A wardrobe quotation is easy to compare on one number and hard to compare on everything else. This guide walks procurement buyers, builders and interior consultants through the specific questions that make a proposal for wood grain melamine wardrobes comparable, buildable and sign-off ready.

Why Wood Grain Melamine Wardrobes Are Quoted Differently From Off-the-Shelf Units

Melamine-faced built-in wardrobes are almost always made to measure. Panel sizes, door layout and internal configuration follow the room rather than a standard catalogue module, so two proposals for what looks like the same bedroom joinery can differ in panel thickness, edge treatment, hardware grade, and how much of the site condition is assumed rather than confirmed. The price gap between them is rarely just margin.

That is why we recommend reading a proposal as a specification document first and a commercial offer second. Wood Grain Melamine Wardrobes in our range are specified per project — sizing, finish and layout are set from your drawings — so the quotation we return is meant to be checked line by line, not skimmed for a total.

Six Sections to Check Before You Compare Prices

1. Scope of supply and what is excluded

  • Are the wardrobes quoted as panels and components, or as a complete assembled unit?
  • Do scribes, filler panels, cornices and toe kicks appear as separate line items?
  • Is on-site installation included, priced separately, or simply not mentioned?

An omission in this section is the most common cause of a mid-project variation. Ask for exclusions to be written out; silence is not inclusion.

2. Substrate, panel thickness and surface

Ask which board the door, carcass and back panels are made from, and what thickness each one is. A wood grain decorative surface can sit on different substrates with very different behaviour in humid rooms and over long unsupported spans. Where a proposal simply says "melamine", request the substrate name and thickness per component.

3. Edge banding

Edge treatment decides how the wardrobe reads at close range and how well the edges resist moisture and chipping in service. Confirm whether all four edges are banded or only the visible ones, whether the edge matches or contrasts with the face, and what radius is used. This detail separates a joinery-grade result from a flat-pack look once doors are open.

4. Hardware schedule

Hinges, slides, handles and any integrated lighting should be listed with brand or grade and quantity, not bundled into "fittings included". Note the door type for each run — hinged, sliding or open — because clearance requirements change the setting-out and can shift the cost more than the finish choice does.

5. Internal configuration

Shelf depths, hanging heights, drawer counts and any dedicated zones should be drawn, not described in prose. If your brief calls for a mixed open and closed layout, check that the proposal shows which bays are open shelving and which are enclosed; open display sections and closed storage carry different panel and hardware loads.

6. Tolerances, site condition and who measures

Ask explicitly how out-of-square walls, floor levels and skirting are handled, and whether the opening dimensions come from your drawings or from a field measurement on our side. A made-to-measure wardrobe is only as accurate as the dimension source agreed in writing.

Reading the Wood Grain Specification Properly

Wood grain is a decorative finish, not a single product. The pattern, sheen and surface texture change how the same layout performs in a room. When we prepare a proposal, we ask buyers to settle three points so that comparable quotes really are comparable:

  • Sheen. A Matte Finish Melamine Wardrobe hides fingerprints and reads soft under warm lighting; a Glossy Finish Melamine Wardrobe reflects light and makes a shallow bedroom feel brighter, at the cost of showing marks between cleans.
  • Texture. A Textured Melamine Wardrobe carries grain relief that suits hand-touch surfaces such as door fronts and drawer fronts; a smooth face is easier to wipe down in a shared or high-use room.
  • Grain direction and scale. Wide-plank grains with visible figure need the direction stated on the elevation drawing, otherwise doors in the same run can be delivered with mismatched grain flow.

Sample-based decisions beat screen-based ones. Request a physical sample of the exact decorative surface quoted before you sign off the finish, and keep that sample for the site inspection at handover.

Comparing Proposals on a Like-for-Like Basis

Once each supplier has answered the six sections above, build one comparison table with identical rows: substrate and thickness, edge banding, hardware schedule, internal layout, tolerance method, installation responsibility, packaging and delivery terms. Only then is the price difference meaningful.

Expect the totals to move apart where responsibility shifts rather than where quality does. A lower figure that leaves scribes, edging or installation unpriced is not cheaper; it is incomplete. Where a supplier declines to break an item out, treat that line as an open risk and price your own contingency against it.

What a Turnkey Manufacturer Should Put in Writing

For multi-unit residential work and villa projects, the wardrobe package is one part of a wider fit-out alongside cabinetry, wall panelling, doors and lighting. Coordinating those items with one manufacturer reduces interface risk: one drawing set, one finish schedule, one production queue, one delivery window.

SANTERSON has operated since 2008 as a China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects. For wardrobe packages our workflow follows the stages set out on our service pages: project brief and design proposal, quotation with detail confirmation, then production, shipment and follow-up. Our Custom & OEM service covers bespoke finishes and layouts, and we arrange freight and door-to-door delivery through our logistics service, with installation and after-sales support coordinated separately where the project requires it.

Send us your room dimensions or drawing set, the door type you want for each run, and the finish you are specifying. We will return a proposal written to be compared — components, thicknesses, hardware and exclusions itemised — so that when you place the order there is nothing left to interpret.

Send your wardrobe drawings for an itemised proposal. Include opening dimensions, door type per run, and the wood grain finish you are considering. Contact SANTERSON through our contact page, or browse the full product range to see how melamine wardrobe finishes sit alongside our cabinetry and interior fixtures.