A statement pendant is the fixture a dining room is judged by, and it is rarely bought straight off the shelf. If your project has a long table, a tall living room or a ceiling that will not carry the standard suspension, the right next step is a written quotation request rather than a catalogue order. This guide explains what to send when you want a Modern Transparent Glass Tube Pendant Light, Minimalist LED Chandelier for Dining Room & Living Room quoted as a made-to-order piece, and what we need in return to price it properly.

What the fixture is, before you ask for a price

This pendant is built from transparent glass tubes joined by black connectors, with glowing LED rings set along the vertical suspension. The effect is layered and linear: light reads as a series of suspended rings rather than one solid shade, which keeps the fixture visually light above a dining table and gives a living room a sculptural centrepiece without blocking sightlines across the room. It belongs to our wider lighting product range, alongside ceiling, wall, floor and other pendant designs.

Because the composition is modular, it adapts to a room instead of forcing the room to adapt to it. Tube count, drop length and arrangement are worked around your table or stairwell; connector finish and light colour are confirmed at quotation stage. That is exactly why we ask for dimensions before quoting: the same fixture above a 2.4 m table and above a 3.6 m table is not the same order.

The information that makes a quote accurate

Send these six items in your first message and we can normally come back with a workable specification and price, instead of opening another round of questions.

  • Room and mounting: dining room, living room, entry void or reception; ceiling height, ceiling finish, and where the ceiling rose can sit.
  • Table or coverage dimensions: length and width of the table or the area the pendant has to serve, plus the hanging height you want above that surface.
  • Quantity and locations: how many pieces, and whether they repeat across villas, suites or guest rooms. Repeat quantities change both pricing and production planning.
  • Light preference: warm or cool output, dimming requirement, and whether the driver must stay reachable from an accessible hatch or junction box.
  • Finish direction: connector colour, tube tint if any, and metal finish. A photo of the surrounding palette tells us more than a written colour name.
  • Destination and delivery term: project city, port or site address, and your preferred Incoterm. This decides packaging, freight method and documentation.
Typical useDining room, living room, villa lounge, hotel suite reception, restaurant
Main materialsTransparent glass tubes, black connectors, LED light source
Set at quotation stagedrop length, arrangement and scale, connector finish, light colour, dimming set-up
What we need from youCeiling height, table or coverage dimensions, quantity, destination, delivery term
Confirm before orderingApproved specification drawing, electrical specification for the destination market, packaging and loading plan

How the request moves through our process

A lighting enquiry follows the same route as any other project order. Through our interior design services, we start from your brief and space layout, then return a proposal covering fixture scale and how it relates to the surrounding furniture. Once you approve the specification and the quotation detail, the piece enters production with the rest of your order rather than being sourced separately.

That grouping matters on live projects. A pendant ordered together with the dining table, flooring, wall panelling and cabinetry arrives in one coordinated shipment, on one packing list, with a single contact for snags. Our turnkey interior project solutions place furniture and building materials under the same contract, so lighting is specified once and installed once instead of being chased across three suppliers.

Custom and OEM options you can ask for

Beyond sizing, we take bespoke requests on finishes, textures and branding through our custom and OEM service. For lighting this usually means a connector colour matched to ironmongery elsewhere in the scheme, a tube arrangement redrawn to fit a ceiling grid, or packaging and labelling prepared for a contractor's own brand. Tell us what the fixture has to sit alongside, and we will be straight with you about what glass can do and where a different fixture family would serve better.

Shipping, installation and after-sales

Glass travels in purpose-built packaging with a loading plan agreed before the container is packed. Freight moves by sea, air or rail depending on quantity and programme, with commercial invoices, packing lists and origin documents handled on our side. On arrival, installation and inspection are coordinated with your site team, and warranty cover plus spare parts are arranged for the components most likely to need replacing years later, mainly drivers and individual tube sections.

Ready for a price? Send ceiling height, table dimensions, quantity and destination to SANTERSON, and we will return a specification sheet and quotation for the glass tube pendant. Phone / WhatsApp: +86-13928214007 (PHILLIP), email santerson@qq.com, or use our contact page.

Final specifications, finishes and electrical configuration are recorded on the approved quotation drawing for each project. Please have the destination market's electrical and mounting requirements checked by your local electrician before installation.