A multi function tall cabinet looks simple on a drawing: one floor-to-ceiling box that carries appliances, linens, cleaning supplies and spare stock behind a single door line. On site it becomes the element that exposes every coordination mistake, because its dimensions are shared with plumbing, power, ventilation, appliance shells and the finishes of the rooms around it. Getting quantities right is less about counting units than about deciding, early, which functions each unit has to carry.
Why This Product Type Breaks Budgets Late
Tall storage sits at the junction of several trades. The cabinet encloses appliances that need air gaps and service access, it stands next to wet areas in many layouts, and its doors must clear handles, switches and adjacent openings. When a project orders these units as generic millwork and coordinates them after the fact, the corrections arrive as site cutting, filler strips, changed door swings and re-orders of doors that no longer match the rest of the joinery package.
Our Multi Function Tall Cabinets are made to measure for each project, with material and finish options and a layout set around the actual space. That flexibility only pays off if the quantity schedule is written down before production starts, unit by unit, with the function of each one defined.
Step 1: Count Units by Function, Not by Room
Start from a function list rather than a room plan. Walk the drawing and mark every place where tall storage is required, then label what that unit has to do:
- Appliance housing - washer, dryer, ovens or other built-in equipment that must sit inside the carcass.
- Linen and towel store - deep shelving for bulky textiles, usually near bathrooms or bedrooms.
- Utility store - brooms, buckets, detergents, tools; needs height clearance and often a holed base.
- Dry goods and bulk stock - pantry-style shelving for villa or service areas.
- Mixed open and closed storage - display niches plus concealed doors in the same elevation.
Two rooms may each need one unit, but if one of them also has to hide an appliance it is a different product with a different cost. Write the quantity as "3 appliance units + 4 linen units + 2 utility units", not "9 tall cabinets". This single change prevents most price surprises.
Step 2: Lock Appliance Data Before Ordering
Appliance-driven units are the ones that must be ordered last-minute-proof. For every cabinet that houses equipment, confirm before production:
- The exact appliance model and its shell dimensions, including door depth and handle projection.
- Whether appliances sit side by side or stacked, and which side the services fall on.
- Ventilation route and any clearance the equipment manufacturer requires.
- Electrical outlet, isolator and data positions, and who is responsible for moving them.
- Access panels or removable ends needed for future servicing.
Where the design calls for appliances fully recessed into the joinery, Santerson Integrated Appliance Tall Cabinets are configured around those dimensions, and appliance sizes, ventilation and electrical requirements are confirmed for each project before manufacture. If the appliance brand is not fixed yet, keep that unit's order separate from the rest of the package rather than letting it hold up everything else.
Step 3: Split the Schedule Into Clear Product Groups
Once functions are set, group the units so each line in your schedule maps to one product family. For a villa or apartment package this typically looks like:
| Function | Santerson product group | What fixes the quantity |
|---|---|---|
| Appliance housing, stacked or side-by-side | Integrated Appliance Tall Cabinets, Stacked Laundry Units | Number of laundry or appliance locations, one per location unless the elevation is split |
| Linen and textile store | Linen Cabinets | One per bathroom group or bedroom cluster, subject to wall length available |
| Utility and cleaning store | Utility Tall Cabinets | One per service zone, plus one for each floor level in multi-storey work |
| Display and open storage | Open Shelf Tall Cabinets, Glass Front Tall Cabinets | Length of display elevation, and how much of it should stay concealed |
| Tight or angled positions | Corner Tall Cabinets | Number of re-entrant corners that can carry storage without blocking circulation |
| Combined laundry and storage wall | Laundry and Storage Combo, Compact Laundry Solutions | One per laundry location where appliances and dry store share an elevation |
Grouping this way also protects the finish schedule. Open shelves, glass fronts and closed doors in the same room need to match on colour, grain direction and handle style; if they are ordered as one mixed line those details get decided by whoever quotes first.
Step 4: Set Quantities Against Real Wall Length
Tall units compete with everything else on the same wall. For each elevation, measure the run and subtract:
- Door openings, switches and any radiator or pipework boxing.
- The swing arc of adjacent doors and drawer fronts.
- Circulation width that must stay clear in a laundry or bathroom approach.
- Appliance service zones, where the door needs room to open fully.
Then decide whether each remaining position takes a single wide unit or two narrower units. Two narrower units usually travel and install more easily on site, but they add a vertical joint that shows in a run of matching doors. Where space is genuinely tight, a compact laundry layout or a corner unit recovers storage that a straight run would lose.
Step 5: Coordinate Finishes With the Rest of the Joinery
Tall cabinets rarely stand alone. They sit beside kitchen runs, vanities, wardrobes and wall panelling, and any mismatch reads as a defect. Before you release quantities, confirm for each product group:
- Panel material and surface finish, matched to the adjoining cabinetry package.
- Door profile - flat, framed or recessed - consistent across rooms of the same type.
- Handle style or integrated pull, including how tall doors are pulled at height.
- Internal configuration: shelf depths, drawer banks, hanging rails, hampers.
- Glass type and framing where display fronts are specified.
Where the utility wall also has to hold laundry baskets out of sight, Pull Out Laundry Hampers can be built into the same elevation, which is far cheaper than adding a separate piece of furniture later. The same logic applies to integrated lighting in display niches: specify it on the drawing while the carcass is being made.
Step 6: Build a Quantity Sheet That Survives Review
A usable schedule for this product type carries one row per unit, not one row per room. Each row should state:
- Location code and elevation reference from the drawings.
- Product group and function (appliance, linen, utility, display, corner).
- Finished width, height and depth, plus floor and ceiling build-up noted separately.
- Appliance model and service side, if applicable.
- Panel material, colour or grain, and door profile.
- Internal layout: shelves, drawers, rails, hampers, lighting.
- Fixing notes - wall type, whether the unit is packed into a recess, any anti-tip fixing.
Add a spare allowance only where it is genuinely needed: replaceable doors and shelf pins for high-use units in rental or hospitality work. Blindly multiplying every cabinet line by a percentage inflates cost without solving anything.
Common Quantity Mistakes
- Ordering all tall cabinets as one identical line, so appliance positions arrive without the required openings or ventilation.
- Counting a unit twice because it appears on both a furniture schedule and a bathroom fit-out schedule.
- Leaving out the corner and narrow-end units, which then get fabricated on site in mismatched material.
- Specifying glass-front display units in rooms where nobody will keep them tidy.
- Sending dimensions before floor finishes are decided, so full-height doors end up short or rubbing.
How a Single Supplier Makes the Coordination Easier
When tall cabinets, laundry integration, vanities and wardrobes come from one manufacturer, the finish schedule is checked once instead of three times, and units that share a wall ship together. That is how we work on villa and apartment packages: space planning and product specification first, then production with the confirmed dimensions and finishes, then freight to site and installation support. If you are assembling a schedule for a project, send us the elevations and the appliance list and we will return the product groups, quantities and configurations that fit them.
Before production starts on any made-to-measure tall cabinet, confirm the finished dimensions, the appliance data and the finish reference for every position on your schedule - those three decisions are what keep the quantity count, the price and the installation on the same page.