A swim spa quote is easy to compare on one number and hard to compare on everything else. Two quotations for the same footprint can differ by thousands of dollars, and the difference is usually hiding in what the specification sheet does not say. If you are evaluating a Outdoor Swim Spa WS-125Aⅱ for a villa terrace, a resort garden or a private residence project, the checklist below is what we ask buyers to confirm line by line before signing anything.

1. Confirm the exact model variant

Model codes in this category look almost identical and mean different things. In the SANTERSON range, WS-125Aⅱ and WS-125Aⅱ-U share the same catalog shell size but differ in what is fitted inside it: the base Aⅱ listing includes a swim training system, while the U variant does not. The same pattern runs through the 115 and 130 series.

Before comparing prices, check that both quotations name the same suffix, not just the same "125". A cheaper quote is often a different variant, not a better deal.

2. Match shell dimensions to your slab and access route

Catalog dimensions for WS-125Aⅱ are 5500 × 2300 × 1350 mm. Those three numbers drive three separate site questions:

  • Length and width determine the footprint of the prepared base, plus clearance for the cabinet access side.
  • Height affects the water level relative to the deck edge and whether steps are needed for children or older users.
  • Transport is where projects get expensive late. A unit of this length rarely passes through a standard side gate, so confirm whether it travels by crane, through the house, or along a cleared route.

Ask the supplier to state the delivered dimensions including cabinet cladding and steps, not just the internal shell.

3. Count what is actually fitted, item by item

Marketing copy describes features; a purchase order should list quantities. The catalog specification for WS-125Aⅱ reads as follows:

Specification lineCatalog figureWhat to verify on the quote
Control system1 setWhich controller, and whether spare replacement is supplied locally
Swim training system1 setFitted or optional; this single line moves the price most
Water pump / filter pump1 pc eachPump brand and rated flow, not just "heavy duty"
Jet total20 pcsJet types and zoning, since 20 jets in one zone behave differently from zoned jets
LED lights3 pcsIn-cabinet or underwater fitting, and colour control
Total power8.05 kWWhether the figure includes a heat pump or only the standard equipment

The 8.05 kW line deserves particular attention. If one quote's power figure excludes heating and another includes it, you are not comparing the same product, and your electrical quotation will be wrong as well.

4. Separate standard equipment from options

Catalog-listed options for this range include control system upgrades, UV sterilisation, additional water pumps, heat pumps, sand filtration, extra insulation and steps. Availability and compatibility vary by model.

Ask for two prices: the standard build as catalogued, and your configured build with every option priced separately. A bundled "all inclusive" figure makes it impossible to see what you are paying for, and makes change orders expensive later.

Insulation and heat pump in particular change running cost more than almost any other line, so they should be decided at quotation stage rather than after the shell arrives.

5. Get the electrical requirement in writing

This is the most common cause of a delayed handover. The supplier should state supply voltage, phase, dedicated circuit sizing, protective device requirements and the recommended cable run from the meter or distribution board. Your local electrician then confirms this against local wiring rules; a foreign supplier's datasheet is not a compliance document.

Where the spa will sit in a cooler climate or be used year-round, ask how the quoted power figure behaves at low ambient temperature, since heating demand and run time both rise.

6. Check who handles delivery, base preparation and commissioning

A swim spa is a multi-trade item: prepared base, electrical, delivery access, crane hire if needed, and first fill and commissioning. A quotation that covers only the unit leaves you to coordinate the rest yourself.

SANTERSON describes its project workflow as running from consultation and design through production, logistics, installation and after-sales, with logistics and door-to-door delivery covering freight forwarding, customs paperwork, packaging and container loading. For an imported unit, ask explicitly who does the offload, who prepares the base, and whether commissioning is included or is a separate visit.

7. Ask about customisation before you lock the specification

Where a standard footprint does not suit the site, the range includes configurable units. A Customizable Shape Outdoor Spa is offered in square, round, oval and curved forms with an acrylic shell and structural reinforcement, for gardens, terraces and leisure areas. The wider Swimming Pools and Swim Spas catalogue also covers longer swim channels with separate hydrotherapy seats, which suit lap training better than a compact shell.

Custom work changes lead time and tooling cost, so raise it at the quotation stage. Once the standard model is ordered, redesign becomes a change order rather than a decision.

8. Read the after-sales terms as carefully as the price

Confirm what is covered, for how long, and who supplies wear items such as cartridges, jets and controllers once the unit is in service. For an imported swim spa, the practical question is not whether spare parts exist but how quickly they reach site and who fits them. SANTERSON lists installation and after-sales support including inspection, warranty coverage, spare parts and maintenance; get the specific terms for your configuration in writing rather than relying on general service claims.

A short pre-order checklist

  • Exact model suffix, including whether the swim training system is fitted
  • Delivered dimensions with cladding and steps, plus the access route
  • Pump brand and flow, jet zoning, LED count and controller model
  • Total power stated with or without heating
  • Options priced separately from the standard build
  • Electrical specification in writing, verified by a local electrician
  • Delivery, offload, base preparation and commissioning each assigned to a named party
  • Spare parts supply path and warranty terms for your configuration

Compare two quotations against this list rather than against their totals, and the price difference usually explains itself.

Send us the model suffix, your site dimensions and how you intend to use the spa — lap swimming, hydrotherapy or family use — and we will confirm the configuration, the electrical requirement and what is included before you commit.