A spa enquiry that only says "one round spa, 2.5 metres" comes back as a price. A spa enquiry that says what the space allows, who will use it and how it will be handed over comes back as a buildable proposal. Below is the sequence we use to turn a design brief into a quotation for a customizable shape outdoor spa, so your first message already carries the information our engineering and project teams need.

What the brief has to settle before a shape can be drawn

A personalised hydrotherapy pool is not a catalogue item resized in a spreadsheet. The shell, the reinforcement around it and the plant behind it all follow from three decisions: where the unit sits, what it is used for, and how it reaches that position. A garden slab, a first-floor terrace with a timber deck and a resort podium each answer those questions differently, and a shape that works on one can fail on another. The site conditions come before the outline.

Our product page for this line states the short version plainly: the spa supports customised shapes such as square, round, oval and curved designs to suit different spaces and usage needs, with an acrylic shell and balanced structural reinforcement for gardens, terraces and luxury leisure areas. Everything else in an enquiry exists to make that claim verifiable.

Send the space first, then the shape. Designers who start from a preferred outline often have to redraw it once the access route and structure are known; designers who start from the space usually keep their outline.

Step 1 - Give us the site conditions

Site information changes what we can reinforce, how deep the shell can run and whether a curved or free-form plan is workable at all. Please include:

  • Position and support. Ground-floor slab, terrace, deck or recessed installation - plus the finished level and any parapet, kerb or step that bounds the pool area.
  • Clear footprint and headroom. Maximum length, width and depth at the chosen position, measured to finished faces rather than to the drawn grid.
  • Access route. Door widths, lift size, stair turns or crane access from the delivery point to the final position. This decides whether a unit arrives as one shell or in sections.
  • Services already in place. Power supply available at the location, water feed and drain points, and where plant and controls can sit for servicing.
  • Exposure. Wind, sun, salt air and frost around the position, since these influence cabinet finish and insulation choices.

A sketch with dimensions, photographs from four directions and a marked access route are enough to start. We do not need a completed landscape drawing at this stage.

Step 2 - Describe use, not just style

Shape follows function. Tell us how the pool will be used and the outline usually chooses itself:

Intended useWhat it asks of the shape
Daily lap swimming or resistance trainingA longer water channel. Our long outdoor swim spa with hydrotherapy and relaxation pool pairs a swimming channel with a separate relaxation end, which is the layout to discuss when exercise comes first.
Massage, recovery and relaxing soaksA compact round or square plan keeps users close to the jet positions. See the round outdoor hot tub spa with hydrotherapy jets and underwater LED lights for that pattern.
Family use with childrenA wider, shallower entry zone and a shape that keeps sightlines open from the seating or house side.
Villa or resort hospitality settingA curved or oval outline that reads as part of the terrace design, coordinated with loungers, cabanas and hardtop shading from the same package.

Also state the typical number of bathers at one time, whether the pool serves one household or guest rooms, and how often it runs. That drives jet count, water treatment and heating sizing rather than being left to guesswork.

Step 3 - Choose the outline and finish

The four routes we work in most often for this product:

  • Square or rectangular - easiest to align with a deck edge, wall or building grid, and the most efficient use of a narrow terrace.
  • Round - suits an open garden corner or a circular feature platform; no sharp corners in high-traffic family settings.
  • Oval - softer than a rectangle while still giving a longer water line for swimming against.
  • Curved or free-form - follows an existing landscape curve or wraps around a column, planter or seating wall. Needs the clearest site drawings of the four.

Then fix the visible surfaces: shell colour, cabinet cladding (including wood-look finishes), steps and any lighting intent. If you are matching a wider project palette, send the finish samples or product references you are already using elsewhere on the project so the spa is specified in the same language as the rest of the exterior.

Step 4 - Specify the water side

This is where an enquiry either becomes a real configuration or stays a wish list. Tell us which of these you want and we will confirm what fits the chosen shell:

  • Hydrotherapy jets - count and position, focused on back, shoulder or leg zones.
  • Swim training unit - for counter-current swimming in a shorter basin.
  • Heating - including heat pump where running cost matters.
  • Filtration and sanitation - filter pump, sand filtration, ozone or UV sterilisation.
  • Insulation, steps and controls - for year-round use in cooler climates and for ease of daily operation.
  • Water features and LED lighting - waterfall outlets, spillways and underwater lighting, as shown on our luxury outdoor swim spa with massage jets, LED and water features.

Our wider swimming pools and swim spas range lists fixed models with published dimensions and equipment, which is a useful way to sanity-check scale before committing to a custom shell. Model WS-SP600, for example, is catalogued at 5900 x 2500 x 1600 mm with water jets, LED lighting, ozone and a swim training system; treat those figures as a reference point rather than the specification of your build, since included equipment and electrical requirements depend on the configuration selected.

Step 5 - Say how it is delivered and commissioned

A custom shell is only finished when it is full of water and working at your address. As a one-stop furniture and building materials supplier, we handle the parts most buyers otherwise have to coordinate themselves: freight by sea, air or rail with customs paperwork and container loading, door-to-door delivery to site, then installation support and after-sales cover including inspection, spare parts and maintenance. Tell us the delivery address, whether import clearance is handled locally, and who will run the on-site connection works, and we will map our scope against yours before production starts.

Where the spa forms part of a larger villa or hospitality package - outdoor furniture, pergolas and cabanas, wall cladding, lighting, bathrooms and cabinetry - it is usually simpler to place one order under turnkey interior project solutions, with a single production schedule and one delivery window.

The enquiry checklist to paste into your first message

  • Site: position, support type, clear length/width/depth, access route, exposure.
  • Services: power available, water feed, drain, plant location.
  • Shape preference and why (square, round, oval, curved) plus a sketch or reference image.
  • Use: swimmers, soakers, children, guest rooms; typical bathers at once.
  • Equipment wanted: jets, swim unit, heating, filtration, sanitation, insulation, steps, lighting, water features.
  • Finishes: shell colour, cabinet cladding, project palette references.
  • Delivery: address, Incoterms preference, who handles clearance and site connection.
  • Timing: required on-site date and any handover milestones it must meet.

Send that and the reply is not a single number. It is a shape proposal, an equipment list matched to your shell, a delivery plan and a quotation you can put in front of a client or a builder.

Start your enquiry

Contact SANTERSON with your site measurements and intended use, and we will come back with a customised shape option and configuration for your garden, terrace or resort project.

Product configurations, dimensions and included equipment are confirmed per order; the figures shown here are catalogue references, not fixed specifications.