A single vanity looks like a small line item on a bathroom schedule, but it is one of the few components where cabinetry, stone, ceramics, tapware, lighting and wall finishes all meet in one place. When a buyer sends a request for quote that names only "single vanity, 900 mm", every supplier fills the gaps differently — and the prices come back impossible to compare. Here is what to put in the enquiry so the quotation you receive is complete, comparable and buildable.

Start With the Room, Not the Product

Before listing dimensions, tell the supplier what kind of project this is. A single vanity specified for a guest powder room in a private villa, a main ensuite, and a guest bathroom across thirty apartment units each carry different expectations about durability, storage depth, finish consistency and how many identical pieces must match. State the project type — villa, hotel, apartment or office fit-out — and the number of bathrooms involved, so the manufacturer understands whether this is a one-off made-to-measure piece or a repeated specification that has to be produced consistently.

If you are sourcing from a one-stop furniture and building materials supplier, mention the adjacent scopes in the same enquiry. Bathroom vanities sit next to countertops, basins, mirrors, mirror cabinets, vanity lighting, wall panels and flooring. When those items are quoted together against one set of drawings, the supplier can align finish names, heights and reveal dimensions instead of leaving you to reconcile three separate catalogues.

The Specification Block: What Must Be Written Down

A quotable single-vanity enquiry carries seven groups of information. Missing any one of them turns the quotation into an estimate rather than a price.

GroupWhat to include
Dimensions and clearancesOverall width, height and depth; finished floor level; wall-to-wall opening; clearance for doors and drawers to open; position of existing waste and water outlets.
Mounting typeFloor-standing or wall-hung; if wall-hung, the wall construction (stud, brick, concrete) and where reinforcement or blocking is required.
Carcass and door styleBox construction, drawer configuration, soft-close hardware, handle or handleless profile, internal shelving layout.
FinishColour code or veneer species, matte or gloss, lacquer/acrylic/melamine/veneer preference, and whether the finish must match other joinery in the project.
Countertop and basinCounter material and thickness, edge profile, integral or separate basin, undermount or above-counter vessel, tap hole count and hole spacing, overflow requirement.
Tapware and accessoriesWhether the supplier is quoting tapware, pop-up waste, mirror, mirror cabinet or vanity lighting — or whether those are excluded and supplied locally.
Quantities and locationsPieces per bathroom type, total units, and a labelled plan or elevation for each location.

For made-to-measure work this level of detail is not optional. The Single Vanity in our vanities collection, for example, is offered with made-to-measure sizing, material and finish options and a layout tailored to the project — which means the quotation can only be as accurate as the dimensions and finishes you supply. The same applies to related configurations such as the Floating Vanity and the Integrated Countertop Vanity, where the countertop, basin and storage arrangement all have to be confirmed before a firm price is issued.

Drawings Beat Descriptions Every Time

Attach at minimum a dimensioned plan of the bathroom and one elevation of the vanity wall. Mark on them: finished floor level, finished ceiling level, the centre line of the waste outlet, the height of the water inlets, the position of any switch or power point, and the swing direction of the door. A supplier working from a sketch with those six annotations can price a wall-hung installation without guessing whether reinforcement is needed inside the wall.

If you already have a design intent, include a reference image and say what matters most about it — the floating look, the handleless drawer front, the full-height mirror cabinet, or the stone return to the side wall. Manufacturers doing custom and OEM work routinely match an existing joinery finish across vanities, wardrobes and kitchen cabinetry when they are given a sample reference or colour code rather than a photograph.

Ask for the Quote in a Structure You Can Compare

Send the same line-item template to every supplier and require it back. Split the price into: vanity carcass and doors; countertop and basin; tapware and waste; mirror or mirror cabinet; lighting; packaging; freight; and installation items. A single lump-sum figure hides what is actually being offered, and it is the main reason two quotes for a "900 mm single vanity" can differ by a wide margin without either supplier doing anything wrong.

  • State the delivery terms you want quoted. Ex-works, FOB, CIF or delivered-to-site change the number substantially. Ask each supplier to price the same Incoterm so the comparison is honest, and confirm duties and import requirements for your own country separately.
  • Ask what is excluded. Tapware, wall tiling, waterproofing, plumbing and electrical work are commonly outside a vanity quotation even when they appear in the supplier's photographs.
  • Ask for the specification sheet back with the price. Material, board type, finish system, hardware brand or grade, countertop thickness — written down, not implied by a picture.

Practical rule: if your enquiry does not name the mounting method, the counter and basin arrangement, and the finish reference, you are not requesting a quote — you are requesting an opinion. Suppliers will answer, but they will each answer a different question.

Do Not Forget the Items Around the Vanity

Two accessories decide whether the finished bathroom reads as designed or as assembled: lighting and storage. Vanity Lighting should be quoted with the vanity so the fitting width, mounting height and colour temperature sit correctly against the mirror and the counter height. A mirror cabinet adds concealed storage that a slim single vanity rarely provides on its own, but it changes the required wall depth and the electrical position — details that must be in the enquiry before production, not after.

Where the bathroom schedule also includes shower systems, toilets, basins, flooring and wall finishes, grouping them into one enquiry against one set of drawings reduces the coordination work later. That is how interior fixtures are normally specified on villa and hospitality projects: as a coordinated package rather than a list of independent purchases.

A Pre-Send Checklist for Your RFQ

  • Project type, country, and number of bathrooms or repeated units
  • Dimensioned plan plus one elevation per vanity location
  • Overall width, height, depth and finished floor level stated
  • Floor-standing or wall-hung confirmed, with wall construction noted
  • Drawer and door layout, hardware preference, handle or handleless
  • Finish reference: colour code, veneer species, gloss or matte
  • Countertop material, thickness, edge profile and basin type
  • Tap hole count and spacing; overflow required or not
  • Explicit list of what the supplier should and should not price
  • Delivery term (Incoterm) stated and identical across all quotes
  • Total quantities with a location label for each piece
  • Requested quotation validity period and lead time in writing

Putting It Together

A good request for quote for a single vanity does three things: it fixes the physical facts (dimensions, mounting, outlets), it fixes the aesthetic facts (finish reference, counter and basin arrangement, lighting), and it fixes the commercial frame (what is included, which Incoterm, how many units). Give a supplier all three and you receive a price you can compare line by line against your competitors' quotes. Give them two of the three and you will spend the next two rounds of emails re-quoting.

SANTERSON has been manufacturing furniture and building materials in China since 2008, with custom and OEM capability across vanities, cabinetry, basins, lighting, wall panels and flooring for villa, hotel and office projects. Send a labelled plan and the specification block above through the contact page, and the response will come back as a line-item price you can put straight into your comparison sheet.

Confirm dimensions, materials, hardware, electrical and plumbing requirements for each project configuration before production. Freight terms, duties and delivery scope should be verified with the supplier for the destination country.