A wardrobe quote is rarely one number. It is a set of decisions about size, material, door type and interior layout, each priced separately. Read the quotation line by line before you sign it, because most disputes over custom built-in wardrobes begin with something that was assumed rather than written down. This guide walks through what to check in a supplier quote for a shaker panel wardrobe, using the classic paneled style as a practical example.
1. Scope and dimensions come first
Before comparing prices, confirm that every quote describes the same job. A shaker panel wardrobe is made to measure, so its overall width, height and depth should appear on a drawing, not only in a text description. Check these points:
- Overall external dimensions against your finished wall dimensions — floor level, ceiling level, skirting, cornice, doors and architraves all change what fits.
- Whether the quoted size is the carcass size or the finished front elevation, including scribes, filler panels and any light gap at the top.
- How out-of-square walls are handled. A quote that assumes a square room needs a site measure before production, and that step should be named in the quotation.
- Whether on-site installation is included, or whether the price covers factory-built units only.
A useful test: ask the supplier for a dimensioned elevation drawing with the quote. If they cannot produce one, the figure you are comparing is not yet a firm offer.
2. Materials and finish — read what is actually specified
Panelled doors look similar in photographs and differ considerably on a specification sheet. For a shaker-style door, the visible differences are the substrate, the finish system and how the edges are treated.
| Item | What the quote should state |
|---|---|
| Door panel construction | Substrate and thickness, and whether the profile is a routed shaker profile or an applied frame |
| Finish system | Paint, lacquer, laminate, veneer or foil, including sheen level and a colour reference from a recognised standard |
| Carcass board | Board type, thickness, edge banding material and matching colour |
| Back panel | Thickness and fixing method, which affects rigidity on tall runs |
| Interior surfaces | Whether shelf and side surfaces are finished to the same standard as the exterior |
Where a project needs one look across several rooms, ask whether the same finish is available on matching pieces. The classic paneled family also carries raised panel wardrobes and recessed panel wardrobes, so a bedroom, hallway and dressing room can share one door language.
3. Hardware is where quotes hide differences
Two quotes at the same price can carry very different ironmongery. Ask for brands and model references on hinges, slides, handles and any internal mechanisms, and check whether these are optional upgrades or part of the base price.
- Hinges: soft-close or standard, cup diameter, and the door weight they are rated for
- Drawer slides: load rating, extension length, soft-close or push-open
- Sliding systems, if used: track type, wheel rating and maximum door size
- Interior fittings: which items are standard and which are priced per unit
- Lighting: profiles, drivers, and whether wiring is quoted separately by an electrician
Hardware also drives serviceability. A quote listing generic "premium hinges" gives you nothing to check when a part needs replacing years later.
4. Interior layout should reflect how the wardrobe is used
Panelled doors are the visible part; the internal plan decides whether the wardrobe works. Confirm that the quote includes an internal elevation showing hanging zones, shelf heights, drawers and any special storage. If it does not, request one before production.
Where a project needs a different arrangement — deeper hanging for long garments, more drawer storage, or open display sections — say so at quotation stage, because layout changes affect both panel counts and hardware quantities. Related configurations such as combination modular wardrobes and boutique style walk in wardrobes can be quoted alongside the bedroom run so that heights and finishes carry across rooms.
5. Commercial terms worth pinning down
Once the technical content matches, compare the paperwork around it:
| Term | Question to ask |
|---|---|
| Pricing basis | Is the price per linear metre or per itemised unit, and what is excluded? |
| Revisions | How many drawing revisions are included, and when does the design freeze? |
| Production lead time | When does the clock start — after deposit, after sign-off, or after site measure? |
| Delivery and packing | Delivered to site or to port, who unloads, and how are panels protected? |
| Snags and warranty | What is covered, for how long, and what is the process for replacements? |
| Payment schedule | Deposit, progress payment and balance terms tied to defined milestones |
6. Cross-project consistency for builders and developers
If you are ordering wardrobes across several dwellings or a hospitality fit-out, the quote should show how repeatability is controlled: fixed colour and material references, one approved sample per finish, and identical hardware across units. Deviations in sheen or panel profile between batches are far easier to prevent at quotation stage than to correct on site.
As a furniture and building materials manufacturer working on villa and hospitality projects, SANTERSON quotes built-in joinery together with the flooring, doors, wall panelling and loose furniture that sit beside it. A single package removes the most common coordination problem: three suppliers each assuming someone else fixed the reveal, the threshold and the paint line.
Before you sign: a complete shaker panel wardrobe quote should include a dimensioned elevation, an internal layout, written material and finish references with colour codes, itemised hardware with brand names, clearly stated exclusions, and a lead time measured from a defined start point. If any of those are missing, ask for them in writing and re-quote.
Ready to price your wardrobe package?
Send us your floor plan, elevations and finish preferences, and we will return a specification-level quotation covering the shaker panel wardrobe run together with the joinery and furnishings around it. We work with project buyers, builders and designers on made-to-measure wardrobes, cabinetry and interior fit-out, including custom sizing, finish selection and delivery to site.
Contact PHILLIP by phone or WhatsApp on +86-13928214007, or email santerson@qq.com, to start a quotation.