A swim spa enquiry is rarely one decision. It is a package of shell size, water equipment, power supply, site access and delivery terms that all have to line up before a price means anything. The more of those variables you can put in writing before the first conversation with a one-stop furniture and building materials supplier, the fewer rounds of revision you will need, and the more accurate the quotation will be from the start. Here is what to gather before you contact us about Outdoor Swim Spa WS-PC05ST-S.

1. The exact model and its catalogue baseline

Start with the model reference, not a photograph. Outdoor Swim Spa WS-PC05ST-S is one variant in our configurable outdoor swim and hydrotherapy range, and the catalogue record for this model reads as follows:

Catalogue reference - WS-PC05ST-S

  • Shell dimensions: 5000 x 2400 x 1470 mm
  • Control system: 1 set
  • Swim training system: 1 set
  • Filter pump: 1 pc
  • Jet total: 6 pcs
  • LED lights: 4 pcs
  • Total power shown in the catalogue: 6.55 kW
  • Features listed on the page: water jets, LED lighting, ozone, swim training system

Treat those figures as a starting point rather than a finished specification. The water pump is not stated in this catalogue entry, and options such as heat pumps, UV sterilisation, sand filtration, insulation and steps are listed separately across the range; availability and compatibility change with the configuration you choose. Send us the model code and your intended use, and we will confirm which equipment is included before quoting.

2. Site dimensions and clearances

A five-metre shell needs more room than five metres. Before you ask about price, measure and send:

  • The clear internal length, width and depth of the pad or recess, including any plinth, coping or surround you intend to build.
  • Working clearance for the plant area, lid opening and future servicing access, not just the water footprint.
  • Ground conditions: slab, deck, terrace, sunken installation or an existing plinth, and whether drainage is already in place.
  • Overhead and side constraints such as pergolas, glazing, boundary fences or tree cover that affect crane or manual handling.

If the spa sits within a wider outdoor scheme, send the layout for the whole area. Our Furniture Series includes pergolas, loungers, dining and sofa sets that often surround a swim spa on a terrace or pool deck. Coordinating those items in one enquiry keeps materials, finishes and delivery dates aligned instead of arriving from three different suppliers.

3. Power, water and services

Electrical planning is where swim spa projects most often stall. The catalogue lists 6.55 kW total power for this model; your local electrician needs that number matched against the supply available on site. Please confirm before we quote:

  • Supply type and phase (single or three phase), available capacity at the panel, and the distance from the panel to the spa.
  • Whether a dedicated circuit and isolator will be provided by your electrician, to the protection standard required locally.
  • Water supply source, fill and top-up arrangement, and where overflow or drain-down water will go.
  • Heating intention: whether you want the spa usable year-round, which determines whether a heat pump belongs in the specification.
Electrical and plumbing work is carried out locally and must follow the codes and inspection requirements that apply at your site. We confirm the equipment specification; we do not design or certify your local installation.

4. How the spa will be used

The same shell serves very different briefs, and usage drives the option list. Tell us whether WS-PC05ST-S is for:

  • Daily swim training against the swim unit, which puts more demand on the pump and control setup.
  • Hydrotherapy and relaxation, where jet layout, seating depth and water temperature matter more.
  • A hotel, resort or villa rental, where bather load, cleaning routines, ozone or UV sterilisation and public-access rules shape the specification.
  • A private family garden, where children's access, cover requirements and run hours take priority.

If your project needs a spa shaped to the site rather than to a catalogue shell - square, round, oval or curved - our Customizable Shape Outdoor Spa covers bespoke geometry in an acrylic shell with structural reinforcement. Send drawings or a floor plan and we can compare that route against the standard model.

5. Delivery route and access

Swim spas are bulky and awkward to re-handle, so delivery detail belongs in the first conversation rather than the last. Useful facts to send:

  • Delivery address, port of discharge and whether you want door-to-door delivery or port collection.
  • Vehicle access at the site: road width, turning space, overhead wires, and how far the units must be carried from the truck.
  • Preferred arrival window relative to the civil works, so the spa lands after the slab is ready but before the surround is closed in.
  • Your import arrangements - who acts as importer of record, and whether you need commercial invoices, packing lists or certificates of origin prepared.

Our furniture logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, packaging and container loading, customs paperwork and shipment tracking. Import duties, taxes and site-specific handling are quoted per project, so we price them once your address and access details are known.

6. Budget structure and decision points

A useful enquiry states what the number must include rather than asking for "a price". Split your budget into:

  • The spa shell and included equipment as configured.
  • Options: heat pump, UV sterilisation, sand filtration, insulation, steps, cover.
  • Freight, insurance and duties to your site.
  • Local civil works, electrical and plumbing, carried out by your contractors.
  • Installation support and commissioning from our side.

With that split we can quote the supply scope precisely and flag what sits outside it. Where a villa or hospitality project also needs Turnkey Interior Project Solutions, grouping the swim spa with cabinetry, outdoor furniture, lighting and finishes into one procurement package reduces interface problems between trades.

7. A quick pre-enquiry checklist

  • Model code WS-PC05ST-S and the intended use (training, therapy, commercial or residential).
  • Measured pad dimensions, installation type and drainage arrangement.
  • Supply type, panel capacity and electrician's requirements.
  • Desired options: heating, sterilisation, filtration, insulation, steps, cover.
  • Delivery address, access constraints and target arrival window.
  • Whether the spa is a standalone purchase or part of a wider project package.

Send us the checklist and we will return a confirmed specification

SANTERSON has manufactured furniture and building materials for villa, hospitality and office projects since 2008, with custom/OEM production, freight to site and installation support handled through one team. Reach us through the contact page with the model code and your site details, and we will confirm which equipment is included in your configuration before pricing.