A swim spa enquiry is where most project conversations go wrong, because the brief usually arrives as a rendering and a wish list. The rendering shows a long rectangular pool on a terrace. The wish list says "lap swimming plus hydrotherapy." Neither document says what actually decides whether the unit can be built, shipped, installed and switched on: the pit, the power supply and the equipment list. This article walks through that translation using one specific model from our catalogue, Outdoor Swim Spa WS-130BⅣ-U, so you can see exactly what to write down before you send the enquiry.
Start with the three numbers that constrain everything else
Before anyone talks about finishes, fix the physical envelope. For this model the catalogue lists an overall size of 9950 × 3000 × 1430 mm, which means a shell roughly ten metres long and just over one metre wide on every side once access clearance is added. Send us those three figures alongside your available opening, and we can tell you immediately whether the standard configuration fits or whether the layout needs to change.
Depth is the number buyers most often get wrong. A 1430 mm overall height is not the same as water depth, and water depth is what determines whether an adult can stand comfortably, whether a child seat makes sense, and whether the unit reads as a spa or as a lap pool on your site. Tell us who will use it and how, rather than guessing at dimensions yourself.
Match the jet layout to the intended use
The captured specification for this model shows 23 jets in total, served by four water pumps with a separate filter pump, plus five LED lights and one control system. That configuration points toward hydrotherapy and relaxation rather than continuous lap swimming; our records do not list a swim training system for this particular model. If your brief actually calls for counter-current swimming, say so at the start of the enquiry, because it changes which model in the range we quote and how the plant room is arranged.
Catalogue specification as captured on our product page
Model: WS-130BⅣ-U
Catalogue dimensions: 9950 × 3000 × 1430 mm
Jet total: 23 pcs | Water pump: 4 pcs | Filter pump: 1 pc
LED lights: 5 | Control system: 1 set
Total power: 11.85 kW
Features shown: water jets, LED lighting, ozone
Treat that block as a starting point, not an order. The figures come from our catalogue page for this model, and the equipment fitted to a delivered unit depends on the options you select. Quote the numbers back to us in your enquiry and we will confirm them line by line against the configuration you are actually buying.
Put the electrical load on paper early
The catalogue lists a total power figure of 11.85 kW for this model. That is the single most common reason a swim spa project stalls after quotation: the architect has drawn a terrace, the electrician has sized a sub-board for indoor fixtures only, and an eleven-kilowatt load with its own protection requirements appears late in the programme. Include in your enquiry where the unit sits relative to the main distribution board, what supply is already available on site, and whether you intend to run a heat pump for year-round use.
Optional equipment changes the load materially. Heat pumps, additional water pumps, UV sterilisation and sand filtration are all listed as options in our catalogue, and each one moves both the power draw and the plant space you need. Send your preferred option list with the enquiry rather than adding it after production has started.
Describe the installation condition, not just the location
- In-ground, semi-recessed or above ground? An in-ground unit needs a pit, drainage provision and side access for service; an above-ground installation needs a load-bearing deck and steps.
- What is underneath and around the shell? Insulation options are listed in the catalogue, and whether they matter depends on your climate and how often the spa runs in cold months.
- How does the unit reach the site? A ten-metre shell through a residential street raises crane and access questions that are far cheaper to answer during design than during installation.
- Who does the civil work? Tell us whether your contractor handles the base, surround and waterproofing, or whether you want us involved in coordination on site.
What a good enquiry actually contains
1. The model reference you are asking about, plus your three site dimensions and a plan or photo of the position.
2. Intended use: hydrotherapy, family swimming, hospitality guest use, or lap training.
3. Your option list from the catalogue, for example heat pump, UV sterilisation, sand filtration, insulation and steps.
4. Available electrical supply and where it comes from on site.
5. Delivery location, access constraints and your target programme date.
6. Whether you want the surrounding terrace furniture specified at the same time.
Item six matters more than most buyers expect. A swim spa is rarely bought alone; it sits inside a poolside scheme with loungers, shade structures and hard landscaping. Coordinating those items in one production run reduces mixed deliveries on site. Our project services cover design coordination, custom and OEM production, door-to-door logistics and installation support, so the spa and the furniture around it can be handled as a single package instead of three separate supply chains.
When a standard model is not the right answer
Our catalogue carries a wide range of outdoor swim spas and hydrotherapy pools, including long-format units that pair a swimming channel with a relaxation pool, luxury spa configurations built around massage jets and water features, and customisable-shape pools where the plan itself is negotiable. If your terrace is narrower than three metres, or if the brief calls for a shape that follows a building line rather than a rectangle, we would rather quote from a drawing than force a standard shell into it.
Note on accuracy: dimensions, jet counts and power figures in this article are transcribed from our product catalogue page for WS-130BⅣ-U. Fitted equipment, electrical requirements and final specifications must be confirmed against the configuration ordered before production.
Send us your brief. Attach the plan, the three dimensions, the option list and the available supply, and we will come back with a specification sheet for WS-130BⅣ-U or the model in our swim spa range that suits your site better.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com | Enquiry page