A floor lamp that carries a project schedule usually arrives with three names attached to it: the drawing reference, the purchase order line and the label on the crate. When those three do not match, the lighting package stalls. If you are sourcing a modern semicircle arc floor lamp for a villa lounge or a hotel dining room, the specification sheet is the document that decides whether the arch actually clears your table. This guide walks through the fields to write down before you request a quotation, using our silver dome standing lamp as the worked example.

What the product has to do on site

The Modern Semicircle Arc Floor Lamp, Silver Dome Standing Lamp for Living Room & Dining Room is a freestanding accent luminaire. The published product description covers three physical elements: an elegant curved arch pole, a reflective silver dome shade and a sturdy square base. Its sculptural form spans over furniture, which is exactly why it gets specified in two settings at once — a living room where it arcs over a sofa group, and a dining area where it stands beside the table instead of hanging above it.

Write one sentence at the top of your specification that states the job in plain words: "freestanding arc floor lamp, placed on the finished floor beside the dining table, dome centred over the seat zone, no ceiling connection." That single line tells the factory whether you need a ceiling rose, a recessed floor box or nothing at all, and it stops a pendant quotation from arriving by mistake.

The fields that decide fit

For an arc lamp, dimensions are not decoration — they are the clearance calculation. Record each item below with your own measured number, and state the unit once, clearly.

FieldWhat to write downWhy it fails if skipped
Overall heightFinished height from floor surface to the top of the arch, in mm or inchesThe lamp strikes a ceiling bulkhead, a pelmet or a pendant drop
Arch reach (offset)Horizontal distance from the base centreline to the dome centreThe dome sits on the wrong side of the table or hangs over an aisle
Base footprintWidth and depth of the square base, plus its thicknessThe base will not pass a doorway, or it fouls a rug edge or chair run
Base weight and ballastNet weight, and whether additional ballast is supplied or must be provided locallyA light base under a long arch tips when a chair brushes it
Shade diameter and dropDome diameter and how far the shade hangs below the arch endSightlines across the dining table get blocked
FinishName the silver finish explicitly, including whether the surface is polished, brushed or coated"Silver" reads differently to a painter, a metalworker and a purchasing clerk

Clearance checks worth doing before you sign

  • Tape out the base footprint on the actual finished floor, not on the screed drawing, and confirm the arch line clears every chair back in its full range of movement.
  • Mark the dome centre at the lamp's working height and check it against your table or sofa plan — an arc lamp that misses its target by 300 mm looks like a mistake even when the fitting itself is beautiful.
  • Confirm floor covering. A thick villa carpet compresses under a base, changing both the working height and how stable the lamp feels.
  • Note the wall distance. If the base must sit tight to a skirting or a glazed edge, say so on the drawing; it affects whether the base can be notched.

Electrical and light output: leave these blank until they are confirmed

The captured product copy for this lamp describes its form — curved arch pole, reflective silver dome shade, square base — but it does not publish lumen output, wattage, colour temperature or an IP rating. Treat those as fields to be agreed with the manufacturer for your specific order rather than values to copy from a brochure. Put them in the specification as named blanks:

  • Lamp fitting and driver type, and whether the light source is included or supplied locally.
  • Colour temperature and dimming behaviour, including which control gear on your side of the supply handles the dimming.
  • Cable exit point, cable length and plug type for the destination country's socket and wiring rules.
  • Switch location: on the cable, on the stem, or none at all because the lamp sits on a switched circuit.
  • Whether any ingress or impact rating is required for the position — a dining room corner and a semi-exposed terrace loggia are not the same request.
Ask for these items in writing before production starts, and ask for them per order. Electrical configuration follows the destination market, so a value confirmed on one project does not automatically carry over to the next.

Customisation and how it changes the paperwork

SANTERSON is a one-stop furniture and building materials supplier working on villa, hospitality and office projects, and our Custom & OEM Service covers bespoke material finishes and textures, prototyping and brand customisation alongside standard catalogue production. For an arc floor lamp, the practical customisation questions are narrow and easy to specify: arch reach, overall height, base size, finish, and cable configuration.

Each change you make should appear as a line in the specification with a drawing reference and a revision date. A revised arch reach changes the stability calculation for the base, so it is never an isolated edit — record both together. If you are ordering the lamp as part of a wider package, group it with the pieces it interacts with: Modern Arc Floor Lamp, Curved LED Standing Lamp for Living Room & Bedroom and Modern Globe Floor Lamp, Gold Reflective Standing Lamp for Living Room & Hotel Room often appear on the same lighting schedule, and a single shared table of heights, reaches and finishes keeps that schedule readable for everyone downstream.

Sample approval: what to sign off on

For project quantities, request one pre-production sample or a documented mock-up of the finish before full production. On the sample, check five things and write the result into the approval note:

  • The arch curve against your marked-out clearance line on site or in the showroom.
  • Stability with hands on it — a chair pushed against the base should not walk the lamp across the floor.
  • How the silver dome reads under your actual room lighting, day and evening; a reflective shade behaves very differently from a matte one.
  • Assembly method: how many pieces arrive, who assembles them, and what fixings are involved.
  • Packaging, including corner protection on the arch and separate packing of the base so the two do not travel against each other.

Delivery and after arrival

Lighting is where packaging decisions show up three weeks later. Our Logistics & Door-to-Door Delivery service covers freight forwarding, customs paperwork, container loading and tracking, and our Installation & After-sales Support covers on-site installation, inspection and snag lists. For an arc lamp, put two instructions into the packing specification: ship the base and the arch as separately cushioned items in one crate, and label the crate with the room and the arch direction so installers do not guess which way it faces.

On handover, keep one spare of each consumable item — light source and driver — stored on site. That is a line item, not an assumption, and it belongs in the same specification table as everything else.

A specification you can copy

Before you send an enquiry, your sheet should answer these questions in one page: what the lamp is, where it stands, how tall it is and how far it reaches, what the base weighs and measures, what finish name you have approved, what light source and control you require for the destination market, what has been sampled, and how it must be packed and delivered. Fill those blanks with measured numbers and named finishes, leave unconfirmed electrical values explicitly marked as to be agreed, and the quotation you get back will match the lamp you installed.

The product page for this fitting is here, and the full lighting range sits under Lighting Products. Send us your measured dimensions and room drawings and we will return a specification sheet you can put straight into your schedule.

Talk to us about your lighting schedule

SANTERSON — furniture and building materials manufacturer, Foshan, China. Contact: PHILLIP. Phone / WhatsApp: +86-13928214007. Email: santerson@qq.com. Enquiries are answered within 24 hours, Monday to Saturday, 8:00 AM – 6:00 PM (GMT+8).