A mirrored hinged wardrobe looks simple on a drawing: two or three reflective doors on hinges, a carcass, some internal fittings. That simplicity is exactly why it slips through approval with too few decisions recorded. When the doors arrive on site and the swing path clashes with the bed, the mirror reflects an unwanted view, or the door edges do not line up with the ceiling, the project team is left explaining choices nobody signed off. Below is the confirmation list we ask buyers, designers and contractors to close out before a Mirrored Hinged Wardrobe goes into production.
1. Door swing and the clearances it consumes
Hinged doors travel in an arc, so the room has to give up that arc permanently. Measure the finished floor level, then confirm three distances: from the door face to the nearest bed or nightstand, from the door face to any opposite wall or wardrobe bank, and from the top of the door to the ceiling or cornice. In bedrooms where the standing clearance is tight, we usually steer buyers toward Mirror Sliding Door Wardrobes instead, because sliding doors stay inside the carcass depth. Corner positions need the same treatment; a hinged door in a corner returns to Hinged Door Corner Wardrobes details, where the return panel and hinge side change the swing geometry.
- Hinge side and opening order for every door, marked on the layout drawing rather than decided on site.
- Handle or pull specification, since a projecting handle adds to the clearance an arc calculation can miss.
- Whether adjacent doors meet on a rebated or square meeting stile, which affects how close two doors can sit.
2. What the mirror actually reflects
Guests notice reflections before they notice joinery. Before approval, stand in the doorway and check what each door returns: the bed, an en-suite door, a corridor, a light fitting, or a service panel. This matters most in hotel rooms and serviced apartments, where the same layout repeats across many keys and one poor reflection becomes a repeated complaint. Where a full-length reflective face is not wanted, mirrored doors can be combined with plain panels in the same run, or limited to selected leaves.
3. Made-to-measure dimensions and what they depend on
Our wardrobes are made to measure: sizing, material, finish and internal layout are specified per project, and dimensions plus the selected specification have to be confirmed for each one before production starts. That confirmation is only as good as the site survey behind it. We ask for the survey after the floor finish, skirting, ceiling set-out and wall straightness are fixed, because a carcass built to a structural drawing will not sit correctly against a wall that has moved 10 mm out of plumb. Record these before sign-off:
- Finished floor level and finished ceiling level at each end of the run, not just an average.
- Position of skirting, architraves, switches, sockets and any thermostat that the carcass will pass.
- Whether the unit is built into a recess or boxed out, and who supplies the boxing.
- Access route and lift or stair dimensions for delivery of full-height panels.
4. Internal layout agreed with the end user, not the drawing alone
Mirror doors make an internal layout invisible until someone opens the wardrobe, which is why layouts get approved without being questioned. Hanging lengths, shelf heights and drawer zones should follow how the space will be used: a villa owner's long garments need different hanging heights than a hotel guest wardrobe stocked for short stays. Drawer units and pull-out fittings also need their own clearance in front of the opening, so an internal drawer that looks efficient on paper can bind once the doors are fitted.
5. Materials, finishes and mirror edge detail
Carcass board, door substrate and surface finish are all selectable, and the choices should match the room's use rather than only its appearance. For high-turnover rooms we favour surfaces that wipe clean and hardware rated for frequent operation. On the mirror itself, confirm the edge treatment - polished, bevelled or framed - and how the mirror is fixed to the door, because these decide both the look of the joint line and how the edge survives handling. Where a project mixes finishes across bedrooms, keep the finish code and sample reference in the approval record so later batches can be matched.
6. Interface with other trades
Built-in wardrobes sit at the meeting point of several trades, and approvals fail most often at those joints. Confirm in writing who sets out the recess, who supplies and fixes the boxing, who finishes the wall to the wardrobe face, and who carries load-bearing or ceiling-related work. Integrated lighting is a common addition: if lights are set into the carcass or mirrored doors, the electrician needs the cable routes and transformer positions before first fix, not after the panels go up.
7. Sample, drawing and sign-off sequence
We work from a project brief through design proposal, quotation and detail confirmation, then production, shipment and follow-up. For mirrored hinged wardrobes we recommend one extra step in that middle phase: an approval pack containing the elevation drawing with hinge sides marked, the finish sample reference, the mirror edge detail, and the surveyed dimensions. One signature on that pack prevents the three arguments that normally surface on site - wrong swing side, wrong reflection, dimension that does not fit.
Approval checklist before production
- Swing arcs checked against furniture and circulation; sliding alternative ruled out on purpose.
- Reflections from each door reviewed from the entry position.
- Surveyed dimensions taken after floor, ceiling and wall finishes are confirmed.
- Internal layout signed by the end user with drawer and pull-out clearances shown.
- Finish codes, mirror edge detail and fixing method recorded for future batches.
- Trade interfaces and integrated lighting routes agreed before first fix.
Wardrobe ranges are specified per project, so the details above should be confirmed against your own drawings and site conditions. Where a hinged door is required but the wall run turns, compare Paneled Hinged Wardrobes and Custom Minimalist Bedroom Wardrobe options for the same bedroom to keep door profiles consistent across the fit-out.
Send us your layout, surveyed dimensions and finish preference, and we will return made-to-measure wardrobe proposals with hinge set-out, mirror detail and internal layout drawn for approval - as part of our Turnkey Interior Project Solutions for villa, hospitality and office projects.