A swim spa in this size band is usually bought as a package: shell, pumps, jets, filtration, lighting and controls delivered to a site that also needs power, drainage and access. The model number tells you very little on its own. What separates suppliers is how clearly each one answers questions about the configuration behind the number before a deposit is paid. This guide uses our Outdoor Swim Spa WS-S06M as a worked example and sets out what to ask any manufacturer you are shortlisting.
Start from the specification sheet, not the brochure photo
Every serious buyer receives a spec table. The test is whether that table can be read against your site drawings without a phone call to interpret it. For our Outdoor Swim Spa WS-S06M, the catalog specification reads as follows.
| Model | WS-S06M |
| Catalog dimensions | 5900 x 2200 x 1610 mm |
| Water pump | 2 pcs |
| Filter pump | 1 pc |
| Jet total | 48 pcs |
| LED lights | 17; 17 small LED lights |
| Total power | 6.95 kW |
| Control system | 1 set |
| Features shown | Water jets, LED lighting, Ozone, 4 water columns |
Two things in that table deserve attention when you compare quotes. First, the shell depth of 1610 mm is greater than on other units in the same length class, which changes how the spa sits on a deck or in a recessed pit and how entry steps are arranged. Second, total power is listed at 6.95 kW for this configuration; ask every shortlisted supplier to state the connected load of the exact build you are quoting, because options added later move that figure.
Check which systems are included and which are options
In this product family, catalog-listed options include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model. A supplier who quotes only the base unit and leaves you to discover the extras at production stage is not a supplier you want on a project with a fixed programme.
Ask for two documents in writing: an itemised bill of materials for the quoted configuration, and a list of what is excluded. Then have your electrician confirm the supply requirements for that build before you order. Put the same request to five suppliers and a stack of lookalike quotes becomes something you can actually compare.
Match the model variant to how the spa will be used
Model suffixes in this range are not decorative. They mark real differences in pump count, jet layout and installed systems. If lap swimming matters to you, that is a specific system and you should confirm it is present rather than assume it from the model code.
Compare three of our own units to see the point:
- Outdoor Swim Spa WS-S06M: 5900 x 2200 x 1610 mm, two water pumps, 48 jets, ozone and four water columns.
- Outdoor Swim Spa WS-S06: a shorter, shallower shell at 5820 x 2220 x 1110 mm, with a waterfall added to the feature list and a different jet count.
- Outdoor Swim Spa WS-S06CT: 5880 x 2380 x 1400 mm, with a swim training system listed as part of the specification.
A manufacturer worth shortlisting will walk you through these differences and tell you when a different model suits your site better. A manufacturer who only confirms what you already picked is selling, not specifying.
Test the supplier's production and configuration capability
Swim spas are rarely a catalogue-only purchase. Where the space is irregular, or where a project calls for a particular footprint, ask whether the shell shape can be adapted. We produce configurable outdoor swim and hydrotherapy units, including Customizable Shape Outdoor Spa - Personalized Hydrotherapy Pool in square, round, oval and curved layouts with an acrylic shell and structural reinforcement, for gardens, terraces and leisure areas.
For shortlisting purposes, ask each supplier three practical questions: can they show a comparable unit already in production; will they issue shop drawings for your configuration before manufacturing starts; and who signs off the interface between the spa and the site works. Vague answers to any of those three should move a supplier down the list.
Score the delivery chain, not just the product
A swim spa arrives as oversize freight and needs packaging, container loading, customs paperwork and a site that can receive it. Our services cover Furniture Logistics and Door-to-door Delivery, plus Furniture Installation and After-sales Support, alongside the manufacturing itself. That end-to-end scope is why project buyers consolidate furniture, fixtures and building materials with one supplier instead of managing a dozen separate contracts.
Ask each shortlisted manufacturer to name the delivery term they are quoting, who handles import formalities at your port, and what happens if a component is damaged in transit. Written answers here are worth more than any showroom photograph.
A shortlist checklist for this model class
- Specification sheet with dimensions, pump counts, jet count and total power for the exact configuration quoted.
- Written confirmation of which systems are included and which are optional extras.
- Confirmation of whether a swim training system is part of the build you are buying.
- Electrical supply requirements stated for that configuration, checked against the site supply by your electrician.
- Shop drawings issued before production begins, with your approval on record.
- Named delivery term, customs responsibility and spare-parts route in writing.
Talk to us about WS-S06M for your project
SANTERSON has been manufacturing furniture and building materials since 2008, with swim spas and hydrotherapy units supplied alongside the rest of the project package. Send us your site dimensions and intended use, and we will confirm the configuration, options and delivery scope in writing before production starts.