A quotation for frosted glass wardrobes looks complete on paper: a set of dimensions, a price and a couple of renderings. The differences that matter in practice are usually buried in the small print, and they surface months later as sticking sliding doors, mismatched frame finishes or panels that arrived without the fixings your installer expected. This guide walks through the sections of a manufacturer's proposal worth checking line by line before you release production.

Start With What the Wardrobe Has to Do

Before reading a single number, check whether the proposal answers the brief. A wardrobe in a private bedroom, a guest-room fit-out in serviced apartments and a joinery package inside a villa project make different demands on door type, storage layout and how much wear the finish will take. If the document opens straight with pricing and never restates the room, the users or the access pattern, ask for that context to be written in.

Frosted glass is usually specified where you want light to pass through a door but not the contents behind it: a bedroom opening onto an en-suite, a corridor run, or a shared living space where a mirror or clear glass front would feel exposed. Our Frosted Glass Wardrobes sit in the glass door wardrobe collection and are made to measure, with layout, finish and dimensions set per project rather than chosen from a fixed size grid.

Read the Specification, Not Just the Rendering

A perspective drawing tells you what the designer intends. The specification tells you what will be manufactured. Compare them and note anything that appears in one but not the other.

Item in the proposalWhat to confirm in writing
Glass type and frost finishWhether the doors are frosted tempered glass, film-frosted or acid-etched, and which face carries the frost. Check whether the frost is full-surface or patterned, because a printed render can suggest a design that plain frosted glass will not deliver.
Frame systemWhether the doors are frameless glass, framed in aluminium or combined with a timber-front door. Aluminium-framed fronts behave differently from edge-polished glass in hardware choice, alignment tolerance and cleaning.
Door operationHinged, sliding or bi-fold, plus the track, runner and hinge make. Sliding runs need clearance for panel overlap; hinged runs need swing clearance checked against beds, vanities and corridor widths.
Body material and edge treatmentBoard type behind the doors, edge banding, and interior finish colour. Two proposals can look identical from the front and differ completely in the carcass.
Interior layoutHanging heights, shelf spans, drawer banks, mirror panels, integrated lighting. Confirm which of these sit inside the price and which are costed options.
Hardware and closing elementsHandles or profile pulls, soft-close fittings, dampers, locks for shared accommodation, and whether spare fittings travel with the shipment.
Ventilation and wall fixingWhether ventilation detail and the wall-fixing method are shown. Site conditions change both, so a proposal that ignores them pushes the question to installation day.

Check How the Dimensions Were Obtained

Made-to-measure joinery only works if the numbers came from the actual site. Ask who measured, when, and whether the figures are finished floor to finished ceiling or structural. A proposal drawn purely from architectural drawings carries risk where screed depths, ceiling build-ups or skirting details have not yet been settled.

A sound proposal states tolerances and says what happens if on-site dimensions move. For a wardrobe running against an uneven wall, the difference between a scribed solution and a packer-and-trim solution should be visible in the drawings, not decided by whoever turns up with a screwdriver.

Compare Like for Like Across Suppliers

The quickest way to misjudge price is to compare totals. Two quotations for the same 2.4 m wide wardrobe can differ because one includes carcass, interior fittings, delivery to the door and installation while the other covers panels only. Build a comparison sheet with identical rows for each supplier: glass specification, frame system, hardware brand, body material, delivery scope, installation responsibility and stated exclusions.

Where wardrobes are bought alongside other joinery from one source, price the package rather than the item. Kitchens, vanities, media walls and storage runs share materials, finishes and a single production and shipping cycle, which is why project buyers often group them with one furniture and building materials manufacturer instead of running several separate orders.

Test the Customisation Claim

Frosted glass fronts are normally part of a wider finish story: the same frame profile may need to reappear on a kitchen, a display cabinet and a set of doors. Ask for evidence that finishes can be held consistent across categories, and check what the custom service actually covers.

Questions worth putting in writing:

  • Can you supply sample door corners, or a prototype panel, before full production?
  • Which frame profiles, glass tints and frost finishes are standard, and which carry a minimum quantity?
  • Can hardware be swapped to the brand our designer specifies without repricing the whole run?
  • If one wardrobe in a set has to be remade after site verification, what is the process and how long does it take?

SANTERSON works from project drawings rather than catalogue sizes; the Frosted Glass Aluminum Frame Wardrobes in our glass and aluminium frame collection are built to project dimensions with material and finish selected per job. That is the model to look for: a supplier treating the wardrobe as one element of a fit-out instead of an isolated line item.

Trace the Delivery and Installation Chain

Glazed fronts and mirror panels are the items most likely to be damaged in transit, so the logistics section of a proposal is not administrative filler. Check whether packaging is described for glass fronts, how panels are crated, which party carries risk during sea or road freight, and how a chipped panel is replaced.

Ask the supplier to state in the proposal itself: packing method for glazed fronts, who arranges customs paperwork, whether delivery is kerbside or into the property, and what happens if a replacement panel has to be produced after the container has sailed.

Then settle the installation handover. Whoever adjusts sliding runners, aligns hinged doors and fixes the carcass to the wall should be named, along with how defects are logged after handover and who supplies replacement hardware later. A proposal that ends at "goods delivered" leaves these decisions to chance.

Warning Signs Worth Acting On

  • The price is firm but the glass specification is vague: "frosted glass, as shown", with no make-up or thickness stated.
  • Hardware is listed generically, with no brand or model, so a downgrade costs the supplier nothing.
  • Interior fittings are described as "standard layout", and that standard layout was never attached.
  • Measurements come from drawings only, with no site verification scheduled before production release.
  • Delivery terms stop at the port, with no named party for inland transport or placement inside the building.
  • No sample, prototype or finish board is offered before a full run is committed.

A Short Approval Sequence

Four gates keep most wardrobe orders honest. Approve the specification sheet and interior layout. Confirm site-measured dimensions and sign them off. Review a physical finish sample or prototype panel before production is released. Agree packing list, delivery scope and installation responsibility in writing.

A manufacturer who accepts those gates without friction is telling you how the rest of the order will run. Resistance at any gate is far cheaper to discover now than after the glass has been frosted and the panels have been crated.

Send us your drawings, room dimensions and finish references, and we will return a wardrobe specification with door type, frame profile, glass make-up and interior layout set out item by item, together with what is included for delivery and installation. Contact: PHILLIP, +86-13928214007 (phone/WhatsApp), santerson@qq.com.

Specifications, finishes, minimum quantities, lead times and service scope are confirmed project by project on request; the details referenced here follow the information published on our product and service pages.