A media wall that mixes open shelves with closed cabinets looks simple on a rendering. It is the materials and finishes behind that mix that decide whether the unit still reads well after three years of daily use, or starts to show fingerprints, swollen edges and mismatched tones against the rest of the joinery. This guide compares the material and finish options we offer for Santerson Open & Closed Combo Units, and shows how to specify them so the open shelves, the closed carcass and the surrounding wall panels actually belong together.
What you are actually specifying on a combo unit
An open and closed combo unit has four surfaces that each need a decision, and buyers usually compare only one of them:
- Closed fronts. Doors and drawer fronts carry the finish that dominates the wall. They are also the surfaces most exposed to hands, so sheen level matters more here than anywhere else in the room.
- Carcass and inner boxes. The visible interior of open niches and the inside of a closed cabinet. When the interior is on display, it should be specified as a finished surface, not treated as a hidden structural part.
- Open shelves and niche frames. Long unsupported spans sag over time under heavy loads, and exposed edges are where moisture and impact damage start. Shelf depth, span and edge treatment need to be confirmed with the layout.
- Surrounding panels. If the unit sits inside a paneled wall, the panel finish has to match or deliberately contrast with the cabinet fronts— decided at drawing stage, not on site.
Every Santerson media unit in this family is made to measure: layout, dimensions, material and finish are set per project. That flexibility is why comparison has to happen sample by sample rather than from a catalogue swatch photographed on a phone.
Finish families we work with
The same cabinet construction can be ordered in several surface systems. These are the ones most often selected for living-room media walls, together with what each one asks of you in return.
| Finish family | Where it performs well | What to watch |
|---|---|---|
| Matte lacquer | Quiet, low-sheen walls; large slab fronts that should not bounce light across a living room. See Santerson Matte Lacquer Panels when the same tone must continue onto the wall. | Lacquer is applied in layers, so colour and sheen are matched by sample. Very dark matte tones show finger marks and dust sooner than mid-tones. |
| High gloss lacquer | Compact or dim living rooms where reflection helps; crisp modern fronts with minimal mouldings. | Gloss reveals every alignment error and every fingerprint. Best kept to closed fronts, not the open shelf band, where hardware and cables sit behind it. |
| Wood veneer | Warm schemes, hospitality and villa projects that need grain continuity across doors, shelving and wall cladding— for example Wood Veneer Panels run to the same sheet as the cabinet fronts. | Grain direction, cut sequence and tone have to be specified per elevation. Two orders from different batches of veneer will not match unless they are booked together. |
| Textured surfaces | Homes with children or high-touch media walls; texture hides handling marks and reads well under accent lighting. | Texture collects dust in the relief, so specify a cleaning method for the exact surface you choose, not a generic one. |
| Stone and marble panels | Feature surrounds and fireplaces combined with a media wall, where the unit is meant to read as architecture rather than furniture. | Weight, slab size and veining direction must be checked against the substrate and the mounting detail before the layout is fixed. |
| Glass fronts | Display niches that need dust protection while keeping contents visible— Santerson Glass Front Media Units use the same layout logic as the combo units. | Glass type, tint and hardware are project choices. Clear glass turns every stored box into part of the decor, so it only works where the contents are meant to be seen. |
Five questions that separate two look-alike quotations
- Is the open shelf a finished interior or a plain board? On an open and closed unit, part of the carcass is on display. Ask for the interior material and edge treatment in writing.
- What is the maximum unsupported span of each shelf? Give the clear width and the intended load— records, books, equipment— before we confirm the shelf thickness and any intermediate support.
- Are cabinet fronts and wall panels from one finish batch? Ordering the unit and the surrounding Santerson Textured Panels or veneer cladding in one production run is the simplest way to keep tones identical.
- How are cables, sockets and the screen handled? Closed fronts hide them; open niches do not. Conduit routes and socket positions must appear on the workshop drawing, since they cannot be corrected after the panel is finished.
- Is lighting part of the joinery or an add-on? Santerson Integrated LED Media Units show how a lit niche is built: channels, driver position and access are cut during production. Retrofitting surface strip light onto a finished shelf looks different.
Matching the unit to the rest of the wall system
Combo units rarely stand alone in a project specification. They sit in a family of configurable systems, and comparing materials across that family is what keeps a whole floor coherent:
- Santerson Wall Mounted Media Walls— floating the unit changes the load path and the shadow gap; ask how it is fixed and how services pass behind it.
- Santerson Full Height Media Walls— floor-to-ceiling fronts need a different door height and hinge specification than a low sideboard, and the top band should hold light, infrequently used items.
- Santerson Mixed Open & Closed Systems— modular living systems let the same material palette continue into shelving, desks and display niches in other rooms.
- Santerson Integrated Media Storage— where equipment must disappear completely, storage walls trade open display for a fully closed elevation.
A practical rule of thumb: keep the closed fronts in one finish and let the open niches carry a second, contrasting surface. It reduces the visual noise of an asymmetric layout and makes replacements easier, because only one large finish has to be re-matched later.
How we control finish consistency on project orders
SANTERSON has been manufacturing furniture and building materials since 2008, supplying villa, hospitality and office projects with built-in joinery produced to the drawings rather than to a fixed catalogue size. For media walls this means:
- Made-to-measure sizing, so shelf heights follow your equipment and collection instead of a standard module.
- Material and finish selection confirmed against physical samples before production starts, including the interior surfaces of open niches.
- Cabinet fronts, wall panels and matching joinery produced in coordinated batches, so veneer grain and lacquer tone line up across rooms.
- Custom and OEM work: alternative substrates, non-standard dimensions and project-specific hardware can be quoted from the same drawings.
Because these units are configured per project, published listings do not carry fixed dimensions, board specifications or lighting ratings. Those details are confirmed with your drawings and the room's electrical plan before an order is placed.
Send us the elevation
If you are comparing quotations for a media wall, send the room elevation together with the two or three finishes you are considering. We will mark which surfaces each finish suits, where an interior panel needs to be upgraded, and what has to be decided before production— then quote against that specification. More on our custom furniture materials and finishes service, or contact SANTERSON directly to start a sample pack for your project.