Corner open shelving looks simple on a drawing: two runs of shelf meeting in an angle, no doors, nothing to hinge. In production it is one of the less forgiving items in a bathroom or living-area fit-out, because the corner dimension, the wall build-up and the load path all have to agree before a single panel is cut. At SANTERSON these units are made to measure for each project, so the quality of your enquiry drawing decides how fast an accurate price comes back — and whether the unit you receive actually fits the reveal it was quoted for.
The list below is the same brief our production team works from. Send it in one pass and you normally get a usable quotation without three rounds of clarifying emails.
1. The corner itself: which angle, and where it starts
"Corner" is not one dimension. Tell us the internal angle of the wall (90 degrees is the default assumption; a 45-degree bay or an obtuse recess changes the carcass geometry), and mark where each run begins — from the finished wall face, from a fixed datum such as a door frame, or from a plumbing wall. Give both clear runs, not just overall widths, because pipework, boxing and tiles usually eat into one of them.
If the unit wraps around a structural column instead of a wall angle, say so plainly. A column build has two returns that must be scribed, and it is quoted differently from a true corner.
2. Size: height, depth and how the unit is supported
Send overall height, shelf-run length for each leg, and shelf depth. Then state how the shelving is carried — fixed to a masonry or stud wall, hung as floating shelves with concealed brackets, standing on legs, or built into a recess. Support type drives both the fixing detail and the price: a long unsupported span needs a thicker shelf or an intermediate bracket, and we would rather flag that at quotation stage than in a site email two weeks before handover.
Where the wall is tiled, give the finished-face dimension after tiles, plus the substrate behind them. Stud walls with 12 mm boarding need noggins at the bracket line; we will ask for that detail if it is missing.
3. What the shelves have to carry
Open shelving in a bathroom and open shelving displaying objects are different structural problems. Tell us the intended use: towels and toiletries, glass bottles and heavy ceramics, or display pieces. Depth and span follow from that answer. For heavier loading we can propose metal frame shelves with a steel support structure rather than an all-panel build, and the quotation reflects that choice.
4. Materials, finish and how it must match the rest of the joinery
Our corner open shelving is configurable in material and finish, and it rarely sits alone — it reads against vanities, wardrobes or tall cabinets in the same room. So we need one of three things: a finish code you have already approved on another item, a physical sample reference, or a decision to match an existing installed element. "Similar to the wardrobe" is not quotable; a laminate code, a lacquer colour number, a veneer species with grain direction, or a metal finish (brushed brass, powder-coated black, anodised) is.
Also state edge detail — square, eased or bullnosed — and whether shelf undersides are finished or concealed, since unfinished faces are cheaper and often invisible once installed.
5. Interfaces you should flag now, not later
- Mirrors, cabinet doors or a lit cabinet that must sit against the shelving, with their opening direction.
- Recessed niches in the same wall — niche shelving set into tiled walls needs the tile setting-out drawing, not just a rough opening.
- Lighting: strip lights under shelves, recessed fittings in a valance, or a switched point. Send the electrical layout so we can allow for wiring routes and drivers.
- Mirror or glass shelf options, splashback edges, and any silicone or shadow-gap detail your designer expects.
- Adjacent doors, drawers and handles that need clearance to swing past the shelf ends.
6. Drawings, quantities and site conditions
A marked-up elevation or a screenshot from your design file is enough for a first price; a dimensioned CAD drawing lets us quote production-ready. For multi-unit projects — a villa with several bathrooms, or an apartment block — give a schedule: unit type, quantity per type, floor or room reference. Identical corners repeated across units are priced differently from one-off bespoke angles.
Site conditions matter more than buyers expect for made-to-measure work. Tell us the country and city of delivery, whether the walls are in a completed wet area or still open to trade, floor level tolerances, lift or stair access for long shelf runs, and your required on-site date rather than only a nominal lead time.
7. What you receive back from SANTERSON
With the above in hand we return an itemised quotation covering carcass, shelves, brackets and fixings, plus the finish specification, so you can compare it line by line against other suppliers rather than accepting a single lump figure. If a dimension is unresolved, we list it as an assumption on the quotation instead of quietly pricing one option.
Because shelving usually travels with vanities, tall cabinets and wardrobes, most buyers group it into a wider package. Our one-stop furniture and building materials supply covers that scope — joinery, sanitary fixtures, lighting, wall and floor finishes — under one production and shipping plan, which removes the risk of a shelving supplier and a vanity supplier arguing about who owns the corner.
Common questions
Can you match shelving to wardrobes supplied by someone else?
We can match where we have a physical sample, an approved finish code, or the original supplier's material specification. Colour photographs on site are not reliable for lacquer and veneer matching, so plan for a sample check before production sign-off.
What if the corner is not square?
Send the measured angle and both run lengths. Older properties frequently sit off 90 degrees; scribing to a measured angle is normal work, but it has to be on the drawing before panels are cut.
Is glass shelving available?
Glass shelf options form part of the wider open shelving range and are quoted with the supporting frame and fixings. Specify the loading and span, since glass changes both the bracket design and the safety specification.
Contact PHILLIP — Phone / WhatsApp +86-13928214007 · Email santerson@qq.com · Enquiries: santerson.com/contact
Showroom-to-site support includes custom and OEM manufacturing, door-to-door delivery and installation coordination.