A mirrored hinged wardrobe looks simple on a drawing: two or three doors, a mirror panel, a hanging rail inside. On site it is one of the easiest built-ins to get wrong, because the door swing, the wall condition behind it and the ceiling height all have to agree before production starts. The details below are the ones we check first on residential wardrobe projects, and they are the same details our buyers should send with their enquiry.

Start With the Door Swing, Not the Mirror

Hinged doors need clear space in front of them. Before choosing a width for each door, mark the swing arc on the floor plan and check it against the bed, the nightstand, the opposite wall and any en-suite entry. A door that hits a wardrobe handle or blocks a doorway by fifteen centimetres is unusable every morning, and no finish choice fixes it.

Where the walkway in front of the wardrobe is tight, narrow doors are usually better than wide ones, because each swing travels less distance. Where the room layout genuinely cannot take an arc, a sliding or open system from the same bedroom fit-out may be the practical answer, and it is worth comparing both before the drawing is signed off.

Confirm the Ceiling and Wall Condition by Site Measure

Made-to-measure sizing only works if the measurement is taken at the right moment. For a floor-to-ceiling run, we need the finished floor level, the finished ceiling level and the position of any cornice, skirting, air-conditioning grille or downlight that cuts into the wardrobe envelope. Old walls and renovated villas are rarely square, so out-of-plumb verticals and uneven floors should be recorded rather than averaged out; a single average dimension across a four-metre run will leave visible gaps at one end.

Mirror panels carry more weight than a plain door leaf, so the fixing method depends on what is behind the finish line. Plasterboard, brick and framed partition walls each need different anchors and backing. Send us the wall build-up with your dimensions, and we will confirm the fixing detail for that condition instead of assuming one.

Decide How Much Mirror You Actually Want

A full-height mirror on every door brightens a small bedroom and removes the need for a standing mirror, but it also reflects the bed and the window straight back at you. Many project owners mix surfaces instead: mirrored outer doors, solid or glass-fronted centre doors. That keeps the reflection where it is useful and lets the cabinet front match the rest of the joinery.

If other rooms in the same scheme use glazed fronts, our Glass Hinged Wardrobes and Frosted Glass Wardrobes can be specified in matching carcass dimensions and hardware, so the bedroom, dressing room and hallway read as one set rather than three separate purchases.

Match the Carcass Finish to the Rest of the Joinery

Mirror is the fixed element in this product; the carcass, drawer fronts and interior fittings are where the project detail matters. Send the finish reference you are already using for Classic Wooden Hinged Wardrobes, kitchen cabinetry or wall panelling, and we will match the wardrobe carcass to it. For a run that turns into an alcove or bay window, Hinged Door Corner Wardrobes handle the return, where the corner shelf and door post need to be drawn together.

Interior layout is a separate decision from the front elevation. Hanging lengths, drawer blocks, shelves for folded linen, a pull-out tray and lighting inside the cabinet are all set from the client's storage list, not from a standard module. Our Mirrored Hinged Wardrobes are built to project-specific dimensions with material and finish options, so the interior can follow the storage list without changing the door elevation.

Settle Hardware, Safety and Handover Before Production

Hinges on a mirrored door carry both the leaf and the glass, so hinge grade, the number of hinges per door and the closing action should be confirmed with the door size. Handle style affects clearance as well: a protruding pull reduces the usable gap beside an open door, while an integrated edge pull does not.

For family bedrooms and hospitality rooms, ask for safety-backed mirror glass and confirm edge finishing at the reveal. These are specification items we agree in writing with the buyer before manufacture, together with the final dimensions, so nothing is decided on site by whoever arrives with the wardrobe.

What to send with your enquiry

  • Room drawing or photos with finished floor and ceiling levels marked
  • Run length, depth and any obstruction such as cornice, grille or skirting
  • Wall build-up behind the wardrobe position
  • Number of doors, preferred mirror layout and handle style
  • Interior storage list: hanging lengths, drawers, shelves, lighting
  • Finish reference used elsewhere in the project joinery
  • Delivery address, access route and installation date

Send those details and we can return a wardrobe specification that fits the opening rather than an approximation of it. As a China-based manufacturer of furniture and building materials, SANTERSON handles made-to-measure built-in wardrobes alongside cabinetry, doors, wall panelling, lighting and flooring for villa and hospitality projects, with production coordination, door-to-door delivery and on-site installation support through the same project contact.

Talk to us about your wardrobe package

Email your drawings and room dimensions to SANTERSON, or contact PHILLIP on +86-13928214007. We review the project details first, then confirm dimensions, finishes and hardware with you before production begins.