A drawer unit looks like the easiest line item on a bathroom schedule. It is the one that causes the most rework, because it sits between the vanity, the basin cut-out, the wall finish and the floor threshold, and every one of those has to agree with it. Below is the checklist we use when a buyer specifies Santerson Drawer Units for a villa or apartment package, in the order the questions actually come up.

1. The opening, not the catalogue size

Every Santerson storage piece is built to the dimensions you send, so the first item on the list is a set of finished-face measurements, not rough-shell ones. Specify the floor-to-soffit height at three points along the wall, the width between finished wall faces, and how far the unit must project past the tile line. Note anything that intrudes into the opening: pipework, an isolation valve, a recessed box, a skirting return, or a door that swings into the run.

Send the drawings you are working from rather than a description in an email. A marked-up plan and one elevation with dimensions is enough to start; it lets us check the unit against the vanity beside it instead of guessing.

2. Where the drawer bank sits relative to the basin

Drawer depth, basin type and tap choice collide quickly. A wall-hung basin with exposed pipework needs clearance behind the carcase; a vanity-top arrangement needs the top drawer set below the basin spigot; an undermount basin needs the cut-out position fixed before the top is made. Confirm which of these applies to each bathroom before the unit goes into production.

The same question decides whether you want a bank of shallow drawers, one deep box with internal trays, or a mix. Towels and linen need depth; cosmetics and medicine cabinets do not.

3. Storage layout for the rest of the room

Drawer units rarely stand alone. Decide the whole storage set at once so the doors, drawer fronts and reveals match across the room:

One specification sheet covering all of them keeps finish, edge profile and hardware consistent across the property.

4. Carcase, front and surface finish

State the panel material, the surface system and the colour reference for both the carcase and the visible fronts. Bathroom joinery sees humidity, cleaning agents and frequent handling, so we match the board and finish to that duty rather than picking whatever looks right in a render. Send a physical sample approval before bulk production if the project has a defined interior palette; a colour code alone is not enough for a woodgrain or textured surface.

Decide at the same time how the fronts read: handleless, integrated pull, or surface-mounted handle. That choice affects drawer front thickness and the clearance each box needs to open.

5. Hardware and moving parts

Hardware is where a specification gets vague and the price then moves. Fix these before order confirmation:

  • Runner type and load rating, soft-close or push-to-open, full extension or partial
  • Hinges and their opening angle where the unit sits in a tight passage
  • Adjustable shelves behind doors, and their span across the carcase width
  • Feet, plinth or a recessed base, and how each meets the finished floor level
  • Spare runners and hinges shipped with the order for handover maintenance

6. Surfaces, taps and electrical items that touch the unit

Anything that lands on or inside the drawer unit has to be specified together with it: Santerson Stone & Marble Surfaces and Santerson Undermount Basin where the top is continuous with a basin cut-out; Santerson Integrated Cabinet Lighting, Vanity Lighting and Santerson Towel Warmers & Rails where cables have to be routed through the carcase. Electrical ratings, cable exits and any transformer position should be shown on the shop drawing before manufacture.

If the same supplier also handles the kitchen

Bathroom joinery and Custom Built-in Kitchen Cabinets - Interior Fixtures for Hotel & Apartment Projects usually share materials, edge banding and hardware on a project package. Ordering them together reduces the number of samples to approve and keeps door styles consistent between rooms.

7. Site conditions and fixing method

Tell us what the unit is fixing to. Stud wall, brick, or a tiled surface changes the bracket and anchor set, and a wall-hung configuration needs a confirmed load path and blocking position before tiles go on. Record finished floor levels, waterproofing upstands and threshold heights so the base detail can be drawn correctly.

8. Quantities, spares and the schedule

Give quantities per bathroom type rather than one total for the building, and group identical configurations under one code. That way a variation on Bathroom Type B does not force every unit to be redrawn. List the items you want held as spares — runners, hinges, keys, a matching filler panel — and state the delivery address, elevator access, and the room-by-room sequence you need.

9. The paperwork that closes the specification

Before production starts, both sides should hold the same signed document set: approved shop drawings with dimensions and elevations, a finish schedule with sample references, a hardware schedule, an electrical routing note where relevant, and a packing list keyed to the room codes. Assembled or flat-packed is a decision worth recording too — lift sizes and stair access decide it more often than preference does.

10. Handover and after care

Close the checklist with what happens on site: installation or fixing guidance, an inspection against the shop drawing, a snag list, and the contact route for replacement parts later. We work as a one-stop project furnishing supplier, so the same team that made the units handles the drawings, the freight documents and the follow-up on adjustments.

A short version for your specification sheet

  • Finished-face dimensions at three heights, plus obstructions in the opening
  • Basin type, tap reach and clearance behind the carcase
  • Storage layout for the whole room, with matching fronts
  • Panel material, surface system, colour or grain sample reference
  • Runner, hinge and shelf schedule, including spares
  • Countertop, basin cut-out, lighting and cable routes
  • Wall construction, fixing method and finished floor levels
  • Quantities by bathroom type, room codes, delivery sequence
  • Signed drawings, finish schedule, packing list
  • Installation guidance, inspection and spare-parts contact

Configurations are made per project. Dimensions, material combinations, hardware selections and electrical specifications are confirmed with the buyer on the shop drawing for each unit before manufacture.

Send your bathroom schedule or marked-up drawings and we will price the drawer units against it.