A floating TV unit looks simple on a drawing. It is a shallow box fixed to a wall, and most buyers assume the price follows from a few measurements. In practice, that is where quotation errors start. Wall fixing method, what sits behind the plasterboard, how cables are routed, which finish wraps which edge and how the unit travels to site all change what a factory can honestly price. Below is the information list we work from when a buyer sends an enquiry about floating TV units, so the number you receive matches what gets built and delivered.

Start With the Wall, Not the Cabinet

A wall-hung unit carries its own weight plus media equipment, consoles and shelving loads, all of it transferred into the substrate. Send us the wall construction: timber or metal studs with plasterboard, solid masonry, blockwork, or a framed stud wall with a cavity. If you know the stud positions and their vertical spacing, include them; that decides whether a hidden batten can be fixed through the studs or whether the unit needs a spread plate across the frame.

Where the substrate is unknown on site, say so in the enquiry rather than guessing. We will propose a fixing detail and your contractor can confirm it before production starts. Tell us the finished floor-to-underside dimension you want, plus the clearance behind the unit if cables or a raceway are to run there.

Give Dimensions in the Finished Condition

Every floating TV unit we build is made to measure, so a rough length is not enough. For a usable quotation we need:

  • Overall width, height and depth, stated as finished external dimensions, with the wall finish thickness already accounted for.
  • The internal break-down you want: open niches, closed compartments, drawers, and where each of them sits along the run.
  • Whether the unit is a single box or a composition of sections with a shadow gap between them, and the width of that gap.
  • Any return into an adjacent wall, a column to clear, or a skirting to cut around.

A sketch with notes is worth more than a clean drawing without them. Mark which faces are visible in the room, because a face that never shows can be finished differently from one in direct view, and that affects cost.

Name the Screen, Not Just "TV"

The screen sets the load and the cable schedule. Provide the model or at least the screen size, weight, and the mounting pattern if a fixed bracket will be used. Tell us whether the screen sits on top of the unit, hangs on the wall above it, or is recessed into an opening in the carcass. If the screen sits inside a panel opening, give the required opening width and height so the surround proportions stay balanced.

Specify the Finish System and Where It Wraps

SANTERSON is a one-stop furniture and building materials supplier, so a floating unit rarely arrives as an isolated item; it usually shares its finish with the wall panels, joinery and doors around it. To keep that match exact, tell us:

  • The door and carcass material you want, and the colour or grain reference. Send the supplier code if you already have one from another project.
  • Edge treatment: whether edges are wrapped in the same material, edged in a contrasting tone, or mitred at corners.
  • Handle detail: handleless routed edge, integrated pull, push-open hardware, or visible handles.
  • Whether internal surfaces match the exterior or take a standard neutral lining.

If you are matching an existing installation, name the project and the finish reference rather than describing it in words. Grain direction on wood-look surfaces is worth confirming at quotation stage, because changing it after cutting is not recoverable.

Set Out Cables, Sockets and Lighting Early

Cable provision is the most common revision we see after a unit is in production. For each compartment, tell us which sockets need to sit inside it and where they should be positioned on the back panel. Cut-outs for power, data, aerial and HDMI runs can be machined at the factory; you only avoid that work if the positions are fixed when the order is placed.

If the design includes lit niches or a lit shelf, as in integrated LED media units, state where the driver will be housed and who supplies the low-voltage supply. Lighting specification, driver location and switching need to be settled before the carcass is drilled, and they also affect how the item ships.

Say How It Reaches the Room

Freight changes the build. Tell us the delivery address, the access route to the room (lift dimensions, stair width, turning corners), and whether you want the unit delivered as one assembled box or in sections joined on site. Large one-piece units sometimes will not pass a stairwell or lift; splitting into sections with a field joint is often the practical answer, and it is cheaper to design that joint than to discover the problem at handover.

For projects outside China, include your preferred delivery terms and destination port or site. We handle freight forwarding, export paperwork and door-to-door delivery, so one enquiry can cover both production and transport. If you have a nominated freight agent, name them in the request.

What a Complete Enquiry Looks Like

ItemWhat to send
Wall build-upSubstrate type, stud or frame spacing, known cavity depth
DimensionsFinished width, height, depth; internal layout; joints and gaps
Screen dataModel or size, weight, mounting method, required opening
FinishMaterial, colour or grain code, edge treatment, handle type
ServicesSocket and cut-out positions, lighting and driver location
DeliveryAddress, access limits, assembled or flat-packed, delivery terms
ProgrammeRequired site date, approval milestones, order quantity

Quantity matters. One unit for a single apartment and a repeat of the same design across twelve rooms are quoted differently: hardware, spare panels, packing and container loading all scale differently. State the quantity even when it is one.

What We Send Back

With the information above we return an itemised price for materials, finish, hardware and packing, plus a production and shipping estimate against your required site date. Where something in your drawings is unclear (an ambiguous wall section, a finish reference that no longer matches a sample, a socket schedule that conflicts with the internal layout), we flag it at quotation stage instead of absorbing a change order later.

Send drawings as PDF or DWG with dimensions visible on screen, and photographs of the actual wall if the unit replaces an existing installation. For villa and apartment fit-outs where the media wall sits alongside wardrobes, shelving and doors, send the whole joinery schedule; pricing matching finishes together normally reduces both cost and site variation.

A Short Checklist Before You Send

  • Wall construction and fixing method confirmed, or flagged as unknown.
  • Finished external dimensions, not rough openings.
  • Screen weight and mounting method stated.
  • Finish references given by code, with edge treatment specified.
  • Cut-out and lighting positions marked on a drawing.
  • Delivery address, access constraints and quantity included.

A request for quote that covers these points comes back as a firm number rather than an estimate with caveats. If you are specifying floating TV cabinets for a villa or apartment project, send the schedule and drawings to us and we will price them against your programme.