A design brief tells a fabrication team what the room should look like. An enquiry tells them what can actually be built, priced and shipped. The distance between the two is where concealed door projects usually lose time. Below is the practical path we follow at SANTERSON when a designer or contractor sends us a Santerson Decorative Concealed Doors concept and we turn it into a workable quotation.
What the design brief usually gives you
Most briefs we receive for concealed doors arrive as a mood board or a rendered elevation: a seamless wall surface, a door that reads as part of the panelling, sometimes a handleless detail, sometimes a panel that continues into a niche or a shelving reveal. That is genuinely useful. It fixes the visual intent, and it usually answers the question the client cares about first — will the opening disappear into the finish?
What a brief rarely contains is the information a factory needs to cut anything: the wall build-up the leaf will sit in, the clear opening dimensions after plaster and floor finishes, which face of the wall the swing goes to, and how the door surface is meant to match the surrounding panel. Our Santerson Handleless Concealed Doors and Flush Wall Aligned Doors are both made-to-measure products with material and finish options specified per project, so those gaps have to be closed before a price means anything.
Step 1: convert the visual intent into an opening schedule
Take every concealed opening in the drawings and give it a number. One row per door, not one note saying "concealed doors to match wall throughout". A simple schedule is enough to start a real conversation.
| Item on the schedule | Why we need it |
|---|---|
| Door tag / room reference | Keeps one opening distinct from the next on site and in the packing list. |
| Clear opening width and height, plus wall thickness | Sets the leaf size and the frame depth. Measure after plaster, not on the structural drawing. |
| Swing direction and hinge side | Determines whether the door can open against furniture, a corridor or a reveal. |
| Finish of the surrounding wall | Tells us how the leaf face is to be matched — paint, veneer, laminate or panel cladding. |
| Handle detail | Decides between a decorative concealed door and a handleless concealed door. |
| Quantity per type | Repeats drive production planning and container packing. |
| Delivery location and access notes | Affects packaging, freight mode and how the leaves reach the floor. |
If your drawings already carry door tags, you are most of the way there. If they do not, a marked-up plan with circles and numbers is fine — send it as it is rather than waiting to produce something polished.
Step 2: settle the wall build-up before the door
A concealed door is only as good as the wall it is set into. Before we can confirm a frame, we need to know what the leaf is being fixed into and how much depth that leaves. On villa and apartment fit-outs this is usually the point where the door and the paneling package have to be decided together, because the same finish has to run across both.
Where the concealed opening sits inside a wider joinery or panelling composition — a pantry behind a full-height panel, a study off a living room wall, a plant cupboard in a corridor — tell us that at enquiry stage. We build Integrated Door & Paneling, Wall Panel Systems and Wood Veneer Panels as made-to-measure work, so the door leaf, the frame and the adjacent panels can be produced against one set of dimensions and one batch of finish material rather than being reconciled on site by whoever arrives first.
Practical rule: if a concealed door is drawn next to custom joinery, treat them as one enquiry. Splitting them across suppliers is the most common cause of visible shadow lines and mismatched grain on an otherwise clean wall.
Step 3: choose the hardware language early
"Concealed" covers several different details, and they are not interchangeable once production starts. In our Windows & Doors range there are two broad directions:
- Decorative concealed door — the leaf sits flush with the wall surface while still carrying a visible opening detail. This is the choice when the wall has mouldings, reveals or a pattern that the door needs to pick up.
- Handleless concealed door — no visible handle or latch edge, opened by push action or a recessed grab. This is the choice for plain, minimalist surfaces where the goal is an uninterrupted plane.
- Flush wall aligned door — the emphasis is on the leaf and wall sitting in one plane, typically used when the surrounding finish is a continuous panel or cladding run.
Send us a photograph of the reference image you are working from, even if it is a competitor's room or a magazine page. We do not need the source — we need to see what "flush" means in your specific detail.
Step 4: attach the documents that let us price without guessing
An enquiry that includes the following usually comes back with a firm quotation rather than a set of questions:
- Room-by-room plan or elevation showing each concealed opening, dimensioned.
- Wall section or build-up note (masonry, stud and board, or steel frame), with the finished wall thickness.
- Finish schedule: paint code or sheen, veneer species and cut, laminate reference, or panel product name if it is one of ours.
- Fire, acoustic or privacy requirement stated as a question rather than an assumption — tell us what the room has to do, and we will confirm what the build can support.
- Project location, floor level and lift or stair access, so packaging and handling can be planned.
- Programme dates: when drawings need freezing, when the wall closure happens, when the doors must land on site.
Missing information is not a failure. Our design coordination team works through drawings, production coordination and on-site guidance as part of the service, so an early enquiry with incomplete data is often more useful than a late one with perfect data.
Step 5: confirm the specification in writing before tooling starts
Concealed doors are made to measure, and once the leaf is cut there is little room to move. Our confirmation sheet for each opening records the clear dimensions we will build to, the swing, the finish of the leaf face, the opening detail and how the frame relates to the surrounding wall finish. Read it against your own drawings — this is the moment to catch a door that was dimensioned before the floor build-up, or a veneer direction that does not match the panel run.
For projects where several openings repeat, ask us to confirm one first article and have it checked on site before the balance is released. That single step protects the whole batch.
Step 6: plan delivery and installation as part of the enquiry
Concealed doors need to arrive when the wall closure needs them, not when the joinery happens to be ready. We handle freight by sea, air and rail with customs paperwork and door-to-door delivery, and we provide on-site installation, inspection and snagging support after handover. Tell us at enquiry stage which of those you want us to cover and which your own trades will cover, so responsibility for the reveal — the most visible part of a concealed door — is fixed in advance rather than argued about later.
A short example: from brief to enquiry
A brief might read: "Corridor wall in dark oak panelling with a hidden door to the store room, no visible handle." Converted into an enquiry it becomes: one opening tagged D01, clear opening 900 x 2400 mm in a 150 mm finished wall thickness, swing into the store room, hinge on the left as you face the corridor, leaf face to be matched to the oak veneer panel run with grain running vertically, handleless push detail, project on level 3 with goods delivered to a loading bay with a 2.4 m lift. Those two versions describe the same door. Only one of them can be manufactured.
What we need from you, in one list
- Door schedule or marked-up plan with dimensions and tags.
- Wall build-up and finished thickness per opening.
- Finish reference for the surrounding wall and the leaf face.
- Opening detail: decorative, handleless or flush wall aligned.
- Any performance requirement stated as a question.
- Delivery address, access constraints and programme dates.
Send that package to us and the reply will be a specification you can sign off, not another round of drawings. If you are specifying concealed doors across several villas or apartments, we can also review the whole set of openings at once so repeat types are standardised before production begins.