A pocket door looks simple on a drawing until the wall cavity, the hardware and the door leaf are quoted by three different suppliers. This guide sets out what to put in your procurement brief when the specified item is Santerson Glass Pocket Doors, so that quotations, shop drawings and site installation all work from the same information.

Why pocket doors need a more detailed brief than hinged doors

A hinged door is largely self-explanatory: an opening, a frame, a leaf. A pocket door is an assembly that disappears into the wall, and its performance depends on items that sit outside the door itself — the cavity it slides into, the track and hangers above the opening, the jamb detail, and the finish return where the leaf meets the wall face. When those elements are split across a framer, a hardware supplier and a joinery contractor, the door is the part that gets blamed for problems it did not cause.

Glass makes this worse in two ways. First, vision glass changes how the room reads: a pocket door between a study and a living area, or between a bedroom and an ensuite, can borrow light while still closing off noise and privacy when needed. Second, glass raises the stakes on accuracy — an oversized or badly aligned leaf cannot be trimmed or planed like a timber one. That is why our product pages for these doors state made-to-measure sizing, material and finish options, and layout tailored to the project, and ask buyers to confirm dimensions and selected specifications for each project rather than ordering from a standard size.

What the Santerson Glass Pocket Doors range actually covers

The product page describes made-to-measure glass pocket doors for residential projects, where finish, layout and dimensions are specified for each space. In other words, the item is not a fixed catalogue size with an optional veneer — it is a configurable opening that you define in the brief.

The Pocket Doors collection also includes Classic Pocket Doors and Santerson Wood Veneer Pocket Doors, specified in the same way. Where a project calls for sliding openings that read as part of the wall rather than as glass, Santerson Wooden Sliding Doors and Santerson Flush Sliding Doors sit in the adjacent sliding-door collections. The full range is listed under Windows and Doors.

The eight items to state in the brief

Write these into the specification sheet before you request a quotation. Anything left out at this stage becomes a variation later.

ItemWhat to record
Opening and leaf sizeFinished opening width and height, floor-to-floor height, clear opening required after the leaf is fitted, and which side the pocket sits on.
Wall build-upTotal wall thickness, stud line and head-room available for the track, and whether the cavity is new work or a retrofit into an existing wall.
Glass type and glazing specVision, reeded, frosted or smoked glass; the safety grade required for the location; and any pattern or interlayer detail called for by the interior design intent.
Frame and finishFrame colour or timber species, anodised or powder-coated metal, and the matching jamb and architrave treatment on both faces.
Hardware dutyTrack, hangers, floor guide, soft-close or pull-to-close, handle detail, and the leaf weight the hardware must carry once glazed.
Acoustic and privacy intentWhether the door is closing a bedroom, a study, a bathroom or a meeting space — this drives seal detail and glass choice.
Quantities by typeDoor schedule grouped by type code, not one line for "pocket doors", so each configuration has its own shop drawing.
Delivery and site sequenceProgramme dates, delivery address, container or pallet arrangement, and when the wall needs to be closed relative to door delivery.

A worked example of the wording that avoids rework

Weak brief: "Glazed pocket door to study, as per drawings." Strong brief: "Type PD-G1, single sliding glass pocket door between study and living area; finished opening 1020 mm x 2340 mm, floor-to-floor 2400 mm; reeded vision glass with matching slim frame; soft-close track with floor guide; jamb finished to match adjoining wall lining on both faces; pocket to the right-hand stud line; two-off; wall to remain open until door frames are on site." The second version can be drawn, quoted and installed without a phone call.

How made-to-measure doors move through a project

For projects where the doors are only one part of a wider package, it is worth placing them inside the same coordination process used for joinery, wall linings and fit-out. Our Custom & OEM Service covers custom furniture design and prototyping, bespoke material finishes and textures, and flexible minimum order quantities — which is how a door leaf, its frame and the matching cabinetry in the same room can be produced to one finish schedule instead of three.

The One-stop Solution process runs from design consultation and space planning through material selection and product specification, manufacturing and quality control, project management and site coordination, to final installation and handover. For doors this matters at two points: the specification is confirmed before the wall is closed, and the delivery sequence is planned so frames arrive while the opening is still accessible.

On the logistics side, Logistics & Door-to-Door Delivery covers freight forwarding by sea, air and rail, packaging and container loading, customs paperwork and shipment tracking. Because glass is a fragile consignment, the brief should state the delivery address, the storage conditions available on site, and who receives the delivery.

After installation, Installation & After-sales Support covers on-site installation support, inspection and snags, spare parts and ongoing maintenance. Sliding hardware is the item most often adjusted after handover, so keep the door schedule and type codes with your asset records.

Common specification mistakes we see corrected

  • Ordering to structural opening instead of finished opening. Wall linings, tiles and render consume millimetres. Specify the opening after finishes, and state the finish build-up on both faces.
  • Leaving head-room for the track unstated. The pocket needs space above the opening for the track and hangers; a retrofit wall with limited height above the frame is a different detail from new work.
  • Specifying glass without stating the location. Bathroom, bedroom and living-area openings carry different privacy expectations, and that is what drives the glazing choice.
  • Grouping all sliding doors under one line item. Glass, wood veneer and classic pocket doors are configured differently; each needs its own type code and shop drawing.
  • Not naming who supplies the floor guide and seals. Where those fall outside the door supply, record it in the brief so the site team knows what to expect in the box.

Note: dimensions, glass grades, hardware duty and finish options for these doors are project-specific. The figures above illustrate how to write a brief; they are not catalogue specifications. Confirm dimensions and selected specifications for each project before ordering.

Before you issue the enquiry

Send three things with your request: the door schedule by type code, the wall sections showing thickness and head-room, and the finish schedule that the doors must match. With those in hand, a made-to-measure specification can be priced and drawn against the same information the site team will build from.

Tell us the opening sizes, wall build-up and glass intent for each type code, and we will confirm the configuration, finishes and delivery sequence for your project. Enquiries are handled Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).