A product submittal is the package a buyer, contractor or designer sends to the architect or client for approval before a wardrobe order goes into production. For a made-to-measure item such as our Rustic Solid Wood Wardrobes, the submittal is where dimension disputes, finish misunderstandings and door-swing clashes get settled on paper instead of on site. Below is the checklist we work to when preparing a submittal for a residential wardrobe package.
1. Drawings: overall, elevation and interior
Shop drawings are the core of the submittal. For each wardrobe we supply three levels of drawing so that the reviewer does not have to guess what sits behind a door.
- Overall plan and setting-out drawing -- where the unit sits in the room, its run length, its depth, and how it relates to skirting, cornices, doors, switches and any adjoining joinery.
- Elevation drawings -- every face, showing door layout, panel profile, handle position and reveal lines. Rustic and other solid-timber styles rely on moulded or raised panels, so the elevation should show the profile of the moulding, not just a flat rectangle.
- Interior layout drawings -- hanging rails, shelves, drawers, trouser pull-outs, lighting provision and any dedicated space for long garments or luggage, with heights marked.
Mark the finished floor level on every elevation. A wardrobe ordered against a structural slab drawing rather than a finished floor level is one of the most common causes of a unit that will not seat properly on site.
2. Dimension sheet and tolerance record
Our solid wood wardrobes are made to measure, so the submittal should carry a dimension table rather than a single nominal size. For each unit list:
- width, height and depth as manufactured, and the opening or wall-to-wall measurement they correspond to;
- which faces are scribed or filled to take up out-of-plumb walls and out-of-level floors;
- clearances needed for doors, drawers and any sliding track;
- the date, method and person responsible for the site re-measure that fixes those numbers.
3. Material and finish schedule
"Solid wood" covers several very different specifications, so the submittal should separate what is timber from what is engineered board. We state the construction in plain terms: which components are solid timber, which use a substrate with a timber veneer or laminate face, and which edge treatments apply. For the finish, provide a schedule covering:
- species and cut for the visible solid components;
- stain, lacquer or oil system, and sheen level (matte, satin or gloss);
- the approved colour reference -- a physical sample number, not a screen value;
- grain character and distressing level for rustic work, since knots, mineral marks and saw marks are features that need to be agreed in advance rather than discovered at delivery.
Where the design intent calls for a different species in the same house, we produce the matching units together so that grain and finish sit consistently across the bedroom range -- Walnut Solid Wood Wardrobes and Oak Solid Wood Wardrobes are the two we most often pair with a rustic scheme.
4. Hardware, ironmongery and moving parts
Hardware is where a submittal usually gets returned for comment, because it is specified by several parties at once. Include make, model and load rating for hinges, slides, handles, soft-close mechanisms and any wardrobe lighting; state the opening angle of each hinge against adjacent walls and furniture; and confirm the fixing method into the carcass. If the client has their own ironmongery supplier, note which items are supplied by us and which are site-supplied, and who is responsible for matching them.
5. Sample board and mock-up
Attach a sample board to the submittal: a solid-timber offcut in the specified finish, a veneered or laminated sample of the same finish, one door panel showing the full moulding profile, and a hardware sample. For rustic finishes we recommend approving a single mock-up door before the full set is machined, so that distressing intensity and stain depth are signed off while changes are still cheap.
6. Packaging, delivery and installation information
Built-in wardrobes travel long distances on most of our projects, so the submittal should also tell the site team what will arrive and how it will be handled. We include the packing method and carton schedule, the container or pallet count, crate protection for panel goods, delivery route notes, and the sequence of installation with the trades that come before it -- flooring, painting, electrical first-fit and air-conditioning grilles.
Because these units are part of a wider fit-out, buyers coordinating several trades often handle them through Turnkey Interior Project Solutions, which keeps joinery, wall finishes, flooring and lighting under one procurement package instead of several.
7. Approvals, warranties and after-sales records
Close the submittal with the administrative items that protect both sides: the revision number and date of every drawing, the name of the approving party for each section, the production lead time as measured from approval rather than from enquiry, and the scope of warranty and spare-parts support. If any item is still open -- a handle choice, a light position -- list it as an open point with an owner and a date, so that "approved with exceptions" does not quietly become "not approved".
What the submittal should not contain
Three things cause more rework than anything else in a wardrobe submittal: dimensions taken from architectural drawings without a site re-measure; finish descriptions written as adjectives ("warm oak tone") instead of sample references; and performance or compliance claims that the product documentation does not actually support. Where a project has local code or certification requirements, state the requirement and let the reviewer confirm compliance rather than asserting it in the submittal.
Send us your drawings and we will return a complete submittal package.
Share the room layout, preferred species and finish, and interior storage requirements. Our team prepares the drawing set, dimension sheet, finish schedule and sample board for your review before anything enters production -- see the full Built-in Furniture range, or tell us the room dimensions to start a wardrobe package.