A quotation for wooden sliding panels can look complete and still leave the parts that matter most undefined. Panel thickness appears in one line, the track appears in another, and nothing states who measures the opening or who resolves a wall that is out of plumb on site. When two proposals for the same wall carry prices that differ by a wide margin, the difference is usually hidden inside the specification rather than in the timber. The checklist below follows the order in which decisions actually get locked in, so you can compare offers line by line and identify what each supplier has left out.

Start With the Wall System, Not the Panel Face

Sliding panels are a system of five interfaces, and cost accumulates at each one. The visible face is only the last of them. Before you read a price, confirm that the proposal describes all five:

  • The opening. Clear width and clear height, plus the depth available for the panels to stack. A recess behaves differently from a face-fixed run that overlaps a wall.
  • The substructure. Whether the track hangs from a structural header, a timber batten, or an existing ceiling lining, and who installs that support.
  • The panel construction. A solid core, a framed panel, or a lightweight honeycomb core changes weight, edge detail, sound behaviour and price.
  • The running gear. Track profile, hangers, floor guide or no floor guide, and the load rating of each item against the finished panel weight.
  • The finish. Veneer, lacquer, laminate or paint, including how edges and reveals are closed and whether the reverse face is finished to the same standard.

A proposal that names only a panel size and a finish has priced four unknowns. Ask for each interface in writing; suppliers who build these systems routinely answer without difficulty, and those who cannot are usually subcontracting the hardware to a third party.

Read the Specification Line by Line

Most disputes after delivery trace back to three lines on the quotation. Work through them in this order.

1. Dimensions: who measured, and what the numbers mean

Establish whether the quoted dimensions are design dimensions or site-measured dimensions, and whose responsibility the measurement is. Made-to-measure panel work only holds if one party owns the survey. Ask the supplier to state the finished opening size they have designed to, the tolerance they expect on site, and what happens if the as-built opening differs. A short sentence covering this prevents a re-order at the buyer's cost.

2. Materials: core, substrate and face are three separate items

"Wooden sliding panel" covers several constructions. Request the core material, the substrate behind the visible face, the face material and species, and the finish system by name. Where a veneer is quoted, ask how the grain is matched across adjacent panels and whether the sequence is numbered for installation. These details explain why two panels of identical size can carry very different prices.

3. Hardware: model numbers, not categories

Ask for the track profile, hanger model and load rating as model numbers, together with the maximum panel weight each is rated for. Then check the quoted finished panel weight against that rating. Undersized hangers are the most common failure in long runs of tall panels, and the symptom appears only after months of use.

Match the System to Its Job

The same wall mechanism serves very different purposes, and the specification should change with the purpose. The table below shows what a proposal should commit to for each common application.

ApplicationWhat the proposal must specify
Closet and wardrobe frontsPanel travel and stacking side, interior access clearance, handle or pull detail, ventilation to the storage behind, floor guide or top-hung arrangement.
Room-dividing partitionsPanel height and stability at full extension, track support detail, edge closure between panels, whether acoustic performance is claimed and how it is evidenced.
Media and TV wall panelsPanel stack position relative to the screen, cable routes and access openings, heat clearance from equipment, how fixings are concealed behind the panel.
Textured decorative frontsHow the texture is produced and sealed, how panels are aligned so relief reads continuously, cleaning method, protection during site works.
Acoustic sliding panelsTest evidence for any sound-reduction figure, perimeter seals, panel mass, and the weakness created by the track gap.

Where a wall combines several roles — a media wall that also closes a storage run — expect one supplier to own the whole assembly. Splitting panels, track and finishing trades across separate packages is where alignment and warranty problems begin.

Test Any Performance Claim Against Evidence

Three claims recur in panel proposals, and each has a simple test:

  • Sound reduction. Ask which standard the figure comes from, whether it was measured on a complete installed wall or on a sample panel, and how perimeter and track seals are included. A laboratory number without seals does not describe your wall.
  • Moisture and bathroom use. Ask what core and edge sealing the supplier uses where humidity rises, and which failure modes they exclude. If the answer is vague, keep timber fronts out of wet zones.
  • Fire performance. Ask for a test report naming the exact build quoted, not a generic board data sheet. A rating for the raw panel is not a rating for the installed system.

For projects with regulatory requirements, have the specifier confirm that the quoted build satisfies the project's own documentation. Manufacturer marketing material is not evidence of compliance in your jurisdiction.

Check What Sits Around the Panels

Panel work fails at its junctions far more often than in the field of the panel. Before award, confirm on the drawings:

  • How the head and jamb reveals are closed, and which trade supplies them.
  • The finished floor level, and whether a floor guide or recessed track is set out around it.
  • Floor flatness tolerance over the run, since a track installed out of level loads some hangers more than others.
  • Where skirting, architrave and adjacent wall finishes stop, so the panel can travel unobstructed.
  • Whether services are fixed to the panels at all, and what load is permitted if they are.

Compare Commercial Terms on Equal Footing

Price comparison only works once every offer covers the same boundary of supply. Set out a simple grid before you request quotations, and require each supplier to complete it:

  • Scope of supply. Panels, track, hardware, ironmongery, reveals, packaging.
  • Measurement and drawings. Who surveys, who issues shop drawings, how many revision rounds are included, and what approval triggers manufacture.
  • Packaging and transport. Panel protection method, container or crate arrangement, freight mode, insurance, delivery address and unloading responsibility.
  • Installation. Supplied-by-others fixing, supplier's own installers, or installer guidance with the supplier attending for setting-out only.
  • Spares and after-sales. Replacement hangers and guides, lead time on a re-order, and what the warranty covers once panels are on site.
  • Lead time measured from which milestone. From order, or from drawing approval. These two dates often sit weeks apart.

A supplier who can take responsibility for measurement, manufacture, delivery and installation removes the handover gaps where panel jobs go wrong. Where an overseas manufacturer handles the full run, ask how site queries are raised and answered during production, and confirm who signs off shop drawings before cutting begins.

Working with a one-stop supplier. When sliding panels are ordered alongside other joinery, wall panelling and doors from the same manufacturer, junctions and finishes are coordinated by one production team instead of three. SANTERSON's built-in furniture range covers sliding panel systems together with wardrobes, media walls and panelling, and the company's custom and OEM service covers made-to-measure sizing, material and finish selection, and project-specific layouts. Confirm dimensions, materials, hardware and any performance requirement for your own project before ordering.

Questions Worth Asking Before You Sign

Why do two quotations for the same panel size differ so much in price?

Usually the core construction, the face material and grade, and the hardware brand. Compare core, substrate, face species and grade, finish system, and hanger model before comparing totals.

Should the track be top-hung or floor-guided?

Top-hung runs avoid a floor track that collects debris and interrupts floor finishes, but they depend on a header that can carry the full panel load. Floor-guided arrangements suit tall or heavy panels where lateral stability matters. Ask the supplier to state which they have designed for your opening and why.

How many panels in a run is too many?

It depends on panel weight, stacking space and how often the wall moves. Ask for the number of panels, the stack width when open, and the travel path shown on a drawing rather than accepting a count in a price line.

What should arrive with the panels?

Fixing and setting-out drawings, numbered panel sequence, hardware packed with its load ratings, and written installation guidance. Ask for these before dispatch, since they determine whether your own installers can proceed without a site query.

A Short Scoring Sheet

Score each proposal from zero to two on the items that decide performance: opening measured and owned by one party; core, substrate and face stated separately; hardware by model number with load ratings; drawings issued before manufacture; junctions and floor levels resolved on paper; performance claims backed by test evidence for the quoted build; packaging, delivery and installation scope written out; spares and re-order terms defined. A proposal scoring below half of that total is not comparable to a competitor's, and signing it means accepting the gaps as your own risk.