A set of white matte cabinets usually arrives on site months after the design is signed off, and the packaging is the one part of the order that most buyers specify last. Cabinet doors are large, flat panels with a low-sheen surface that shows every scuff, corner chip and pressure mark, so how they are packed decides whether the installation crew starts work or starts filling out a damage report. Before you approve a packing method in an order confirmation, here is what to put in writing.

Why the matte surface changes the packing brief

A white matte finish does not behave like a high gloss one under transport stress. Gloss panels are usually shipped with a protective film that is peeled off on site, and light scratches tend to catch the eye immediately. A matte panel can take a shallow abrasion or a pressure bruise that only becomes visible once the panel is lit from the side in the finished kitchen — by which time the packing material has gone and the container has been emptied.

Two practical consequences follow. First, ask which protective layer the supplier applies to the matte face (film, interleaving sheet or corner protection) and whether it stays on during installation, because installers working in a dusty site can trap grit under a film and mark the surface when they remove it. Second, agree now who photographs the panels at each stage — at loading, at container devanning and after unpacking — so a claim has evidence rather than a phone call.

Packing method: assembled boxes or flat packs

Custom cabinetry is normally shipped one of two ways, and the choice affects both cost and risk. Confirm which one your quotation assumes before you compare two suppliers' prices.

Packing methodWhat it means on siteWhat to confirm in writing
Assembled boxes (carcass and door packed as built)Faster installation, fewer parts to reconcile, but the shipment takes more cubic metres and needs careful bracing inside the crate.Crate material and thickness; internal bracing and edge protectors; maximum stack height; whether doors are packed on the carcass or separately.
Flat packs / knock-down panelsDenser loading and lower freight per cubic metre, but more hardware, more fixings to reconcile, and more panel edges exposed during handling.Panel-by-panel labelling against the shop drawing number; hardware bag per unit; edge banding protection on both long edges; whether pre-drilling matches the delivered dimensions.

Because white matte cabinets are made to measure for each project — our product records list made-to-measure sizing, selectable material and finish, and a layout tailored to the space — every crate should be labelled with the same reference your drawings use. Ask for a crate list keyed to the drawing numbers, not just "12 boxes".

Documents that must match the crates

For an international order the paperwork travels as fast as the cargo, and customs clearance stops when the packing list disagrees with the goods. The logistics service we provide covers freight forwarding by sea, air and rail together with customs documentation — commercial invoices, packing lists, certificates of origin and import permits — plus container loading and shipment tracking through to door-to-door delivery. Ask for these items before the goods leave the factory:

  • A crate list or packing list that names every crate, its contents and its drawing reference, so the site team can check off deliveries room by room.
  • The commercial invoice with a clear description of materials, not just "cabinets", to avoid valuation queries on import.
  • Markings on each crate: project name, destination, crate number in the set ("7 of 19"), and handling warnings for panels.
  • A written note of what is inside each crate, so nothing has to be opened twice — once at the port for inspection and again on site.

Container loading and sea-leg conditions

White panels are heavy relative to their thickness, and a container moves, vibrates and sweats. Confirm with the supplier how the load is secured: dunnage between crates, strapping pattern, blocking against the container walls, and whether moisture barrier or desiccant is used for a long sea leg. If your cabinets share a container with other goods from the same order — flooring, grey matte cabinets for a second kitchen, or custom built-in kitchen cabinets for apartments and hospitality units — ask how heavy items are kept off panel faces and how the mixed load is sequenced for unloading.

Also settle the insurance question in the order terms. Our logistics page lists cargo insurance options and a dedicated coordinator for each shipment; whichever Incoterms you buy on, be explicit about who insures the panels, for what value, and where your claim starts if damage appears only after devanning.

Receiving checklist before the installers start

1. Crate count first, contents second. Count crates against the packing list at the delivery point and record any crate that is crushed, split or re-taped before signing.

2. Open one crate per panel type. Check the matte face of a sample door from each type under side light, and check the edge banding on both long edges.

3. Verify dimensions against the shop drawings for at least one tall unit and one run of wall units before fixing anything to the wall; made-to-measure cabinetry only fits if the delivered sizes match the approved drawings.

4. Reconcile hardware against the crate list — hinges, runners, handles or integrated pull profiles for handleless matte cabinets — and photograph any shortfall on the spot.

5. Report damage the same day, with photographs of the crate, the panel and the protective layer as found.

What to put in your purchase order

A short packaging clause prevents most disputes. In plain terms: packing method (assembled or flat pack); protective layer on the matte face and who removes it; crate material, edge protection and stacking limit; crate numbering with a matching packing list keyed to drawing references; loading method and moisture protection for the sea leg; insurance responsibility under the agreed Incoterms; photographic records at loading and devanning; and a claim window stated in days from delivery.

Figures such as transit times, duty rates and response windows vary by destination and by shipment. Treat any number quoted in marketing copy as a starting point for your own quotation, and confirm the terms that apply to your project before you sign.

Next step

Send us your kitchen drawings together with the destination address, and we will confirm the packing method, crate list, loading plan and delivery scope for that shipment in writing, so nothing about the packaging is left to be discovered at devanning.

SANTERSON manufactures white matte cabinets and other custom cabinetry for villa, apartment and hospitality projects, with design, production and door-to-door delivery handled by one team. See furniture freight by sea, air and rail for the logistics scope, or contact us to start a quotation.