A wardrobe enquiry that starts with a drawing, a finish decision and a clear delivery address usually comes back with an accurate quotation. One that starts with a photograph and the words "about three metres wide" comes back with questions, then a second round of questions. If you are specifying glass hinged wardrobes for a villa, an apartment refurbishment or a hotel guest room floor, the preparation you do before the first message saves more time than any negotiation afterwards. Below is the practical checklist we work from on our own projects.

1. The opening dimensions, not just the nominal ones

Glass-fronted hinged doors are unforgiving of rough openings. Send the width, height and depth of each recess measured at three points across the span, and note which wall is out of plumb if one is. Then state what you intend the unit to occupy: floor-to-ceiling in a recess, a full wall with a scribe to an unlevel ceiling, or a freestanding run between two fixed points.

  • Overall external dimensions plus the internal clear dimension after plaster, skirting and cornice.
  • Floor finish build-up — tiled, engineered oak, carpet over underlay — because it changes where the base sits.
  • Ceiling condition: flat, sloped, beamed, or with a downlight or sprinkler head inside the wardrobe zone.
  • Obstruction list: switch plates, radiator tails, air-conditioning returns, door architraves that will swing into the front plane.

Hinged doors need clearance to open. Tell us the distance from each door line to the nearest obstacle so we can check handle projection and whether a corner unit should be hinged door corner wardrobes rather than two straight runs meeting at an angle.

2. Glass type, frame and the look you are actually specifying

"Glass wardrobe" covers several very different products, and price follows the construction rather than the size. Decide before you ask, or ask us to quote two options side by side:

ConstructionWhat it looks like on siteTypical use
Glass door panel in a timber-based carcassWarm frame, transparent or tinted frontMaster bedrooms, villa suites
Aluminium frame glass wardrobesThin metal outline, sharp shadow lineModern apartments, hotel rooms
Frosted or ribbed glass frontDiffused cover, contents hiddenShared bathrooms, guest rooms, utility runs
Bronze or smoked tinted glassReflective warmth, darker interiorLobby-adjacent suites, dark joinery schemes

Send the finish reference you are matching — a paint code, a veneer sample number, a photograph of an existing door in the same room. Where a scheme calls for something other than glass, the same hinged-door family covers flat panel hinged wardrobes and paneled designs, so we can keep door styles consistent across rooms while changing only the front.

3. Internal layout decided by how the wardrobe is used

The internal plan is where a made-to-measure unit earns its cost, and it is the part buyers most often leave open. Before contacting a supplier, walk through the actual storage:

  • Long-hang height for coats and dresses versus double-hang for shirts and trousers.
  • Drawer count and depth — shallow for accessories, deep for knitwear — and whether you want soft close throughout.
  • Shelving spans. Glass-fronted doors tempt long open shelves; keep spans reasonable or add dividers so boards do not sag under weight.
  • Lighting: door-activated, motion-sensor or a wired vertical run. If wiring is required, decide now, because the carcass needs the channel cut at production.
  • Special items to house: safe, trouser pull-out, ironing station, luggage shelf above the doors.

If the room is still in concept stage, our interior design services cover space layout planning and furniture layouts with 3D renderings, so you can review the elevation before anything goes into production.

4. Project context: quantities, dates and who signs off

A single wardrobe and a twelve-bedroom villa are quoted on different assumptions. Tell the supplier:

  • Number of units per type, and whether later phases repeat the same specification.
  • The date the room must be finished, working backwards from that to delivery and installation.
  • Site access: floor level, lift dimensions, stair width, parking for a truck, and any building management limits on delivery hours or noisy work.
  • Who approves the shop drawings — architect, builder, interior designer or owner — and how long approval usually takes.
  • What other trades are in the room, and which of them must finish before the wardrobes arrive.

For whole-property work it is often simpler to place joinery, doors, flooring and lighting with one supplier so the finishes and levels are coordinated once. That is how our turnkey solutions for villa and hospitality projects are organised, and it removes the arguments about who was responsible for a reveal that ended up 20 mm out.

5. Commercial details worth settling in the first message

These are the questions we ask back on almost every enquiry, so answering them early shortens the exchange:

  • Delivery terms you want — port, or delivered to the site door. Our logistics service covers freight by sea, air and rail with customs paperwork and door-to-door delivery.
  • Payment stages as you understand them, and whether your client contract has retention that affects your cash flow.
  • Whether you need samples: a glass swatch, a veneer offcut or a drawer-front prototype before the full run is approved.
  • Whether the units are for resale under your own brand. We handle OEM work and private labelling, so specify packaging and marking requirements up front.

6. What a good first enquiry looks like

Put it in one message: measured drawings or annotated photographs of each opening; the glass and frame option you prefer plus one alternative; the internal layout list; unit quantities and target completion date; delivery city and access notes; and the name of the person who approves drawings. A supplier working from that can return a specification sheet, an itemised price and a realistic production window in one pass instead of three.

If you are comparing suppliers, ask each one to quote the same construction and the same internal layout. Comparing a glass-fronted unit against a mirror-fronted one tells you nothing about value; comparing identical specifications tells you exactly where the difference in price sits.

Common questions before an enquiry

Can I order a single wardrobe, or is there a minimum?

Made-to-measure residential units are produced per project. Where minimum order quantities matter — for a development repeat or an OEM run — tell us the quantity you have in mind and we will confirm what applies to that specification.

I only have architect drawings, no site survey. Is that enough?

It is enough for a budget price and a first layout proposal. Final production dimensions should come from the completed shell, because finished floor levels and plaster depths shift recesses by more than glass tolerances allow.

What if my ceiling is not level?

Send a measurement of the variation across the run. We then design a scribe or a top panel so the door lines stay parallel to the floor rather than the ceiling, which is what makes a fitted wardrobe look built-in.

SANTERSON has been manufacturing furniture and building materials since 2008, with custom and OEM production coordinated through design, manufacturing, logistics, installation and after-sales support. Send your dimensions, finish references and quantities to the contact page and we will come back with a specification and an itemised quotation.