A classic wooden hinged wardrobe looks simple on a drawing: panelled doors, timber tones, a run of carcasses fitted into a bedroom wall. The difficulties appear later — a door that sits out of line after delivery, a finish that does not match the joinery next to it, a corner unit that arrives in the wrong sequence. Those problems are almost never caused by the design; they are caused by a supplier who could not hold the specification through measurement, production and shipping. The checks below show how a buyer or project manager can judge that capability before placing an order.

Start With What You Actually Need to Be Made

Before you ask any supplier a question, fix your own requirement in writing. For a classic wooden hinged wardrobe, that means the door construction (framed and panelled, or a flat panel with a moulded profile), the timber or engineered substrate behind the finish, the finish itself, the interior layout, and how the unit meets the floor, ceiling and adjacent wall.

Write down which parts of that requirement are fixed and which can move. A hotel refurbishment may insist on the door profile because it repeats across every guest room, while interior fittings can vary by room type. A private villa may care more about a matched veneer sequence than about hardware brand. Suppliers answer differently when they know what you will not trade away.

Test Whether the Supplier Makes to Measure or Only Sells Modules

Ask directly: if my bedroom opening is a few centimetres shorter than your standard height, does anything in your price or lead time change? A made-to-measure manufacturer changes one dimension and re-cuts. A module trader either refuses or quotes you a filler panel that spoils the proportion.

SANTERSON describes its wardrobe work as project-specific: sizing is made to measure, material and finish are selectable, and the layout is drawn for the space rather than taken from a standard range. That is the model you want for built-in joinery, because bedroom openings in real buildings rarely match each other — especially in refurbishment, where floor levels and wall alignment shift from room to room.

Ask for one non-standard size in your enquiry. The way a supplier handles an awkward dimension tells you more than any brochure.

Check the Details That Give a Classic Wardrobe Its Character

Classic styling lives in small, repeatable details. Put each of these to the supplier and ask what they produce as standard:

  • Door construction. Framed door with a raised or recessed panel, or a shaker-style frame? Ask for a cross-section sample, not just a photograph.
  • Panel-to-rail alignment. How the panel sits in the frame, and whether the joint is allowed to move with seasonal humidity change.
  • Finish build-up. Sprayed lacquer, foil or laminated surface; how many coats; how edges are closed on a moulded profile.
  • Veneer matching. If you want a wood figure, ask whether leaves are sequenced across doors in the same run, and who signs off the match.
  • Hinges and clearance. Hinge type, opening angle, and the gap needed between the door and a skirting board or handle.
  • Carcass and scribe. How an out-of-plumb wall is handled — an adjustable scribe panel, or packing on site.

A supplier who can answer these with production detail is running a workshop. A supplier who answers with catalogue codes is reselling.

Ask How the Specification Survives Production

Custom joinery fails at handover points: drawing to sample, sample to first production batch, first batch to the rest of the order. Ask for the sequence in writing.

SANTERSON's stated cooperation steps run from project brief and design proposal, through quotation and detail confirmation, to production, shipment and follow-up. That structure only helps if there are hold points inside it. Useful questions:

  • Is a physical door sample or finish board approved and signed before the full run starts?
  • Are shop drawings issued for your signature with opening heights, door widths, and hinge positions dimensioned?
  • Who inspects at the end of production, and what is rejected — colour deviation, panel alignment, edge chipping?
  • If you order wardrobes for several unit types in one project, is a first unit produced for approval before the remainder?

For multi-unit work, also confirm that the same supplier makes the classic panel hinged doors in the same rooms. One maker for wardrobe and room door means one finish reference, one hardware schedule and one party responsible when tones do not match.

Judge Their Ability to Coordinate the Rest of the Fit-Out

Wardrobes rarely stand alone. They meet flooring at the threshold, wall panelling at the reveal, and often an integrated built-in furniture package that includes vanity units, shelving and media walls. When one company produces several of those elements, you get a single drawing set, a single shipment schedule and a single responsibility for interface details.

This matters most on villa and hospitality projects where the same timber tone appears on wardrobes, doors, panelling and cabinetry. It is worth asking whether the supplier also handles adjacent scope — flooring, wall finishes, interior doors, sanitary ware — or whether you will be managing three factories who each blame the other for a mismatch.

Verify Logistics, Packing and Site Readiness

Built-in joinery is unforgiving in transit. A chipped door edge on a moulded profile cannot be touched up to an invisible finish on site.

  • Ask how wardrobes are packed: vertical or flat, edge protection on profiles, separate cartons for doors and carcasses.
  • Ask for the packing list format. You need crate marks tied to room numbers, not one mixed container per floor.
  • Confirm who prepares customs paperwork and what documents you receive.
  • Agree delivery sequencing before production starts, so bedrooms are fitted in the order the site can actually work in.

SANTERSON states that freight forwarding by sea, air and rail, customs documentation, packaging and container loading, tracking and door-to-door delivery are part of its service. Treat those as commitments to be written into your order terms: Incoterms, shipment split, insurance responsibility and the delivery address for each phase.

Fix the Installation and Snagging Arrangement Before Order

Ask who fits the wardrobes. Options differ widely between suppliers: an installation team from the factory, a supervised local crew, or drawings sent to your own joiner. Each has a different cost and risk profile.

  • Who is on site when the first unit goes in, and who signs it off as the reference unit?
  • What tolerance is allowed on door alignment, and against what standard is it judged?
  • How are snags recorded after fitting, and who supplies replacement doors or panels?
  • What happens if a site opening moves out of square between survey and installation?

The last question is the one that separates experienced manufacturers from order-takers. A supplier who has fitted joinery abroad will already have a survey form, a tolerance sheet and a re-order route for damaged panels.

A Scoring Sheet for Your Enquiry

CheckWeak answerAnswer you want
SizingStandard widths only, filler panels usedMade-to-measure from your survey; shop drawings issued for signature
Door detailCatalogue photoCross-section sample plus approved finish board before production
Finish consistency"Close to the picture"Named finish reference, signed sample, batch check at end of production
Interface with doors and panellingSeparate suppliers coordinate it themselvesOne maker for wardrobe, room door and panelling; one drawing set
Packing and deliveryMixed container, generic listRoom-by-room crate marks, protected profiles, sequenced deliveries
InstallationDrawings emailed to your joinerReference unit signed off first, snag list, replacement route agreed

Documents Worth Asking For

  • A wardrobe detail from a completed project: shop drawing, approved sample photo, and the installed photograph.
  • Their standard survey form for bedroom openings, showing how they record out-of-plumb walls and floor levels.
  • A specification sheet listing substrates, finish systems and hardware options with what is standard and what is extra.
  • A packing list template and a sample shipping schedule for a multi-unit order.

A supplier that can produce these four items in a week has done this work before. One that cannot will still make attractive wardrobes — you will simply be doing the coordination yourself, on site, at your cost.

Send your opening dimensions and finish reference first. A supplier's response to a real dimension — not a showroom size — is the fastest honest test of whether they can deliver classic wooden hinged wardrobes for your project, from drawing through installation.