A quote for White Minimalist Cabinets is not a single number pulled from a price list. It is the result of measuring your room, fixing the layout, choosing a panel and finish, and deciding how far up the wall the units go. Send us those details and we can price the job properly the first time, instead of sending an estimate that has to be revised later.
What We Need Before We Can Price Your Cabinets
These cabinets are made to measure for each project, so the drawing and the specification drive the cost. The more complete your first enquiry, the closer our first quotation will be to the final order value.
1. Room dimensions and a simple sketch
A hand-drawn plan is enough to start. Please mark the wall lengths, room height, and the position of doors, windows, the sink, hob, oven, fridge and any existing pipework or sockets. Note ceiling heights at both ends if the floor or ceiling is out of level, and tell us whether skirting boards need to be removed.
2. Layout and run length
Tell us how you want to work in the kitchen: a straight run, an L-shape, or a U-shape with base units, wall units and a tall housing for an oven and pantry. If you already have a design from an architect or interior designer, send the drawings and we will price from them.
3. The look you want: flat slab or handleless
White minimalist kitchens usually come down to two decisions. The first is the door profile. A flat slab door gives the cleanest surface; a Minimalist Kitchen Cabinets collection piece sits closest to that look. The second is hardware: if you do not want visible handles, we build the fronts as handleless cabinets with a touch-to-open mechanism or a routed channel, so the surfaces stay continuous and flat.
4. Panel material and sheen
"White" covers several very different surfaces, and each one behaves differently in daily use:
- Matte white — soft, low-glare fronts that suit a quiet, understated kitchen. See White Matte Cabinets.
- High gloss white — reflective fronts that bounce light back into a small or dark kitchen. See White High Gloss Cabinets.
- Framed white with a recessed centre — a softer, more traditional take for period homes and classic interiors. See White Shaker Cabinets.
- Mixed materials — white fronts combined with a wood-tone island or open shelving, if you want the space to feel warmer.
5. Internal layout and fittings
The carcass is standard; the inside is where the money goes. Tell us what each unit has to hold: pull-out larder racks, corner carousel or pull-out corner units, deep pans drawers, cutlery trays, an integrated dishwasher front, a built-in coffee niche, or open display shelving. Soft-close hinges and drawer runners are specified on our cabinetry; for a rental or high-traffic family kitchen, tell us and we will confirm the heavier-duty fittings available.
6. Countertops, splashbacks and appliances
Confirm whether you want us to supply the worktop and splashback as well, and give us the appliance model numbers for the built-in oven, hob, dishwasher, fridge and extraction. Appliance dimensions set the housing sizes, so we need them before the drawings are finalised.
How the Quotation Is Built
Once we have the plan and the specification above, we return a working drawing for your approval together with an itemised quotation. The price is built up from linear metres of base and wall units, tall and specialty units, the selected door and carcass finish, internal fittings, worktop area, and any feature elements such as integrated lighting or open shelving.
| Item | What drives the price |
|---|---|
| Base and wall units | Total run length in metres, unit height and depth |
| Tall housings and pantry | Number of units, internal fittings, integrated appliance fronts |
| Door style and finish | Slab or framed, handleless detail, matte, gloss or laminate surface |
| Internal fittings | Pull-out systems, corner solutions, drawers versus hinged doors |
| Worktop and splashback | Material, thickness, cut-outs, edge detail |
| Packaging and freight | Container or consolidated shipment, destination port or site address |
For a whole-apartment or villa fit-out, we quote the kitchen together with wardrobes, vanity units, media walls and other built-in joinery as one package. Bundling the joinery usually keeps finishes consistent across rooms and simplifies shipping.
Single Kitchens and Multi-Unit Projects
The same process applies whether you are fitting one apartment kitchen or furnishing a whole building. For developers, builders and hotel fit-out teams, send the unit mix — how many kitchens of each type, and whether layouts repeat across floors. Repeated layouts let us fix a single approved prototype and produce the rest to that standard, which improves both price and consistency. Our turnkey project service covers design coordination, production, packing, shipping and on-site guidance for villa, hospitality and office work.
A note on what a low quotation usually leaves out: internal fittings, worktop cut-outs, plinths and scribes, spare panels, and freight to your site. Ask for these items listed separately so you can compare like with like between suppliers.
Sample Enquiry You Can Copy
Use this structure when you write to us:
- Project: apartment kitchen, renovation / new build
- City and delivery address; whether the site is in a block with lift access
- Room size: 3.6 m by 2.8 m, ceiling 2.7 m
- Layout: L-shape base run plus one tall housing; wall units above the hob only
- Fronts: white matte slab, handleless with touch-to-open
- Internal: four pan drawers, larder unit, corner pull-out, integrated dishwasher and oven
- Worktop: to be quoted, 20 mm profile, one sink and one hob cut-out
- Drawing attached: yes / no (we can work from a measured sketch)
- Quantity: 1 kitchen / 12 identical units / other
Frequently Asked Questions
Can you match an existing white cabinet colour?
Send a physical sample or the make and model of the existing fronts. Matching a sheen level matters as much as the hue, and we will confirm the closest available surface before production.
Do you ship to my country?
We pack and ship project cabinetry internationally, including customs paperwork. Tell us the destination city and whether delivery goes to a port or directly to site, and we will quote accordingly.
What if my walls are not straight?
Send photographs and note where the walls deviate. We design scribes and filler panels into the run so the cabinets sit flush on site rather than being adjusted by hand with a saw.
Email your measurements, sketch or drawings to santerson@qq.com, or reach us on WhatsApp at +86-13928214007 (PHILLIP). Include the room dimensions, layout, preferred finish and quantity, and we will come back with a drawing-based quotation for your custom minimalist kitchen cabinets.