A submittal is where a media unit stops being a picture on a spec sheet and becomes something a builder can price, coordinate and install. For the Santerson Open & Closed Combo Units, that document carries extra weight because the unit is configurable: layout, dimensions and finish are set per project rather than chosen from a fixed catalogue size. The checklist below covers what a complete submittal package should contain, so approvals do not stall on site.
Why this product line needs a fuller submittal than a stock item
The Open & Closed Combo Units sit inside our TV Cabinets and Media Units range alongside Santerson Integrated LED Media Units and Santerson Glass Front Media Units. What sets the combo units apart is the mix of open shelving with closed cabinetry in one run, which means the submittal has to settle two questions at once: what stays on display, and what gets hidden behind doors. Those decisions affect carcass construction, door fronts, hardware loads and how services are routed behind the unit.
Our product listings for these configurable units state that finish, layout and dimensions can be specified to suit each space, and they ask buyers to confirm the storage configuration for every project. We publish them that way on purpose. A submittal that carries confirmed values protects the contractor as much as it protects the factory, because change requests raised after production starts are the most expensive kind.
Section 1: Project identification and scope
Start with the boring part, done properly. A submittal that cannot be traced back to a drawing revision gets returned unread.
- Project name, location, and the consultant or main contractor who requested the unit.
- Drawing reference and revision number for every wall the unit appears on, plus the schedule entry it answers.
- The exact product line being submitted, here Open & Closed Combo Units, so reviewers do not confuse it with a freestanding alternative.
- A scope statement listing what is included in our supply and what stays with others: substrate preparation, structural fixing, electrical connections on site, and final finishes to adjoining walls.
- The date of the submittal and which earlier revision it replaces, if any.
Section 2: Dimensioned layouts for every unit
Send dimensioned elevations for each unit, not one representative detail. Two identical-looking living rooms often differ by a skirting return, a radiator recess or a ceiling shadow gap, and those differences change the elevation.
| Item to show | Why reviewers look for it |
|---|---|
| Overall width, height and depth per unit | Sets coordination with flooring, ceiling lines and adjacent joinery |
| Module breakdown | Shows where open bays end and closed cabinets begin |
| Shelf spacing and shelf adjustability | Determines what the owner can actually store later |
| TV niche clear opening, not just the outer frame | Confirms the screen size and mounting plate will fit |
| Reveal and shadow gaps at walls and ceiling | Avoids setting-out disputes with plasterers and tilers |
| Floor or plinth build-up | Ties the unit height to the finished floor level, not the slab |
| Fixing method and substrate note | Tells the site team what preparation the wall needs before installation |
For wall-mounted variants in the same range, such as Santerson Wall Mounted Media Walls, add the fixing detail and the load path. The site team needs to know what the wall must carry before they close it up.
Section 3: Storage configuration, bay by bay
This is the section most often left thin. Because the product combines open and closed storage, the submittal should list every bay and say what it does:
- Open display bays: dimensions, shelf depth, and whether the shelf is fixed or adjustable.
- Closed cabinets: door type, hinge side, drawer or shelf interior, and pull-out access if specified.
- Media bay: clear opening, ventilation provision, and how equipment is reached for servicing.
- Cable routing: where grommets or cut-outs sit, and which bays they belong to.
Where a project needs more closed storage than display, say so explicitly in the submittal and show the alternative split. If the wall system extends beyond the media unit into full-height storage, coordinate it with the matching Santerson Mixed Open & Closed Storage line so the door fronts and reveals read as one joinery package rather than two purchases.
Section 4: Materials, finishes and hardware schedule
List the finish for each visible surface by name and reference, with physical samples attached where the project requires them. Body panel, door front, shelf, edge treatment and any metal or glass element should each be identified separately, since a single colour name rarely covers all of them.
Our Custom & OEM Service covers bespoke finishes and textures alongside standard options, so the submittal is the right place to record non-standard choices. For anything outside our normal range, attach a sample reference and note which surfaces it applies to.
The hardware schedule should name hinges, drawer runners, handles or handleless profiles, and any door mechanism, with the quantity per unit. Hardware drives cost and it also drives whether doors hang true after a year of use, so reviewers want it itemised rather than described as "matching ironmongery".
Section 5: Integrated lighting and services
If the design includes lit display bays, the submittal must go beyond a note that lights are included. Record the light source type, where the fitting sits, how it is switched, where the driver or transformer is located, and how it will be accessed for replacement. Drivers fail more often than LEDs, and a driver buried behind a fixed panel becomes a maintenance problem on day one.
Where lit shelving extends into other joinery, coordinate with Santerson Integrated Cabinet Lighting so the same switching arrangement and the same accessory type run through the package. Confirm electrical ratings and compatibility for each cabinet design at submittal stage, not at first fix.
Section 6: Interfaces with other trades
A media unit touches more trades than most people expect. The submittal should show how it meets the floor, the ceiling, the wall returns and any fireplace, window reveal or door opening nearby. Where a skirting is discontinued at the unit, or a plaster shadow gap is intended, draw it.
Also record who supplies and installs the screen itself, who routes the low-voltage cabling, and who makes good after fixing. Those three questions cause most of the arguments on site, and answering them in writing costs nothing.
Section 7: Packaging, delivery and installation information
For imported joinery, buyers should see how units arrive and what happens next. Include packing details and container loading arrangement, the delivery sequence for multiple units across floors or villas, plus the site storage assumption, and the installation method with an inspection and snag list at handover. Our Logistics & Door-to-Door Delivery service covers freight arrangements and paperwork, while Installation & After-sales Support covers on-site fitting and post-handover support. Confirm the delivery address, access restrictions and receiving arrangements for each project so the units land where they can actually be unloaded.
Section 8: Approvals, sign-off and what stays open
Close the package with a short status sheet: which decisions are approved, which are still provisional, and who needs to confirm each one. A submittal that hides unresolved items gets approved on false assumptions; one that flags them gets approved faster.
- Items confirmed by the client or designer (finish, layout, dimensions).
- Items pending third-party input (structural approval for wall fixings, electrical sign-off).
- Long-lead items and which approvals release production.
How we work through the submittal stage
SANTERSON has operated since 2008 as a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects. Our workflow runs from consultation and design planning through production, logistics, installation and after-sales, which means the submittal is produced by the same team that will manufacture and deliver the unit. For Australian work we have delivered villa projects including references in Willoughby, Perth, North Turramurra, Melbourne and Sydney; project scope for each case is set out on its own page rather than assumed here.
Through Turnkey Interior Project Solutions, we coordinate built-in joinery alongside the rest of the fit-out, so a media wall submittal can be reviewed together with the cabinetry, doors and lighting that surround it instead of in isolation.
Before you submit: quick check
- Every unit has its own dimensioned elevation, tied to a drawing revision.
- Open and closed bays are listed individually with their interiors defined.
- TV clear opening, ventilation and service access are shown, not implied.
- Finishes are named per surface, with samples where required.
- Hardware is itemised by type and quantity.
- Lighting includes driver location and access.
- Trade interfaces and responsibilities are written down.
- Delivery sequence and installation method are stated.
- Open items are listed with a named owner.
Send us the drawing package for your media wall and we will return a submittal set covering layout, storage configuration, finishes, hardware and lighting for the Open & Closed Combo Units, with dimensions confirmed against your project. Details are on the product page, or speak to our team about One-stop Furniture and Building Materials Supplier coverage for your project.