A mirror cabinet rarely decides a project on its own, yet it is one of the bathroom items that most often comes back as a site query: the wrong overall height, a door that swings into a basin tap, a finish that does not match the vanity opposite. If your team is specifying the Santerson Tall Mirror Cabinet for villas or residential bathrooms, the paperwork you build around it matters as much as the product selection itself. Below is the documentation set we ask buyers and their consultants to complete before an order is placed.
Why a made-to-measure unit needs its own record
The Tall Mirror Cabinet sits in our Mirror Cabinets collection alongside the Santerson LED Mirror Cabinet and the Santerson Round Mirror Cabinet. Like the rest of that group, it is not supplied in a fixed size. Height, width, depth, layout, materials and finish are all specified per project, so each unit is produced against your documented configuration rather than a catalogue code.
That flexibility is useful on site, but it means the specification sheet becomes the contract of record. When dimensions, mirror type, door direction or finish are only described in an email thread, the factory produces what was last written down, and the mismatch surfaces at installation. A short, consistent documentation pack prevents that.
The six items to document for every unit
| Item | What to record | Why it matters on site |
|---|---|---|
| Location and quantity schedule | Bathroom or room reference, unit count per room, storey or block if the same layout repeats | Tall cabinets are often repeated across identical guest bathrooms; a room code keeps variations from being mixed up in one shipment. |
| Overall dimensions and clearances | Finished height, width and depth, plus clearance to basin, tapware, mirror lights, tile set-out and any wall recess | Cabinet depth and the space in front of it determine whether doors and interior shelves actually operate once the vanity is fitted. |
| Door type and opening direction | Hinged or mirrored door arrangement, which side it opens from, handle or integrated pull choice | An inward-opening door that clashes with tapware or a wall return is one of the most common snag items in bathroom fit-outs. |
| Interior layout | Number and position of shelves, whether adjustable, closed versus open compartments, provisions for shaver socket or charging | Interior spacing decides whether guests can store the tall bottles a hotel programme usually lists. |
| Finish and material call-off | Body material, door finish, mirror edge treatment, hardware finish, and the matching vanity or wardrobe finish it should coordinate with | Sample approvals travel better than colour names; note the reference used for sign-off, not just a descriptive label. |
| Lighting and electrical interface | Whether lighting is integrated or surface-mounted, feed location, switching arrangement, who supplies and terminates the circuit | Cable routes are set during first fix. Once tiles are on, moving a feed is expensive. |
Two supporting records are worth adding for multi-unit orders: a dated approval sheet showing which sample or rendering was signed off, and a delivery sequence note stating which bathrooms receive which units and in what order. Both take minutes to prepare and remove most of the arguments at handover.
How this fits with our project workflow
As a one-stop furniture and building materials supplier, we normally receive bathroom schedules as part of a wider package that also covers vanities, tall cabinets, wall panels, flooring and lighting. The Tall Mirror Cabinet is documented the same way as those items, so it helps to send one consolidated schedule rather than separate lists per category.
Through our Custom & OEM Service, the documented configuration becomes the production brief: sizing, material and finish options, and layout are confirmed against your drawings before manufacture. Our project services then cover production coordination, packing lists that reference your room codes, door-to-door delivery, and installation support with inspection at handover. Where a project needs it, our interior design team can prepare layout drawings and 3D renderings first, so the mirror cabinet dimensions you send us are already coordinated with the vanity and wall finishes opposite.
A simple checklist before you send the enquiry
- Room-by-room schedule with quantities and unit references
- Finished dimensions with clearances to basin, tapware and lighting feeds
- Door arrangement and opening direction per unit
- Shelf layout and any internal compartments or electrical provisions
- Finish call-off, with the sample or reference used for approval
- Confirmation of who supplies and terminates the lighting circuit
- Delivery sequence and site access notes for the receiving floor
Send us that pack and there is usually one round of clarification instead of several. Dimensions, materials, hardware and installation requirements are then confirmed for each selected configuration before production starts.