A swim spa is one of the heaviest, most technically sensitive items to move across a border. The Outdoor Swim Spa WS-S12-T measures 11740 x 2200 x 1470 mm as listed in our catalogue, which means the shell is planned around a dedicated lifting operation rather than an ordinary pallet delivery. Below is the practical sequence we follow on project orders, so that buyers, contractors and site managers can prepare the receiving side before production starts.
1. Lock the configuration before anything else
Delivery planning starts with the specification sheet, not with the freight forwarder. The WS-S12-T is built on our configurable swim and hydrotherapy platform: the catalogue record shows a control system (1 set), a swim training system (1 set), 2 water pumps, 1 filter pump, 73 jets in total, 1 LED light plus 50 small LED lights, and a total power figure of 7.65 kW. Optional items on this range include UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps.
Each option changes the crate count, the electrical package and the site preparation work. A heat pump or sand filtration unit adds equipment that ships separately and needs its own location on the plant room drawing. Please confirm the finished configuration in writing before we release production, because a change after the crates are packed normally means re-work and a later sailing.
Electrical data to agree at quotation stage: supply voltage, frequency, phase count, dedicated circuit rating, isolation and protection devices, and control-system wiring interface. The 7.65 kW total power figure is the catalogue value for the base configuration; add the draw of any selected heat pump or extra pump when your electrician sizes the supply.
2. Check the site, the access route and the crane
A shell of this length needs a clear path from the kerb to the final position. Before we book the container, ask your site team to confirm:
- Ground bearing capacity and level for the prepared base, plus drainage around the installation pad.
- Gate width, turning radius and overhead clearance (power lines, tree branches, roof overhangs) along the route.
- Whether the shell arrives as one unit or in sections for your address, and how the sections are reassembled and sealed on site.
- Lifting gear required: crane or hiab truck size, lift points, and whether the delivery vehicle can stand on the public road or needs a permit.
- Who supplies the base, the electrical connection and the water fill — these are normally site-side works carried out by your contractor.
Send us photographs and a simple sketch of the access route with the order. It is far cheaper to resolve an overhead cable on paper than to have a crane demobilised on delivery day.
3. Choose the freight mode and the Incoterms
Oversized swim spa shells normally move by sea, in a container or as flat-rack/out-of-gauge cargo depending on how the sections are packed. Air freight is rarely economic for this category, but our Furniture Logistics and Door-to-door Delivery service covers sea, air and rail forwarding, so smaller accessory consignments — spare pumps, steps, control components — can follow by a faster route if your programme needs it.
Decide the delivery term early, because it fixes who is responsible at each handover:
| Term | Who arranges ocean freight | Who clears customs at destination | Who carries goods to the final position |
|---|---|---|---|
| FOB / CIF | SANTERSON to destination port | Buyer or your broker | Buyer |
| DDP / door-to-door | SANTERSON | SANTERSON | To the delivery address agreed in the contract |
Duties, import permits and inspection requirements vary by country and change over time. We prepare commercial invoices, packing lists and certificates of origin as part of the shipment paperwork, but the applicable tariff classification and duty rate for your import should be confirmed with your customs broker before the vessel sails.
4. Packaging, loading and the paperwork set
Shells are packed in export-grade crating with edge protection for the shell surface, jets, LED fittings and glass components, and the pumps and control system are boxed separately so that they can be stored indoors until installation. Container loading is planned against the crate list, and photographs of the loaded container are taken for the shipment file.
A complete set normally comprises: commercial invoice, packing list with crate marks, bill of lading, certificate of origin where required, and any import documentation your country calls for. We also arrange cargo insurance on request — for a single high-value project consignment we recommend covering it explicitly rather than relying on the carrier's limited liability.
5. Build the receiving window into your programme
Work backwards from the date you want the spa operational, and leave time for each of these steps: production of the confirmed configuration, factory testing, crate packing, inland haulage to port, ocean transit, customs clearance, inland delivery to site, crane placement, assembly and sealing, electrical connection, fill, commissioning and handover. Transit times vary with routing, port congestion and inspection holds, so a project that must be ready for a fixed opening date needs buffer in the programme.
For villa and hospitality packages we coordinate the swim spa alongside the rest of the order through our One-stop Furniture and Building Materials Supplier service, so outdoor furniture, wall and ceiling finishes, lighting and cabinetry can be consolidated into one programme instead of several unrelated deliveries.
6. Installation, commissioning and after-sales
After the shell is placed, our Furniture Installation and After-sales Support service covers on-site installation guidance, inspection against a snag list, warranty handling and spare parts supply. Ozone sanitisation, filtration and the swim training system are commissioned together, and we provide operating instructions for the control system so your facilities team can run daily filtration and water care correctly.
Keep the crate list, the commissioning record and the model designation WS-S12-T with your building file. Spare pumps, jets and LED components are ordered against that configuration record, which avoids the wrong part being sent years later.
Before you order: a short checklist
- Configuration confirmed in writing, including options such as heat pump, UV sterilisation, sand filtration, insulation and steps.
- Electrical supply data agreed, sized for the base 7.65 kW plus any added equipment.
- Site base, drainage, access route and crane plan signed off by your contractor.
- Incoterms and clearing party fixed; duty exposure confirmed with your broker.
- Delivery address, access hours and lifting arrangements booked for the arrival window.
Catalogue dimensions, equipment counts and power figures quoted above are transcribed from the WS-S12-T product page. The exact equipment included and the electrical requirements depend on the configuration you select, so both are confirmed with our project team before production.
Planning your project order
Planning a project order for the WS-S12-T or another model in the Swimming Pools and Swim Spas range? Send us the delivery address, the configuration you want and your target on-site date through our contact page, and we will return a crate list, freight option and delivery plan for that address.