filtration while the other does not. Sending the information below with your enquiry lets us return a quotation you can actually compare against other offers, instead of a placeholder figure that changes after the first call.

How the -L Variant Differs From Its Closest Relative

Within the S06 family, variants differ in overall length, height, jet count and power draw. The -L shell is 6670 mm long against 5880 mm for WS-S06CT; both listings show 31 jets and 8.35 kW total power, and the extra length sits in the swim lane rather than the seating end. Treat that as a planning constraint, not a preference: it decides whether the unit passes through your access route, how much deck it occupies and where the paving grid has to stop. Buyers who compare only model codes often discover after the paving is laid that the longer shell no longer clears the path.

The Site-Listed Baseline for WS-S06CT-L

Before options are added, this is what our product page already states for the model. Check it against your own drawings so that we are quoting the same thing you are planning to install.

  • Model: WS-S06CT-L
  • Catalogue dimensions: 6670 x 2380 x 1400 mm
  • Control system: 1 set
  • Swim training system: 1 set
  • Water pump: 1 pc
  • Filter pump: 1 pc
  • Jet total: 31 pcs
  • LED lights: 4
  • Total power: 8.35 kW
  • Features shown: water jets, temperature setting, LED lighting, ozone, swim training system

Those figures are the catalogue listing for the standard configuration. Any item you add or remove moves both the price and the installation requirements, which is why we ask for the details in the next sections rather than answering "how much is the S06?" with a single number.

1. Site Access, Foundation and Unloading Route

The 6670 mm length and 1400 mm depth determine whether the unit reaches its final position at all. Please tell us:

  • The finished location: ground floor slab, terrace, rooftop, sunken pit or an indoor plant room.
  • Whether the spa is fully exposed, partially covered by a pergola or enclosed inside a building, because that changes the insulation and cover you should specify.
  • The clear path from the delivery point to the position: gate widths, turning radius, stair runs, overhead beams and any lift capacity if the unit goes to an upper level.
  • Slab thickness and load notes from your structural engineer, plus drainage gullies or an overflow route near the installation.

A plan view and one section drawing of the area are worth more than a long written description. If you are furnishing the pool deck as part of a wider package, our turnkey solutions cover that coordination alongside the spa itself.

2. Power Supply and Electrical Boundaries

Total power for this configuration is listed at 8.35 kW, and that figure rises once a heat pump is added. Please include in your enquiry:

  • Available supply: single phase or three phase, voltage and frequency at the site.
  • The distance from the main switchboard or distribution board to the spa's control position, so cable sizing and voltage drop can be assessed rather than guessed.
  • Who supplies and installs the dedicated circuit, isolator and residual-current protection: your electrical contractor or our team on site.
  • Whether you want an energy metering point or a timer schedule for commercial operating hours.

This is also where local rules come in. Tell us the country and city, and we will confirm what we can document for your certifier on a case-by-case basis; we do not assume that requirements carry over from one project to another.

3. Water Treatment, Heating and Insulation Choices

Ozone treatment is shown as a standard feature for this model. The catalogue also lists options that materially change the quotation: control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. For each of these it helps to know your preference and why:

  • Sanitisation: ozone alone, or ozone plus UV; how often the spa is used and by how many bathers, since that drives filtration and dosing load.
  • Heating: target water temperature, whether the spa runs year-round, and whether a heat pump is being considered for running-cost reasons.
  • Filtration: cartridge or sand filtration, and who performs routine cleaning in a hotel or gym setting.
  • Insulation and cover: relevant where night-time air temperature drops or where the spa sits outdoors through an unheated season.
  • Access: steps, handrail position and entry height, particularly for hospitality, aged-care or family use.

If you are still weighing this model against others in the range, our swim spa and swimming pool collection lists comparable configurations, so you can check length, jet count and power side by side before fixing on a variant.

4. Quantity, Project Type and Programme

A single private villa installation and a resort block with several units are packaged and scheduled differently. Please state:

  • Quantity of units and whether they share one plant room or need separate systems.
  • Project type: private residence, hotel or resort, gym, spa, clubhouse or developer display.
  • Required delivery window and any site milestone that cannot move, such as a handover date or a construction freeze.
  • Whether other fit-out items are being bought together, so the spa can be consolidated into one shipment and one installation visit.

5. Delivery Terms and After-Sales Expectations

Our logistics and door-to-door delivery service covers freight forwarding by sea, air or rail, packaging and container loading, customs paperwork and shipment tracking. To price the transport leg we need:

  • Delivery address and the nearest port of discharge you normally use.
  • Your preferred Incoterms, and whether you want cargo insurance arranged through us or your own broker.
  • Receiving arrangements on site: truck size limits, unloading equipment, and whether a crane or forklift is required at the destination.
  • The documentation your approval process requires, such as wiring diagrams, hydraulic layouts and packing lists, so we can confirm which items we provide.
  • The level of support you expect after installation from our installation and after-sales service, including commissioning attendance, spare-parts holdings and who carries out routine maintenance.

A Short Checklist to Paste Into Your Enquiry

  • Model: Outdoor Swim Spa WS-S06CT-L, with the catalogue specification confirmed or amended.
  • Location, access route, slab and drainage notes, plus plan and section drawings.
  • Supply type, voltage, distance to switchboard, and who owns the electrical scope.
  • Chosen options: UV sterilisation, heat pump, sand filtration, insulation, steps, control upgrades.
  • Quantity, project type, required delivery window.
  • Delivery address, Incoterms, insurance preference, unloading arrangements.
  • Required documentation for approval: wiring diagrams, hydraulic layouts, packing lists.
  • After-sales expectation: commissioning, spares, maintenance responsibility.
Where a figure is critical to your design, ask us to confirm it in writing for the exact configuration you are buying. Catalogue dimensions and power ratings describe the listed standard build; options, site conditions and local requirements can change them.
Send those details to SANTERSON with your drawings and we will return a line-by-line quotation covering the spa shell, selected equipment, packaging, freight and installation support. As a China-based manufacturer of furniture and building materials operating since 2008, we also supply the surrounding outdoor furniture, wall and ceiling finishes, lighting and bathroom fixtures, so a poolside package can be quoted and shipped as one coordinated order. Share your drawings early: they decide what is feasible long before the price does.