A sliding storage panel wall looks simple on a drawing: two or three panels glide across a recess and the room reads as a clean, finished surface. In production it is one of the less forgiving items in a joinery package, because the panel, the track, the opening and the surrounding finishes all have to agree with each other. Most rework on these walls comes from information that was never supplied, not from the manufacturing itself.
This guide sets out what to send the Santerson Sliding Storage Panels team before a quotation is requested, using the configuration options we actually work from: made-to-measure sizing, layout, and material and finish selection. The product sits in our Integrated Storage Walls range for residential wall system projects, so every dimension and surface is specified per project rather than chosen from a fixed size list.
Start With the Opening, Not the Panel
Send the opening as built or as intended on site, in millimetres, with height, width and depth recorded separately. Depth matters more than most buyers expect: it sets how much of the recess the track and the panel pocket can occupy, and a shallow recess may not accept the runners at all. Where the wall is being finished after the joinery is designed, say so explicitly and note which trade finishes which surface.
Along with the three dimensions, we need four practical facts:
- Whether the floor, ceiling and side walls are level and plumb, or whether scribes and packers will be needed on site.
- The exact finished floor level, so the bottom track sits at the right height once tiling or flooring is complete.
- What sits behind the wall - stud work, service runs, pipes or back boxes that a fixed panel would cover.
- Whether skirting, architraves or cornices are to be removed, cut back, or carried through the opening.
Decide What the Panels Are Hiding
Storage content drives the internal layout far more than the front elevation does. Tell us what each bay has to hold and how it will be used day to day:
- Hanging items, folded linen, books, glassware, appliances, or a mix - each needs different shelf heights and load support.
- Whether anything inside needs power, ventilation or access to a control panel.
- Whether the bay is used daily or seasonally, which changes how much of it should sit within easy reach.
- Whether you want open display niches alongside closed bays, so the wall reads as one system rather than two separate products bolted together.
Where the wall also has to carry a screen, look at Santerson Sliding Panel TV Systems instead of adapting a storage wall after the fact. A screen behind sliding panels changes the panel weight limits, the clearance for ventilation and heat, and how the cable route is built into the carcass - decisions that are cheap at drawing stage and expensive once panels are cut.
Specify the Track and the Motion
The mechanism is where an under-specified brief turns into a site problem. For each opening, confirm:
| Item to confirm | Why it changes the build |
|---|---|
| Number of panels and how they stack when open | Determines whether panels bypass each other on parallel tracks or share a single line, and how much depth the pocket needs. |
| Top-hung or floor-supported running | Affects threshold height, floor finish continuity and the load path into the structure. |
| Panel size and face material | Glass and stone-look faces weigh considerably more than timber-look faces; hardware is selected to match. |
| Opening frequency and users | A wall used several times a day in a family home needs different runners and stops from a display panel opened occasionally. |
| Soft close, handles or push-open | Fixes the edge detail and whether any handle is visible on a face that is meant to read as a plain surface. |
Our sliding panel listings are configurable rather than catalogued with fixed hardware, so track type, hardware and opening dimensions are confirmed per project. Send the intended use and we will propose the mechanism; send a preferred mechanism and we will price to it.
Fix the Finish Where Panels Meet Other Surfaces
Send finish decisions as samples, references or written specifications - not adjectives. "Oak" covers dozens of different veneers, and a colour name from another supplier's range will not match anything until a physical reference is compared. Useful detail includes:
- Substrate and face material for the panel, and whether the reverse face is finished to the same standard.
- Edge treatment, since sliding panels show their edges constantly in the open position.
- Grain direction across multiple panels, and whether the wall should read as continuous grain or as separate leaves.
- Which adjacent finishes must be matched - flooring, wall panelling, doors - and who is supplying them.
Related walls in the same house are worth coordinating in one brief. Santerson Full Height Storage Walls and closet sliding panels can share materials, finishes and ironmongery with the main living-area wall, which keeps the joinery consistent across levels and reduces the number of separate finish approvals.
Agree Tolerances, Sequencing and Access
Before manufacture, confirm in writing:
- Who verifies final dimensions on site after the first fix is complete, and at what point those verified dimensions are released to production.
- The build sequence: which trades finish the recess, when flooring is laid, and whether panels can be installed before or after that.
- Delivery route and access - lift sizes, stair widths, corridor turns and any maximum panel dimension for the largest single piece.
- Site conditions at handover, including storage for panels and protection during remaining works.
For projects outside China, our logistics and door-to-door delivery service covers freight forwarding, packaging and container loading, customs paperwork and shipment tracking. Panel dimensions need to work for the intended transport route as well as the stairwell, so send access constraints early rather than after production.
A Short Brief Checklist
Before you send an enquiry, confirm that these are attached or stated:
- Marked-up elevation with height, width and depth of each opening, in millimetres.
- Finished floor levels and which surfaces are already complete at installation.
- Storage content per bay, including anything needing power or ventilation.
- Panel count, stacking direction and how often the wall is opened.
- Finish references with physical samples or supplier codes, plus edge treatment.
- Matching items elsewhere in the project, so finishes are specified once.
- Access route, delivery address and any maximum single-piece dimension.
Common Gaps That Delay a Quotation
The drawing has no depth. Width and height alone cannot fix a track selection. Give the recess depth and the finished wall line.
Finish is described in words only. Send samples or codes; verbal descriptions are not sufficient for production approval.
Screen requirements arrive after the layout is set. A TV behind sliding panels changes ventilation, clearances and hardware, so raise it at first brief.
Site levels are assumed rather than measured. Where the wall is out of plumb, scribing allowances have to be designed in; otherwise the installed gap will be visible.
Send the opening dimensions, the storage brief and your finish references together, and a configurable sliding wall can be quoted and detailed in one pass. Materials, dimensions, hardware and finish performance are confirmed for each project configuration before manufacture, so anything you supply early is something you do not have to change later.