A paneled hinged wardrobe looks simple on a drawing: a row of doors, each with a frame and one or more inset panels. The problems start at handover, when the doors sit proud of the carcass, two panels do not read as one design language, or the run stops short of the ceiling because the room is not square. Asking the right questions before the order is placed is what separates a fitted joinery package from an expensive return job.

The Paneled Hinged Wardrobes page on our site describes a made-to-measure product, not a stock item you pick up in three widths. That distinction drives everything below: the questions are about how your dimensions, finishes and interior layout get confirmed and recorded before production starts.

1. Is this a made-to-measure order or a standard size?

For a fitted bedroom, wardrobe height is set by the floor-to-ceiling dimension of that room, and those numbers vary within one dwelling. Confirm whether the supplier is cutting carcasses to your drawings or offering a fixed grid of sizes. With made-to-measure work you should receive a dimensioned drawing back from the factory, not only the drawing you sent them, so both sides are working from the same document.

Ask for one written confirmation sheet per wardrobe run: overall height, width and depth; number of doors; door swing direction; panel style; finish code; and interior configuration. That sheet becomes the reference at inspection.

2. What exactly is the door construction?

"Paneled" covers several different builds, and they do not cost the same or age the same way. Before ordering, establish which of these you are buying:

  • A frame-and-panel door, where a profiled frame surrounds one or more loose or fixed panels.
  • A raised panel, where the panel is moulded so its centre sits proud of the frame.
  • A recessed panel, where the panel sits back from the face of the frame, giving stronger shadow lines.
  • A shaker-style door, a flat centre panel inside a square frame — the quietest of these profiles and the easiest to keep consistent across a long run.

If the project calls for a classic look, ask which collections the supplier actually produces. Our Raised Panel Wardrobes and Shaker Panel Wardrobe pages are separate product lines, and mixing them across one wall is a decision to make deliberately, not by accident.

3. What material is the panel actually made from?

The profile can look identical in two different substrates and perform very differently over ten years. Ask for the substrate and the surface treatment separately, in writing:

ElementWhat to confirmWhy it matters
Door coreSubstrate type and board thickness for both frame and panelThin panels in tall doors are the usual cause of visible bowing along the stile edge
SurfaceSolid timber, wood veneer, laminate, lacquer or acrylic, plus the finish codeFinish codes travel better than photographs; a photo on a phone screen will not match your paint schedule
CarcassBoard thickness and edge treatment on visible endsExposed edges at the return of an L-shaped run are where cheap build shows first
InteriorFinish of the inside faces and back panelsClothes rest against these surfaces every day

Where solid timber is specified, request the species. Our Classic Paneled Solid Wood Wardrobes and Walnut Solid Wood Wardrobes listings are named by material for a reason: species, cut and finish need to match the rest of the joinery package in the same dwelling, including doors and kitchen cabinetry.

Note on naming: collections such as "Classic Paneled" and "Solid Wood" are how these wardrobe lines are titled on our site. They are catalogue names, not a description of the substrate behind any given door profile — confirm the board material and surface treatment for your order separately.

4. How wide and how tall can a single door be?

Every manufacturer has a limit beyond which a hinged panel needs reinforcement, a different core or a wider hinge set. Ask for the maximum single-door width and height for the construction you have chosen, then design around it rather than hoping for an exception. Two practical consequences follow:

  • The number of doors in a run is decided by that limit, so door count changes with panel style — and so does the price.
  • A tall wardrobe may need a separate upper cabinet or a top panel rather than one continuous door, which changes how the ceiling line is detailed.

5. Will the doors clear the room?

Hinged doors swing. Before you commit, walk the layout with the door arc drawn on the floor plan: clearance from the bed, the opposite wall, a window handle, a radiator and any doorway that opens into the same corner. If the arc cannot be kept clear, ask about the alternatives in the same finish rather than changing the whole design — High Gloss Sliding Door Wardrobes and Hinged Door Corner Wardrobes are the usual answers for tight rooms and awkward corners.

6. What hardware, and who supplies it?

  • Hinge type and load rating, and whether soft-close is included or optional.
  • The number of hinges per door at the height you have specified — this should be stated on the drawing, not left to the fitter.
  • Handle or integrated pull choice, and whether fixings are supplied with the doors or sourced locally.
  • Whether replacement hinges and panels can be ordered later against the same specification.

7. What is inside the carcass?

The doors sell the wardrobe; the interior decides whether it works. Send a room-by-room storage brief — hanging lengths for long garments, drawer count, shelf heights for folded linen, space for a suitcase, provisions for an ironing board or a safe — and ask for that brief to be drawn into the shop drawings. Shelf-focused, drawer-focused and hanging-focused layouts are different products, not variations of one.

8. How are out-of-square walls handled?

Older buildings and refurbished villas rarely deliver parallel walls. Ask how the supplier deals with scribe panels, filler strips and a marked ceiling line, and who is responsible for setting out on site. A made-to-measure order that assumes perfect geometry will arrive as a set of rectangular boxes in a non-rectangular room.

9. How does this fit the rest of the project?

Wardrobe doors, interior doors and kitchen fronts are usually specified together and installed by different trades at different times. Ordering them from one manufacturer keeps species, veneer cut, grain direction and finish code consistent across the dwelling. That is where Custom Furniture Design and Prototyping earns its place in a programme: sample doors and finish boards are approved once, then applied to every run.

10. What is the sequence from order to handover?

For an overseas-supplied joinery package, confirm the stages and what you receive at each one: shop drawings for signature, a production slot, packing lists by room, freight booking, and who installs on site. Our Logistics and Door-to-Door Delivery and Installation and After-sales Support pages set out those stages; ask which of them are included in your quotation and which you arrange locally.

Ask specifically how a damaged or incorrect panel is handled after arrival, and how quickly a replacement can be produced to the same specification. Panels are re-made; whole wardrobes rarely are.

Before you sign

  • A dimensioned drawing for every wardrobe run, returned by the factory.
  • Panel style, substrate, species and finish code written on that drawing.
  • Maximum door width and height for the chosen construction, with the door count derived from it.
  • Hinge specification and quantity per door.
  • Interior layout confirmed against a storage brief.
  • Scribe and set-out responsibility named: factory or site.
  • Packing marked room by room, plus the replacement-panel route.

Send us the drawings

Share your floor plans, room dimensions and finish schedule, and we will return dimensioned wardrobe drawings with panel style, substrate and hardware specified for each run — coordinated with the doors and cabinetry in the same project through our Turnkey Interior Project Solutions.