Interior Fixtures · Custom Wardrobe Procurement

A made-to-measure wardrobe is one of the last trades to land on site and one of the easiest things to get wrong. Panels arrive after the flooring is down, the sliding gear is in a different container from the carcasses, and the joiner who was booked for Tuesday is standing in an empty bedroom. Below is how we plan delivery and installation for custom minimalist bedroom wardrobes on apartment, villa and hotel projects, so the storage work finishes inside the programme instead of at the end of it.

Why minimalist wardrobes are unforgiving at the install stage

Our custom minimalist bedroom wardrobes are built around flat panels, clean lines and an optional handleless front. That look is exactly what makes the installation tight. With no mouldings, no bevels and no hardware to absorb error, a floor that is out of level or a wall that wanders 6 mm over two metres shows up immediately on the finished elevation.

Three details drive most of the coordination work:

  • Flush reveals. Where a wardrobe meets ceiling, skirting or an adjacent door opening, the gap has to be set at the design stage and then held on site. We confirm the reveal width with your site team before drawings are released for production.
  • Handleless fronts. Push-to-open and integrated profile handles need clearance behind the door line. That clearance is a site condition, not a factory one, so it has to be agreed with the main contractor before the first panel is cut.
  • Built-in integration. On apartment and hotel rooms the wardrobe often wraps around structural columns, trunking or a bedhead power position. Field verification of these points is what keeps the internal layout usable after handover.

The sequence we plan against

SANTERSON works as a one-stop furniture and building materials supplier, so the wardrobe is scheduled alongside the cabinetry, doors, vanities and finishes that share the same rooms. The order below follows the workflow on our service pages: design and planning, production, logistics, installation, after-sales.

StageWhat has to be fixed before it startsWho confirms it
Design and measurementRoom dimensions, floor finish build-up, ceiling level, door swing clearances, internal layout (hanging zones, drawer zones, shelf storage)Your design team and our project coordinator
Technical drawing sign-offPanel elevations, reveal widths, handleless mechanism choice, board material and surface finishBoth parties, in writing, before production release
ProductionConfirmed drawings, approved finish samples, agreed unit count per room typeOur factory, with your inspection window if required
Packaging and loadingContainer mix by room or floor, hardware packed with its matching panel set, packing list keyed to room numbersOur logistics coordinator
Site readinessWet trades complete, flooring laid, walls dry and level, lighting and power positions fixed, storage area for cratesMain contractor
InstallationAccess route for long panels, lift or crane if upper floors, install crew booked against the vessel arrival dateMain contractor with our on-site guidance
Snag and handoverPunch list per room, spare hardware left on site, adjustment of doors and drawersJoint inspection

Delivery planning: what to decide before the container is loaded

The single most useful decision is which room each crate belongs to. A packing list written as "12 wardrobes" tells the site team nothing at 7 a.m.; a list written as "Rooms 04, 05, 06, level 2" lets them unload in the order they need.

  • Ship in installation order, not production order. Panels for the first floors to be handed over go into the front of the container.
  • Keep hardware with its panel set. Sliding tracks, hinges, runners and integrated handle profiles are bagged, labelled and boxed with the carcasses they belong to.
  • Order spares with the main consignment. A replacement door panel sourced six months later has to match a production run that may no longer be open. Order spare fronts and matching drawer units in the original batch.
  • Confirm the delivery address and access early. Narrow villa driveways, basement lifts and hotel loading-bay hours all change how panels are crated. Tell us at the quotation stage, not at port discharge.
  • Check panel length against site access. Full-height side panels for a floor-to-ceiling built-in may need to be split into two sections with a joint line drawn and approved on the elevation.

Our logistics service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Import terms, duties and transit arrangements are confirmed project by project with your team, since every destination is different.

Site conditions that must be signed off before installers arrive

Install crews lose more days to the room than to the wardrobe. Before the delivery date is fixed, ask the main contractor to confirm these conditions in writing:

  • Floor and ceiling levels. Check flatness across the full wardrobe run. Where levels vary, decide whether the scribe goes at the top or the bottom, and show it on the drawing.
  • Wall squareness. A non-square corner changes the visible reveal on both elevations. Either pack the carcass plumb and accept a tapered scribe, or set the wardrobe off the finish line of one wall only.
  • Floor covering sequence. Built-in wardrobes are normally installed over the finished floor, not under it. Confirm which applies, because it changes both the unit height and the delivery date.
  • Services. Power positions for internal lighting, trunking routes, and any bedhead switch plates have to be in their final position before panels close them in.
  • Environmental conditions. Board materials should not be unpacked into a room that is still wet from plaster or screed. Ventilation and a dry environment protect panel edges and finishes.

If your site cannot confirm these conditions, delay the delivery rather than receive it. Crates stored in a dry, secure area cost nothing; panels installed into an unprepared room cost a re-order.

Storage layout decisions that affect both production and installation

Modern storage planning is not just about filling the wall. The internal layout determines panel loads, door sizes and the sequence of assembly, so it has to be locked before drawings are released.

Hanging zones

Set hanging heights from the actual garment mix: short-hang double rows for shirts and jackets in hotel guest rooms, long single hang for dresses and coats in villas. A deep hanging zone needs a deeper carcass, which changes the reveal at door openings.

Drawer zones

Drawers sit lowest in the stack and carry the most weight. Runners need clearance under the drawer front, and on a handleless design the pull line has to be reachable without a visible lip. Where rooms repeat, keep drawer block heights identical so site teams can assemble from one instruction sheet.

Shelf storage

Fixed shelves carry long-span loads; adjustable shelving needs a row of peg holes that must line up across carcasses. If you want open display sections beside closed doors, as in many minimalist open wardrobe designs, the transition detail between open and closed bays is drawn and approved before production.

Coordinating the wardrobe with the rest of the fit-out

Wardrobes rarely sit alone. They meet interior doors, wall panelling, skirting, engineered flooring and lighting, and each junction is a coordination item.

  • Doors. Hinged wardrobe doors need clearance from an adjacent room door handle. Flush and flush interior doors in the same wall plane require one shared setting-out line, agreed with the door supplier before either is manufactured.
  • Flooring. Where engineered flooring runs through to the wardrobe face, the threshold detail decides whether the wardrobe sits on the floor or the floor butts into it. Both are workable; only one suits your programme.
  • Lighting. Internal wardrobe lighting needs a driver position and a switched feed. Agree this with the electrical contractor at first fix.
  • Walls. Where panelling or decorative wall panels continue past the wardrobe, the panel module and the wardrobe module should be set out from the same grid.

Common failure points, and how planning removes them

Failure pointTypical causePlanned control
Panels do not fit the openingMeasure taken before floor finish build-upFinal field survey after flooring, with drawing revision if needed
Visible gaps at ceilingCeiling level varies along the runLevel survey and agreed scribe detail on elevation
Doors rub after handoverBuilding settlement or packed carcass out of plumbPlumb and line check at install, hinge adjustment at snag stage
Handleless fronts not releasingClearance behind door not provided on siteMechanism clearance written into the drawing and checked at first fix
Hardware missing on install daySeparate parcels, different arrival datesHardware boxed with its panel set, one crate per room
Colour mismatch on later additionsSecond order from a different production runFinish sample retained and approved; spares ordered in the first batch

Handover, snagging and after-sales

Our installation and after-sales service covers on-site installation support, inspection and snags, warranty coverage, spare parts and replacement, and ongoing maintenance. On a practical level this means a room-by-room punch list at the end of installation: door alignment, drawer runners, internal lighting, panel edges and finish consistency under site lighting rather than torchlight.

Keep the approved finish sample and the signed drawing set after handover. They are what make a later repair or an extension to another room match the original work.

Frequently asked questions

When should wardrobe measurements be taken?

Take a preliminary set at design stage for planning and quotation, then a final field survey once the floor finish, ceiling set-out and wall finishes are complete. Production drawings are released against the final survey.

Can wardrobes be shipped with other fit-out items?

Yes. Consolidating wardrobes with cabinetry, doors, vanities and finishes in one consignment reduces handling and keeps the site schedule simple. Crates are still labelled and grouped by room so unloading follows the installation order.

What if the site is not ready when the container arrives?

Tell us before discharge. Panels can be held or redirected to a dry storage location, but that decision has to be made in advance so it does not sit on the demurrage clock.

Do handleless fronts limit the design?

They change the detailing rather than the layout. Push-to-open and profile-pull solutions both work on full-height doors, but each needs its own clearance behind the door line, so the mechanism is chosen before drawings are made.

Who installs the wardrobe?

Either your joiner or our installation support team, depending on the project. We provide assembly instructions keyed to the room-by-room packing list, and on-site guidance where the contract requires it.

Planning a wardrobe package for your project

Send us the room schedule, the floor and ceiling levels, and the internal layout you want, and we will return panel elevations, a material and finish specification, and a delivery plan built around your site programme. As a China-based supplier of interior fixtures and furniture, SANTERSON handles the wardrobe alongside the rest of the fit-out under one coordination point, from design through production, logistics and installation support.

Contact our project team to start a wardrobe package for apartment, villa or hotel work: phone / WhatsApp +86-13928214007 (PHILLIP), email santerson@qq.com, or use the contact page.