A matte acrylic wardrobe is one of the easiest built-in pieces to specify badly. The finish reads beautifully on a sample board and looks flat and calm in a render, yet the finished run depends almost entirely on numbers nobody wrote down: which wall the unit starts from, how far the floor drops across its length, what the ceiling does above the door swing, and which way the doors are meant to travel. If you are ordering built-in storage for apartments, villas or hotel guest rooms, the brief below lists the measurements and project inputs that let a factory quote the right unit the first time instead of re-cutting panels after site installation.

Start with the room envelope, not the door elevation

Wardrobe carcasses are built to millimetre tolerances, but bedrooms are not. Before any drawing is issued, take the envelope of the space the unit will occupy and record it as a set of paired figures rather than one nominal size.

  • Width at three heights. Measure the wall line at floor level, mid-height and near the ceiling. Older and refurbished villas rarely give the same number three times; the largest deviation tells you whether scribing is needed.
  • Depth at several points along the run. Skirting, door reveals, radiator positions and existing plaster build-up all reduce usable depth. Note the shallowest point, not the average.
  • Floor-to-ceiling height at both ends of the run and in the middle. This decides whether a full-height carcass fits, whether a soffit or top panel is required, and how much adjustment the levelling legs must absorb.
  • Out-of-plumb and out-of-level readings. A laser line across the run tells the factory how much of the gap will be taken up by scribing panels and how much by adjustable feet. Without this figure, top panels are cut to a nominal ceiling height and arrive on site either short or proud.
  • Obstructions drawn in position. Switches, sockets, air-conditioning outlets and returns, light switches at the door line, downlights, curtain boxes and skirting heights all change where a carcass can start and stop.

Then fix the door type, because it drives the clearances

The door decision is not decorative; it changes the dimension list. A hinged wardrobe needs clear swing space in front of the unit and a case that sits clear of handles on adjacent walls. A sliding unit needs an internal track allowance and a fixed overlap between leaves, and it cannot project into a traffic aisle the way a hinged door does. Corner and L-shaped runs add another variable: which leg is built first, and how the corner carcass transfers load.

Decide this before requesting a quotation, and state the room's available circulation distance from the front face of the case to the opposite wall or bed edge. For matte sliding door wardrobes, that clearance figure and the total run length together determine how many leaves are practical and where the overlap can fall without blocking access to the interior.

Specify the finish as a project input, not an afterthought

Matte acrylic is a surface decision with measurable consequences. It shows fingerprints far less than a high-gloss panel, which matters in guest rooms and rental apartments that housekeeping cleans daily, and it reflects light diffusely, so a long run of doors reads as a flat plane instead of a mirror wall. The same sheet material behaves differently under raking daylight and under warm bedside lighting, so confirm the colour and sheen against a physical board in the actual room lighting before sign-off, not from a screen proof.

Our matte acrylic wardrobes are made to measure for each project, with the finish, layout and dimensions specified per space. Where a design mixes finishes across a bedroom or continues a panel into a media wall or niche, send the adjacent surface references as well, so edge banding, handles and profiles can be matched to the same batch rather than approximated later.

Send the internal layout as a room-by-room schedule

Factories quote carcasses, not intentions. A usable schedule lists, for each unit in the project:

InputWhat to record
Unit identificationRoom or apartment number, wall reference from the architectural drawing, and a marked-up photo of the space.
Envelope dimensionsWidth, depth and height ranges with the deviation readings described above, in millimetres.
Door type and countHinged, sliding or open; number of leaves; opening direction; handleless or profile handle.
Internal zoningLength of hanging rail for long garments, double-hang sections, drawer banks, shelf spans, shoe or linen zones, and any lighting provision.
Occupant profileHanging-to-folded ratio for the type of unit: serviced apartment, family villa, or long-stay suite all differ.
Interface detailsSkirting treatment, scribing preference, cornice or shadow gap, adjacency to curtains, and floor finish build-up at the threshold.
Quantity and phasingUnits per type, delivery sequence by floor or block, and storage conditions on site between arrival and installation.

Confirm the inputs before production starts

The single most expensive mistake in built-in storage is re-measuring after the carcasses are cut. Where the site is still being finished, take the envelope measurements once screed, floor finish and ceiling set-out are complete, and have the same figures confirmed by whoever will install. For multi-unit projects, sample one room first, install it, and use that installation to fix the standard for the rest of the run.

Where a project needs storage designed around the wall rather than ordered from a fixed catalogue, our custom minimalist bedroom wardrobe option covers personalised sizes, internal layouts, door styles and surface finishes, with the same measurement discipline applied before drawings are issued.

How a one-stop supplier turns this into fewer site problems

Wardrobes rarely sit alone in a project package. The same bedroom needs wall panelling, doors that align with the wardrobe face, lighting inside the case, and often flooring that runs to the threshold under the hanging rail. When these come from separate suppliers, the tolerance gaps get argued about on site instead of being resolved on paper. As a one-stop furniture and building materials supplier, we handle built-in storage together with the surrounding finishes, and coordinate design consultation, material selection, manufacturing, quality control and project management as one package. Our custom and OEM service covers bespoke finishes and layouts for project-specific requirements, and freight is arranged through our logistics and door-to-door delivery arrangements so the panels arrive where the installer can actually reach them.

Preparing a wardrobe schedule for an apartment, villa or hotel project?

Send us the room drawings and the envelope readings listed above. We will review the door type, internal zoning and finish selection with you, then issue shop drawings for confirmation before any panel is cut. Contact PHILLIP to start the specification review.