A door submittal is where a flush hinged door package either survives the approval round or goes back for another cycle of questions. For contractors and interior fit-out buyers specifying Santerson Flush Hinged Doors on a villa, apartment or hospitality project, the file needs to carry enough information for the designer, the main contractor and the site team to check the same door against the same drawing. Below is the package we prepare when a buyer asks us to price and produce these doors, item by item.
What a submittal has to prove
Flush hinged doors sit close to the finished wall face, so the visible result depends on details that are not part of the leaf itself: the frame build-up, the reveal, the hinge choice and how the door meets the surrounding wall or joinery. A submittal is therefore not a product brochure. It has to show three things: that the opening sizes match the drawings, that the finish matches the approved schedule, and that the hardware set can carry the leaf at the size being ordered.
Santerson Flush Hinged Doors is part of our Hinged Doors collection and is made to measure. Finish, layout and dimensions are specified per project, so nothing in the package below should be treated as a fixed catalogue standard. Confirm dimensions and selected specifications for each order before production starts.
1. Opening schedule and door sizes
Send the opening schedule from the architectural or joinery drawings, with each door tagged to a room or mark number. For every opening we need:
- Clear opening width and height, plus the finished floor level at that opening.
- Wall build-up and total wall thickness, including plasterboard layers, backing and any cladding or panelling.
- Whether the door is single or double leaf, and which way it swings and against which wall.
- Reveal detail, meaning how deep the frame sits back from the finished wall face on each side.
- Storey height and soffit condition where the door reaches close to the ceiling.
If your drawings show a full-height door that also carries panelling, our Santerson Flush Interior Doors range is usually the closer reference point, and integrated door and wall paneling should be shown on the same elevation rather than split across two trades.
2. Material and finish schedule
Material and finish are separate decisions and both belong in the submittal, with a sample reference for each. The doors in this range can be specified with different core and surface make-ups and with veneer or painted surfaces, so state which one applies to which door mark.
| Item | What to record in the submittal |
|---|---|
| Leaf core and substrate | Core type and panel make-up per door mark, as confirmed with our production team for the actual order. |
| Surface / finish | Veneer species and grade, or paint/lacquer colour reference. For veneered leaves see Santerson Wood Veneer Hinged Doors as the matching reference. |
| Frame and architrave treatment | Concealed frame detail, whether any architrave is required, and how the frame edge meets the wall finish. |
| Sample sign-off | Physical sample or approved swatch number, signed by the designer or client before production. |
Where a door is meant to disappear into a decorative wall, the submittal should also carry the adjacent panel specification. Santerson Decorative Concealed Doors and Flush Wall Aligned Doors are the pages to cite when the requirement is a wall-aligned or concealed detail rather than a standard hinged leaf.
3. Hardware set and swing details
Hardware is often the part left out of a door submittal, and it is the part that leads to site rework. For each door mark, list:
- Hinge type, count and finish, checked against the leaf size and weight we confirm for that size.
- Lock or latch case format and backset, plus handle and escutcheon style.
- Whether closers, seals or acoustic items are required, and if so, who supplies them.
- Gap tolerance at the hanging edge and lock edge, agreed with the wall finisher.
Where a standard hinged arrangement is acceptable rather than a flush detail, Standard Interior Hinged Doors may suit the lower-value openings on the same project, which keeps the budget concentrated on the doors that are actually visible from the main living spaces.
4. Drawings and production approval
Before cutting anything, we return shop drawings for each door mark: elevation with dimensions, hinge positions, frame section through the wall build-up, and the finish callout. The buyer or consultant signs these back. That signed drawing is what production works to, and it is also the reference used during site inspection.
Our project workflow runs through consultation, design and planning, production, logistics, installation and after-sales, with quotation and detail confirmation sitting between design and production. The submittal is the document that closes the detail-confirmation stage.
5. Packaging, delivery and site handling
- Packaging and protection method per leaf and per frame, with crate or carton marking tied to door mark numbers.
- Delivery address, Incoterms and the receiving contact at site or store.
- Storage conditions on site: flush leaves stored flat and dry, off the ground, until the wall finishes are complete.
- Sequence of works: frame installation, wall closing, then leaf hanging, so the reveal is not disturbed by later trades.
What we send back, and what we need from you
Send drawings, opening sizes and finish references, and we return a quotation with the specification built around your project rather than an off-the-shelf size range. Doors can be produced as part of a wider package that includes cabinetry, panelling and other interior fixtures, which is how most villa and hospitality buyers specify them: one supplier coordinating the joinery, doors and finishes through turnkey project solutions instead of six separate purchase orders.