A drawer-focused modular wardrobe looks simple on a drawing: a run of carcasses, a stack of drawers, a door elevation. It is exactly this apparent simplicity that causes trouble in procurement. The details that decide whether the built-in works for years — what goes into each drawer, how deep it is, which runner carries the load, how the fronts line up with the wall — are rarely written down until someone asks at the worst possible moment.

In our experience supplying fitted wardrobes for villa and apartment projects, the difference between a smooth handover and a long snag list comes down to what the designer and the buyer agreed before production started. Below is the alignment checklist we work from on residential wardrobe packages such as Drawer Focused Modular Wardrobes.

1. Storage intent: who uses it, and for what

Designers usually start from the elevation; buyers should start from the inventory. Before any carcass is drawn, both sides should agree on the contents the wardrobe has to hold, because that single answer drives drawer depth, drawer count and layout.

  • Daily versus seasonal. Everyday items belong in reachable drawers; off-season bedding and luggage belong above the door head or in a separate compartment.
  • Folded versus hung. A drawer-heavy layout only works if the household actually folds. Where hanging dominates, deep drawer stacks add cost without adding usable space — a Hanging Modular Wardrobe is often the better starting point.
  • Small items. Jewellery, watches, documents and accessories need shallow top drawers or inserts, rather than one deep box where everything ends up mixed.
  • Shared use. Two people using one run means duplicated zones — mirrored drawer banks for each side — rather than one long stack of the same depth.

Put this in writing as a room-by-room schedule. A sentence per bedroom is enough: "Master bedroom — folded tops in the shallow upper drawers, trousers in the two deep lower drawers, suitcases on the top shelf." That one sentence prevents change orders later.

2. Layout and dimensions: the numbers both sides must sign

Modular wardrobes are made to measure, so the drawing has to carry real figures rather than a nominal module count. Designers and buyers should confirm the following items together, on one document, before the order is placed:

Item to align onWhy it matters at production
Overall width, height and depth per runDetermines module split and whether scribes or end panels are needed to take up out-of-plumb walls and uneven returns.
Drawer count, clear opening height and depth per columnDecides whether the contents fit and whether top drawers stay shallow enough to be usable.
Carcass height relative to the ceilingA run taken to the ceiling needs an access plan for the top zone; a gap above the doors collects dust and looks unfinished.
Door type and swing or slide clearanceHinged doors need clearance from ceilings, skirting and adjacent returns; sliding doors take up part of the opening.
Obstructions: switches, sockets, radiators, beams, skirtingThese are found on site rather than on the architect's plan, and must be shown on the production drawing.
Final floor and wall finishesCarcass heights are set against finished levels; a change in screed or cladding shifts the whole run.
Practical rule: the manufacturer's shop drawing should never be the first document that carries dimensions. The designer issues setting-out dimensions, the factory returns a production drawing, and the two are compared line by line before sign-off.

3. Drawer hardware: specify it, do not assume it

Hardware is where value engineering quietly erodes performance. A drawer-focused layout lives on its runners, so the specification should name the hardware rather than accept "standard fittings".

  • Runner type and load rating. Side-mounted and undermount (concealed) runners behave differently and carry different loads. Deep lower drawers holding folded linen or heavy items need a higher rating than shallow top boxes.
  • Full extension. Without full extension, the rear of a deep drawer stays out of reach in daily use — one of the complaints raised most often at handover.
  • Closing action. Soft-close or push-to-open changes both feel and cost; decide per drawer bank rather than blanket-applying one option.
  • Front style and handle scheme. Handleless fronts, integrated profiles or knobs change the gap between drawers and how the fronts align. Confirm a sample elevation before production.

Ask for the hardware to be listed by type in the quotation, not buried as an inclusive line item. If two suppliers quote the same carcass construction but different runners, they are not quoting the same wardrobe.

4. Materials and finish: match the rest of the joinery

A wardrobe rarely stands alone. It sits beside kitchen cabinetry, wall panelling and doors, and any mismatch in tone or sheen shows up as soon as the rooms are furnished. Both sides should agree on:

  • Carcass board versus door front material — these are often different specifications and different prices.
  • Finish family: matte lacquer, high gloss, acrylic, melamine, veneer or solid wood, each with its own behaviour around fingerprints, edges and light.
  • Tone reference. Quote a physical sample or the client-approved swatch, not a colour name, especially when wardrobes and interior fixtures are produced in different batches.
  • Interior finish. The inside of a drawer box and the back panel are seen every day; specify them rather than leaving them to default.

Where a project mixes wardrobe types — for example a Combination Modular Wardrobe in one bedroom and a drawer-focused run in another — fix one finish schedule that covers all of them, so the doors and fronts read as one family.

5. Commercial alignment: what is quoted, made, delivered and installed

Buyers carry the cost and the programme; designers carry the intent. The two only reconcile when the quotation is broken down to the same level of detail as the drawing.

  • Scope per unit. Confirm what each wardrobe price includes: carcasses, doors, drawer boxes, runners, inserts, lighting, scribes and trims.
  • Variations. Agree how a change to drawer count or depth after sign-off is priced, and how long it takes.
  • Packaging and delivery. Modular components arrive as flat packs or as pre-assembled carcasses; the choice affects site handling, storage space and installation time.
  • Site conditions for installation. Completion of flooring, painting and first-fix electrics should be confirmed before an install date is set. Otherwise the wardrobes arrive to a room that is not ready for them.
  • Snag and after-sales route. Name who inspects on completion, who raises snags, and how replacement parts such as a drawer front are ordered.

6. The sign-off checklist

Before production is released, one page should answer each of the following:

Storage schedule per bedroom — agreed

Setting-out dimensions against finished levels — signed

Drawer count, depth and clear opening per column — shown on the drawing

Runner type, load rating, extension and closing action — named in the quotation

Door type, clearance and handle scheme — confirmed

Finish reference by physical sample, matched to adjacent joinery — approved

Site obstructions such as switches, beams and skirting — shown on the production drawing

Delivery sequence and installation date tied to site readiness — confirmed

Snag and replacement-parts procedure — written down

If any line is blank, production should not start. Each of these gaps turns into a variation once the carcasses have been cut.

Where the designer's intent meets the supplier's drawing

Wardrobe problems rarely stay inside the wardrobe. The same finish has to match kitchen cabinets, wall panels and doors, and the whole set has to arrive in the right sequence for the site programme. That is why many villa and apartment projects place fitted joinery with one manufacturer who also handles the surrounding furniture and building materials: through our custom furniture design and prototyping service, wardrobe layouts are made to project-specific dimensions with selectable materials and finishes, coordinated with the rest of the fit-out, shipped to site with door-to-door delivery and followed up through installation.

Send us the room schedule and the setting-out drawing, and we will return a production drawing with drawer layout, hardware and finish itemised separately, so designers and buyers are reading the same document before anything is made.

Specify your wardrobe package with us

Share your drawings and storage requirements for a made-to-measure quotation on drawer-focused modular wardrobes. View our Drawer Focused Modular Wardrobes or read about our installation and after-sales support to see how a fitted joinery package is delivered on site.