Outdoor Swim Spa WS-S12-T is one of the longer swim spa configurations in our outdoor swim and hydrotherapy range, and it is specified project by project rather than ordered off a shelf. A useful enquiry therefore does more than ask for a price: it tells us what you intend to do with the unit, where it will sit, and which equipment you expect in the finished build. The clearer that brief is, the faster we can return an accurate quotation instead of a rough estimate that has to be revised later.
Start With How the Spa Will Be Used
Before any specification discussion, tell us who will use the spa and how often. Daily lap swimming for one household, occasional hydrotherapy for older family members, and guest use at a villa or resort put very different demands on the build. Usage frequency decides the filtration duty you should plan for, whether insulation and a heat pump belong in the package, and how much attention the control and water-treatment side deserves.
For hospitality and rental settings, add the practical details: expected guest numbers, whether the spa is indoors or outdoors, opening hours, and who performs routine maintenance on site. A resort pool deck in a warm climate and a private garden in a cooler region are planned differently, and we need that context before recommending equipment.
Confirm the Configuration Against Published Specifications
WS-S12-T is catalogued at 11740 × 2200 × 1470 mm, with a control system, a swim training system, two water pumps, one filter pump, 73 jets in total, LED lighting and ozone treatment. Total power is listed at 7.65 kW. Treat these figures as the starting point for your enquiry rather than the final specification: optional items such as UV sterilisation, sand filtration, a heat pump, additional insulation and access steps are quoted separately, and availability varies with the configuration you choose.
| Catalogue dimensions | 11740 × 2200 × 1470 mm |
| Swim training system | 1 set |
| Pumps | 2 water pumps, 1 filter pump |
| Jets | 73 in total |
| Treatment and lighting | Ozone; LED lighting plus small LED lights |
| Total power (catalogue) | 7.65 kW — confirm for your selected configuration |
| Optional items | UV sterilisation, heat pump, sand filtration, insulation, steps, extra control equipment |
Please ask us to confirm the included equipment list and the electrical requirements for your chosen configuration in writing before production starts. Pump count, power load and treatment options all change with the selected accessories, and those changes affect both the quotation and the site preparation your contractor has to allow for.
Send Us the Site Conditions Early
A swim spa of this length needs a prepared base, access for delivery, and a power supply that matches the finished load. Include the following in your enquiry so we can flag problems at the quotation stage:
- The planned location — garden terrace, poolside deck, rooftop, indoor plant room or resort podium — with photos and any available drawings.
- Local supply details: voltage, phase and frequency, plus whether a dedicated circuit and isolation are already planned.
- Ground conditions and the intended support structure, including drainage around the shell.
- Delivery access: road width, gate or doorway dimensions, crane or lifting requirements, and distance from the truck to the final position.
- Climate notes for your region, since insulation and heating choices depend on winter conditions.
Tell Us Whether You Need a Standard Model or a Custom Build
Where a rectangular shell of this size does not suit the site, we also build spas to a customised shape — square, round, oval or curved — with an acrylic shell and structural reinforcement for gardens, terraces and leisure areas. That route follows our Custom & OEM Service, which covers bespoke design, prototyping, material and finish selection and project-specific dimensions. If you are furnishing a wider development, the same team can coordinate swim spas alongside outdoor furniture and other finishes through our One-stop Solution, so one supplier handles the package instead of several.
What Happens After You Send the Enquiry
Our cooperation steps are straightforward. First we review your brief and confirm the intended use, then we agree the equipment list and issue a quotation with the details written out; only after you approve that specification does production begin, followed by shipment and follow-up. For international buyers we arrange freight forwarding by sea, air or rail, prepare the shipping paperwork and deliver door to door, and installation and after-sales support are arranged for the project. Import terms, duties and transit arrangements are confirmed case by case for your destination.
A Quick Checklist for Your Enquiry
- Model reference: Outdoor Swim Spa WS-S12-T, or the shape you need if going custom.
- Intended use and expected user numbers.
- Location, photos, drawings and site access details.
- Local electrical supply data.
- Optional equipment you want quoted: heat pump, UV sterilisation, sand filtration, insulation, steps.
- Delivery destination and preferred Incoterms.
- Target programme date, so production scheduling can be planned around it.
Request a Quotation for WS-S12-T
Send your site details and intended use to our team and we will confirm the equipment list, electrical requirements and delivered price for your configuration. Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or use the Contact Us page. Enquiries are answered within 24 hours during business hours, Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).