A decorative interior door looks simple on a schedule: one leaf, one opening, one finish. In practice it is the element that joins three trades at once — joinery, wall finishing and ironmongery — which is why small project details decide whether it reads as a design feature or as a problem on site. The questions below are the ones our project team asks before Santerson Decorative Interior Doors go into production.
1. The opening, measured from the finished surface
Every door we make is made-to-measure, so the first detail is what "size" actually means on your drawings. Rough opening and finished opening are not the same number: floor build-up, wall plaster or cladding, and any framing behind the leaf all change the clear dimension. Send us the finished-floor level, the finished wall face, the width and height of the clear opening, and the wall thickness you intend the reveal to have once the door is hung.
Two details in this first round decide more than any other. The first is which way the leaf swings and where the hinges sit relative to the room's circulation — a decorative panel that clashes with a light switch, a radiator or a furniture layout stops working as often as it fails as a product. The second is whether the opening is a single leaf or a pair, because paired leaves need their meeting stile resolved before anything else is specified.
2. Flush to the wall, or expressed as a panel
The look you are after narrows the range quickly. If the goal is a door that disappears into the wall, with no visible architrave and a surface that continues the paint or panel of the surrounding wall, then concealed work is the right family — see Santerson Flush Interior Doors and, where the hardware should also be invisible, Santerson Handleless Concealed Doors. If the goal is a door that reads deliberately as part of the interior design — panelling, mouldings, veneer, a colour or texture pulled from the scheme — then a decorative leaf with an expressed edge is the better fit.
This choice has to be made before wall finishes go on, not after. A flush or concealed leaf needs its frame and fixing detail built into the wall build-up, so the decision belongs at the joinery and lining stage rather than at handover.
3. Material, finish and how the door has to age
Finish, layout and dimensions are all specified per project, and the material choice follows the room rather than the sample book. A private villa bedroom and a hotel corridor take very different treatment: in shared and high-traffic use, edge protection, a hard-wearing surface and a finish that can be cleaned repeatedly matter more than the depth of the grain. Where a door has to match cabinetry or wall panelling elsewhere in the project, send us the reference — veneer species, lacquer sheen, laminate or HPL code, paint colour standard — so the leaf is produced against the same reference instead of being matched by eye on site.
As part of our custom furniture and interior products manufacturer, we also produce doors as part of a wider set: wardrobes, wall panelling, media walls and cabinetry from the same batch and finish schedule. Ordering them together is often what keeps colour and grain consistent across a floor.
4. Hardware, ironmongery and clearances
Tell us what the leaf has to carry. Lock case and cylinder or privacy set; lever handles, pull plates or a concealed push mechanism; hinges that must be invisible when the door is closed; an automatic closer; acoustic or smoke seals; signage or room numbers for hospitality use. Each of these changes the pre-machining we do in the factory, and each has a position that should agree with your ironmongery schedule.
Thresholds and floor coverings belong in this conversation too. Carpet, stone, timber and vinyl all sit at different heights, and the undercut of a decorative leaf is set from the finished floor, not the subfloor. If the floor build-up is still open when doors are ordered, note it as an assumption on the order rather than leaving it to be solved on site.
5. Quantity, schedule and site conditions
A door list with one line per type is rarely enough for production. We need the schedule grouped by opening — type, size, swing, quantity, room or floor reference — so that identical leaves are made to identical details and nothing is re-cut on site. Where a project is delivered in phases, say which zones come first; phased release keeps the later batches matched to the same finish reference without holding the whole order.
Delivery and storage conditions affect the result as much as manufacture. Doors should reach a dry, heated or ventilated space that is out of sequence with wet trades, and they should be stored flat and on site long enough to settle before hanging. For projects we supply abroad, our furniture logistics and door-to-door delivery service covers freight booking, packaging and container loading, export paperwork and tracking, so doors arrive packed for the journey you are actually taking rather than a generic one.
What to send with your enquiry
| Detail | Why it matters |
|---|---|
| Finished opening size and wall thickness | Sets the leaf size, frame and reveal before anything is cut |
| Swing direction, hinge side, single or paired leaf | Determines machining and how the door works with the room layout |
| Flush/concealed or expressed decorative finish | Must be resolved before wall finishes are installed |
| Material and finish reference | Keeps doors matched to panelling, wardrobes and cabinetry |
| Ironmongery schedule | Locks, closers, seals and handles are machined in the factory |
| Quantity by type and delivery phasing | Groups production so identical leaves stay identical |
| Destination, access and storage conditions | Guides packaging, freight method and on-site handling |
Where this fits in a whole-project supply
Interior doors rarely fail as products; they fail as coordination problems, usually because the wall, the floor and the ironmongery schedule were settled without the door in the picture. Supplying them alongside the rest of the joinery removes that gap. Our one-stop furniture and building materials supplier service covers design consultation and space planning, material selection and product specification, manufacturing and quality control, project management and site coordination, then installation and handover — with doors, wall panelling, wardrobes, lighting, flooring and bathroom fixtures drawn from one specification rather than six suppliers.
If you are at the stage where door types still need to be chosen, send the drawings and the room list and we will come back with a proposal for each opening, including what has to be prepared in the wall before the leaves arrive.