A submittal is the document package a wardrobe supplier sends back to the architect, main contractor or buyer for review before production starts. For matte sliding door wardrobes, it is also where two quiet risks get settled in writing: the finish that will actually be produced, and the way a sliding door interacts with the wall, cornice and floor it has to travel across. Below is the package we ask for on residential villa and apartment work, and what each part needs to say so that review comes back with comments instead of questions.

1. Drawings at three levels

Our Matte Sliding Door Wardrobes line is made-to-measure, so a shop drawing set has to start from the room rather than from a catalogue size. We expect the submittal to carry:

  • Setting-out plan: wardrobe position against finished wall faces, with door opening direction, clearance in front of the sliding panel and any adjacent door swing or switch plate noted.
  • Elevation drawings: one elevation per face, showing panel widths, vertical joint positions, handle or profile-recess location, and how the top of the unit meets the ceiling or cornice.
  • Section details: a horizontal section through the track and a vertical section through the top rail, showing the built-up depth of door plus track, because a sliding panel consumes depth that a hinged door does not.

Where a run turns a corner or wraps a structural column, add a plan detail for that junction. Corner conditions are the most common reason a first submittal is returned: the panel size on the elevation and the travel space on the plan disagree with each other.

2. Finish schedule, written so it survives site lighting

Matte is the finish most often resubmitted, not because it is difficult to produce but because it is easy to describe imprecisely. A submittal should state:

  • The substrate and surface system for the door panel, carcass and interior, listed separately, because they are frequently different materials in one wardrobe.
  • The colour reference as a code from the supplier's own finish range, plus a physical sample. A screen proof is not enough for matte; sheen reads differently on a photograph than on a hand sample under warm site lighting.
  • Sheen expectation in plain words, and which direction light falls on the elevation. Matte surfaces show fingerprints and drag marks differently from matte lacquer wardrobes specified elsewhere in the same building, so reviewers compare them.
  • The edge treatment: whether panel edges are matched, wrapped or contrasted, since a visible edge line changes how a matte elevation reads.

Practical point: keep one approved finish sample per finish code on site. Colour and sheen disputes in wardrobe joinery are usually settled by holding the retained sample against the delivered panel, not by re-reading the specification.

3. Hardware and door system data

Sliding wardrobes fail on tolerances rather than on looks, so the submittal needs the door system described numerically:

Item to stateWhy reviewers ask for it
Track and hanger type, load rating per hangerSets the maximum panel size and weight the run can carry over its full height.
Panel overlap and reveal widthsDetermines whether contents are visible when the doors are closed.
Minimum and maximum panel width and heightFloors and stiffeners limit panel proportions; oversized panels sag over time.
Required floor level tolerance and threshold detailA bottom track on an unlevel slab binds. The submittal should say who levels the floor and to what tolerance.
Headroom for top rail and stopCornice, lighting cove or bulkhead heights often leave less than the rail needs.
Soft-close, handleless recess or pull profileHardware choice is fixed before panel edges are machined.

If the design uses mirrored or glass inserts in a matte door, include the glazing specification and the fixing method in this section too. If the run sits in a corner rather than along a straight wall, review it as sliding door corner wardrobes and show the access path to the dead corner.

4. Interior configuration and load assumptions

The inside of the wardrobe is where the client actually experiences the product, so it belongs in the submittal rather than in a later email:

  • Shelf, hanging rail and drawer layout with heights marked from finished floor level.
  • Span of each shelf and the material thickness supporting it; long, thin shelves deflect, and deflection is visible on a matte carcass.
  • Drawer run type and whether drawers are accessible with the sliding panel in its closed position; a drawer can be blocked by its own door if the layout is drawn without checking this.
  • Integrated lighting: fitting type, cable route, transformer location and how it will be accessed for maintenance.

5. Manufacture, delivery and installation record

For projects shipping internationally, the closing part of the submittal protects the site programme:

  • Confirmed dimensions after site verification, with a note stating who took each measurement.
  • Production lead time stated as a range, plus the date the approved submittal is assumed to be received.
  • Packaging and panel protection for transit, and the container or pallet arrangement for the wardrobe run.
  • Delivery sequence and access route, especially for full-height panels that must pass through lifts, stairwells or doorways.
  • Installation responsibility: who sets the unit plumb, who adjusts the hangers after fitting, and what handover document is issued at completion.

A short pre-submittal check

  • Does every elevation dimension match the setting-out plan?
  • Is each finish named by code and backed by a physical sample?
  • Are floor tolerance and headroom assigned to a named trade?
  • Can every drawer open with the doors closed?
  • Do panel sizes sit inside the stated limits of the sliding system?

Send us your drawings and finish references and we will return a submittal set for review, including shop drawings, a finish schedule with samples and the door-system data above. Enquiries: santerson.com/contact.