Why Wardrobe Specifications Start With Numbers, Not Samples
A walnut veneer wardrobe is one of the few items in a villa or hotel guest room that has to fit a rough opening exactly, hang level on an uneven slab and still read as a designed surface rather than fitted furniture. That is why our project team asks buyers for drawings and dimensions before quoting, not after. This guide sets out the measurements and the project inputs we need from architects, builders and procurement teams so a Walnut Veneer Wardrobes package can be detailed, manufactured and delivered without rework on site.
The Measurements We Need for the Opening
Send dimensions taken at three heights and three widths of the opening, plus the floor-to-ceiling height in the same reference plane. Veneer doors are flat panel products; a variance of a few millimetres across a two-metre run shows up as an uneven reveal along the whole elevation.
| Input | What to record | Why it matters |
|---|---|---|
| Width and height at three points | Narrowest and widest, lowest and highest reading, in millimetres | Sets the carcass size and how much scribe or filler panel is required |
| Depth of the recess | Clear depth to the finished wall face, including any skirting or cornice | Determines whether the wardrobe sits flush, proud or recessed |
| Floor and ceiling finish build-up | What is being laid or boarded, and at what thickness | Tells us whether to allow for a plinth, a top filler or floor-to-ceiling panels |
| Door swing clearance | Distance to the nearest wall, bed, door handle or bathroom entry | Decides hinged, sliding or open configuration in tight rooms |
| Services on the wall | Pipework, trunking, switches, downlights, underfloor heating zones | Carcasses need notching or a set-back where fixings cannot be drilled |
Layout Inputs That Shape the Interior
The internal layout is where buyer behaviour shows up in the drawing. Tell us who uses the room and how many changes are stored per person, then we place hanging rails, drawers and shelving around that pattern instead of filling the box evenly.
- Hanging heights: short-garment rail plus long-garment rail, or a double-hang arrangement for guest rooms where space is limited.
- Drawer count and depth: deep drawers for folded knitwear, shallow drawers for accessories, or a Drawer Focused Modular Wardrobes layout when the client stores mostly folded clothing.
- Open versus closed storage: open display bays need a dust plan and lighting; closed doors hide clutter but need clearance to operate.
- Corner handling: an angled or L Shaped Corner Wardrobes run keeps both walls usable, but the return needs a clear access dimension.
- Walk-in arrangements: for larger bedrooms and suites, an Island Walk in Wardrobes or perimeter run changes the aisle width requirement, so we check circulation before fixing the layout.
Finish and Material Inputs
Wood veneer is a thin cut of real wood over an engineered substrate, so grain direction, board matching and sheen all need to be agreed on paper before production. For the walnut family in our built-in furniture range we confirm:
- Grain run: vertical or horizontal grain, and whether doors are book-matched, slip-matched or laid in a random sequence.
- Sheen: a Matte Finish Veneer Wardrobes surface hides fingerprints and reflections in a bright bedroom, while a High Gloss Veneer Wardrobes front opens up a narrow corridor. Both are available in the veneer collection.
- Tone range: walnut boards vary between batches. Approve a physical sample against the joinery drawing, and keep that signed sample for the delivery inspection.
- Adjacent surfaces: send the specified flooring, wall panel and door finishes so the veneer tone is matched to the whole room, not judged on its own. Our Light European Oak Engineered Wood Flooring and darker oak options are commonly specified alongside walnut cabinetry.
- Edge and handle detail: edge banding material, handleless groove or applied pull, and whether the carcass edges are visible.
Project Inputs Beyond the Wardrobe Itself
Wardrobes arrive inside a programme. These inputs decide how we package, sequence and ship them:
- Room schedule or unit mix: for apartment blocks and hotel floors, send the room-by-room schedule so identical layouts repeat correctly across units.
- Delivery address and site access: floor level, lift dimensions, stair width and any crane requirement. A two-metre panel that clears a drawing will not always clear a service lift.
- Phasing: which floors or villas are first to be handed over, so production can be released in batches.
- Site trade sequence: who sets out the walls, who lays the floor and who connects lighting. Veneer units go in after wet trades and finishes are complete.
- Inspection standard: the snag list and tolerance standard your site applies, so our inspection before packing uses the same benchmark.
Send a marked-up floor plan, three elevation views of each wardrobe wall with dimensions, and the room schedule. That single package is usually enough for us to return a detailed quotation with layout, material and configuration options for your approval.
How These Inputs Move Through Our Process
The information above feeds directly into the workflow we run for villa and hospitality projects: design consultation and space planning, material selection and product specification, manufacturing with quality control, then project management and site coordination through to installation and handover. Where a client has their own drawing set, our Custom & OEM Service covers bespoke finishes, textures and prototyping against that set. Where there is no drawing yet, our Interior Design Services team develops layout options and 3D renderings for approval before anything enters production.
Because the wardrobes ship internationally, packaging and container loading are planned around the same drawings. Our Logistics & Door-to-Door Delivery team handles freight forwarding by sea, air or rail, along with the commercial paperwork, and our Installation & After-sales Support service covers on-site fitting, inspection and snagging. Terms, duties, transit routing and site support are agreed per project, so we confirm them with your commercial team rather than assuming a standard package.
A Pre-Order Checklist
- Opening width, height and depth measured at three points each, in millimetres, from the finished surfaces.
- Floor and ceiling build-up confirmed, with a note on which trade completes it.
- Door type selected against real swing or slide clearance in the room.
- Internal layout agreed per user pattern: hanging, drawers, shelving, open bays.
- Veneer sample signed off for tone, grain run and sheen, and kept for delivery inspection.
- Adjacent finishes sent for colour matching: flooring, wall panels, doors, lighting temperature.
- Room schedule, delivery address, lift and access constraints, and handover phasing supplied.
- Snag standard and inspection benchmark stated in the purchase documentation.
Common Specification Questions
Can we order to a standard size instead of made-to-measure?
Standard modules work for storage walls in a utility area. For a bedroom elevation that runs floor to ceiling and meets two walls, made-to-measure sizing is what keeps the reveals even; the veneer collection is detailed to project dimensions.
What if our ceilings are not level?
Record the highest and lowest reading. We then design a scribe or top filler panel on the drawing so the installer packs to the ceiling line rather than cutting the carcass on site.
How do we keep tone consistent across many guest rooms?
Specify one board batch for the whole floor, approve a signed sample, and release production in the same run. Splitting an order across batches is where tonal variation usually starts.
Do you supply wardrobes with other fit-out items on one delivery?
Yes. Cabinetry, vanities, doors, wall panelling, lighting and flooring are consolidated for villa and hotel projects under our Turnkey Solutions, which reduces the number of deliveries your site has to receive.
Send Us Your Drawings
If you have a plan, an elevation or just a room dimension and a photograph, send it over. Our team will come back with a layout proposal, material options and a quotation for the wardrobe package, matched to the rest of your joinery and finishes. Contact PHILLIP on WhatsApp +86-13928214007 or email santerson@qq.com to start the specification.